Board of Supervisors

Minutes — September 12, 2002

Date
September 12, 2002
Type
Minutes
Year
2002
File
PDF · 193 KB

Download original Open in browser

Document text

Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 3,628 words

MAIDENCREEK TOWNSHP BAORD OF SUPERVISORS

SEPTEMBER 12, 2002 7: 00 PM

PRESENT: Roy Timpe - Supervisor, Robert Kopfer – Supervisor, Gloria Kemmerer – Supervisor,
Eugene Orlando - Solicitor, Tom Unger – Engineer, Terry Manmiller – Operations Director, Ruth
Manmiller – Recording Secretary

GUESTS: Cindy Stump, David Anspach, Daniel Miller – Blandon Fire Chief, Gloria Kline, Tina Poole,
Larry Kunkel, Claude Beaver, James Schoellkopf, Tammy Prokop, LaRue Younker, Kelly Downs, Diane
Hollenbach, Dean Focht, Harold Burgert, David Schumacher, John Weller, Yvonne Scalese, Ann
Santiago, Robert Hanna, J.D. Krafczek, Henry Koch, Jr., Adam Krafczek, Leslie Heere, Fred Giorgi,
Donna First, Nancy Werner, Howard Young, Fay Isamoyer, Mohamad Farvardin.

Roy Timpe called the meeting to order at 7:00 PM and asked everyone to pause for a moment of silence
in rembrence of 9/11 to be followed by the pledge to the flag.

PUBLIC COMMENT

The Board asked the guests to sign the comment sheet that was being passed around and list their items of

concern:

Donna Fuerst 309 Faith Dr. Blandon,PA When will the speed signs defining citation fines be installed?

Leslie Heere 205 Longleaf Dr. Blandon ,PA Concerns about the mandatory recycling.

Ann Santiago 217 Spirit Ct. Blandon ,PA Was letter sent to residents to clear flood way?

Yvonne Scalese 213 Spirit Ct. Blandon ,PA Flooding / Removing fixtures from flood way, bills.

Tammy Prokop 468 Hoch Road Blandon ,PA Dog mess / proposed trees to be installed at the rear of property.

Tina Poole 19 Lee Spring Road Blandon ,PA Martin’s weeds, vacant trailers, project status.

Larry Kunkel 5 Lake Shore Dr. Fleetwood,PA Noise @ Tom’s – 5:00 AM.

Kelly Downs 456 Hoch Road Blandon Dog mess / proposed trees to be installed at the rear of property.

Fay Isamoyer 8717 Allentown Pike Fleetwood, PA Fleetwood School issues

The Board briefly answered the questions asked by the guests and promised to address several of their
issues throughout the meeting and/or during new business.

POLICE REPORT

Officer Charles Hobart presented the Northern Berks Regional Police activity report for August 2002.

MAIDENCREEK ONTELAUNEE LEESPORT TOTAL

Patrol Hours 739.5 454.75 319.5 Admin. 1513.75

Assignments 329 184 139 45 697

Citations Issued 108 46 28 182

Fines Collected $2,952.35 $2,318.35 $ 963.22 $6.233.92

Officer Hobart:
1. Distributed information pertaining to West Nile Virus.
2. Informed guests how to properly report culprit dog owners that do not clean up after their pet.
3. Detailed recent Speed Enforcement on Hoch Road. Speeds of 76 mph and 106 mph were
clocked.
4. Informed residents that the officers are monitoring the trash trucks prior to 6:00 AM.
5. Informed the guests that new zones will be established for speed enforcement.

1

MAIDENCREEK TOWNSHP BAORD OF SUPERVISORS

SEPTEMBER 12, 2002 7: 00 PM

ANNOUNCEMENTS

8/8/02 Executive Session – Personnel and Litigation

9/3/02 Zoning Hearing – Larmar Advertising

9/5/02 Hearing – DJ Gauby – Maidencreek vs. Ray Martin

9/5/05 Hearing – Vacation of East Wesner Road

10/02/02 Hearing - Billboards, Slater Road, and Traffic Ordinance Amendments 7:00 PM

9/24/02 Variance – Maidencreek Plaza 7:00 PM

MINUTES

Robert Kopfer made a motion, seconded by Gloria Kemmerer, accepting the following minutes with listed
corrections:

8/6/02 Recycling Workshop and Public Comment Meeting,
8/8/02 Board of Supervisors Meeting - Page 8 Recycling Workshop and Public Comment for

September 29, 2002, instead of August 29, 2002,
8/17/02 Special Meeting for Hospitalization,
8/29/02 Recycling Workshop and Public Comment Meeting – Page 3 September 10, instead of

September 12
Page 3 $10.00/ton should read
“with a floor of $10.00/ton.”
All Board members voted, “Aye.” Motion carried.

7:30 PM – OPEN BIDS FOR CHIPPER
The following bids were received and opened for the chipper:

1. Larry Kunkel $1,111.11
2. Manny Gutierrez $1,200.00

Robert Kopfer made a motion, seconded by Gloria Kemmerer, to award the sale of the Chipper to the
highest bidder, Manny Gutierrez for $1,200.00. All Board members voted, “Aye.” Motion carried.

ENGINEER’S REPORT

SHADOW RIDGE, Phase III
Gloria Kemmerer made a motion, seconded by Robert Kopfer, to re-approve Shadow Ridge, Phase III
final plan. All Board members voted, “Aye.” Motion carried. Shadow Ridge, Phase III received final
approval on June 10, 2002 however, the ninety day recording period lapsed before all contingencies were
met.

SHADOW RIDGE, LOC
Gloria Kemmerer made a motion, seconded by Robert Kopfer, authorizing the Solicitor to notify the
developer of Shadow Ridge to extend his Letter of Credit to 10/21/02, or the township will be forced to
drawn down on the Letter of Credit. All Board members voted, “Aye.” Motion carried.

2

MAIDENCREEK TOWNSHP BAORD OF SUPERVISORS

SEPTEMBER 12, 2002 7: 00 PM

ENGINEER’S REPORT, continued:

MELROSE PLACE
Gloria Kemmerer made a motion, seconded by Robert Kopfer, to accept Melrose Place review extension
letter effective to 10/31/02. All Board members voted, “Aye.” Motion carried. Revised preliminary plans
and a hydrological study were provided for the Township Engineer to review. Gloria Kemmerer made a
motion, seconded by Robert Kopfer, to grant the following waivers:

503.J – Requirement that no more than 20 residential units may be located along a single access
street and the single access street may not be more than 500 feet long.

503.F - Requirement of the safe stopping site distance at the vertical curve for the driveway on
Lidia Street from 200 feet to allow it at 160 feet.

515.D - Requirement on species of street trees.
All Board members voted, “Aye.” Motion carried.

R&C HEAVY MECHANICAL, LOC
Robert Kopfer made a motion, seconded by Gloria Kemmerer, authorizing the Secretary to return the
Letter of Credit for R&C Mechanical because all improvements are completed. All Board members voted,
“Aye.” Motion carried.

MEADOWBROOK
Meadowbrook developers asked for the Board’s approval to phase the Subdivision. Phases I & II would
be completed before any construction would begin on Phases III & IV, and the developer agreed to post
security for each phase at the time of construction. The overall plan has been approved. The developer
will submit phased plans of Meadowbrook for approval, not additional review. Roy Timpe made a
motion, seconded by Gloria Kemmerer, granting permission to the developer of Meadowbrook to proceed
with the phasing concept for the project, and subject to future approval the Township Solicitor and
Township Engineer are authorized to review all agreements to protect the Township interests.
Roy Timpe and Gloria Kemmerer voted, “Aye.” Robert Kopfer voted, “No.” Motion carried. Per
subdivision regulations, the project must be completed in a five year time period.

VILLAGE AT MAIDENCREEK
RESOLUTION 22 – PLANNING MODULES
Roy Timpe made a motion, seconded by Robert Kopfer, authorizing the Secretary to sign the Planning
Modules for Villages at Maidencreek. Roy Timpe and Robert Kopfer voted, “Aye.” Gloria Kemmerer
abstained. Motion carried.

BEDROCK STONE AND STUFF
No Action. Developer provided four additional sets of plans and replacement sheets for the existing
Bedrock Stone and Stuff plans.

TREE TOPS TOT LOT – PHASE I
Work is proceeding. Robert Kopfer made a motion, seconded by Gloria Kemmerer, authorizing a
$950.00 change order to extend a section of walkway to the curb along Sycamore Lane and install a
walkway to the play area to meet ADA standards. All Board members voted, “Aye.” Motion carried.

3

MAIDENCREEK TOWNSHP BAORD OF SUPERVISORS

SEPTEMBER 12, 2002 7: 00 PM

GLENMAR SUBDIVISION
This development is primarily located in Ruscombmanor Township. Storm water run off since the onset
of this development has increased to the Maidencreek Township area. The Board and the Township
Engineer feel that Ruscombmanor should be held accountable for the control of the stormwater from this
development.

MAIDENCREEK TOWNSHIP/RUSCOMBMANOR TOWNSHIP LINE
Inspection of the property provided no insight to determine where the township line might be located. An
issue of trailers that are in use with no visible type of septic system has taken precedence.

SPIRIT COURT PIPE EXTENSION
The Engineer sent a letter to the property owner at 245 Spirit Court who requested permission to install a
storm water drainage pipe from their property into the stream. The Engineer explained that this type
project would not be a township responsibility and that the property owner would be required to obtain
permits through DEP, since the pipe is already within 50’ of the creek banks.

LIGHTING TOUR – SEPTEMBER 30, 2002
The Township Engineer, lighting specialist Stan Stubby, the Board of Supervisors, and the Planning
Commission will conduct a tour of existing subdivisions. Everyone will be instructed to meet along
Henry Drive. The tour is being conducted for future lighting requirements in the municipality. The
Township Secretary was instructed to advertise the meeting.

PARK ROAD AND RT 73 (MAIN STREET) INTERSECTION
Penn Dot has scheduled a meeting on 9/20/02 with the Operations Manager, the Township Engineer, and
the Chief of Police to discuss the future improvements to the Park Road and Rt. 73 (Main Street)
intersection.

MAIDENCREEK COMMUNITY PARK
Work is proceeding.

HOCH ROAD CULVERT REPLACEMENT /E. WESNER ROAD CULVERT REMOVAL
The Board of Supervisors signed the DEP Permit Application. A letter was received from Berks County
Engineering rejecting funding at this time.

SUBDIVISION IMPROVEMENTS AGREEMENTS LOC/ESCROW RELEASE LETTERS
Robert Kopfer made a motion, seconded by Gloria Kemmerer, authorizing the Chairman to sign the
Subdivision Improvement Letters of Credit in the amount of $2252.60, with the remaining Subdivision
Letter of Credit payment for the Heffner Tract in the amount of $147,674.48 being withheld. All Board
members voted, “Aye.” Motion carried. The developer of the Heffner Tract when blasting has caused
considerable damage to Dries Road. Robert Kopfer made a motion, seconded by Gloria Kemmerer,
authorizing the Township Engineer to inspect the Heffner Tract for damages to Dries Road and forward a
list of damages to the Township Solicitor so he may inform the developer to repair all damages.
Improvement Agreement payments will not be signed until damages are repaired. All Board members
voted, “Aye.” Motion carried.

SEO REPORTS AND CONSTRUCTION STATUS REPORTS: The Engineer distributed SEO
reports and development/construction status reports to the Board.

4

MAIDENCREEK TOWNSHP BAORD OF SUPERVISORS

SEPTEMBER 12, 2002 7: 00 PM

GOLDEN MANOR III – TREES
The Township Engineer is prepared to present a plan for the tree planting in Golden Manor III to be
review by the Operations Director.

TRAILS, INC.
The Township Engineer reported that the developer for Trails, Inc. has completed everything, except for
the swale.

SOLICITOR’S REPORT

MARTIN RETIREMENT VILLAGE
The Township Solicitor reported that a hearing at District Justice Gauby resulted in Raymond Martin
being fined $2,000.00 ($1000.00 for each citation) for improperly maintaining his on-lot septic system.
He reported that two items remain outstanding before the developer may commence with his project.
Those items are M & A Excavating, LLC providing a certificate of liability insurance to Maidencreek
Township Authority, and confirmation of a location for a pipe.

FUTURE ACTION
10/02/02
A. Amend the traffic Ordinance

1. Uniformity of 35 mph speed limit on Schaeffer Road
2. No Parking on Golden Drive from Park Rd to Hoch Rd. on SW side
3. No Parking on the west bound side of Lake Shore Drive (Rt. 73) between Allentown Pike (Rt.

222) and Quarry Road.
B. Vacation of a portion of Slater Road

ORDINANCE 186 – VACATION OF EAST WESNER ROAD
Gloria Kemmerer made a motion, seconded by Robert Kopfer, to adopt Ordinance 186 for the vacation of
606.25 feet of East Wesner Road in between Hoch Road and Park Road (the area of the Community
Park). All Board members voted, “Aye.”

SHADOW RIDGE III
Robert Kopfer made a motion, seconded by Gloria Kemmerer, accepting the Letter of Credit and
Improvement Agreement for Shadow Ridge III. All Board members voted, ”Aye.” Motion carried. The
Solicitor will proceed with the agreement for the detention pond in Shadow Ridge.

MILDRED EDDINGER
Roy Timpe made a motion, seconded by Gloria Kemmerer, authorizing the Solicitor to notify Mrs.
Eddinger and Kenneth Shrom that there will be no action taken by the Board. The property lines and
neighbor’s porch dispute are the property owner’s responsibility. All Board members voted, ”Aye.”
Motion carried.

5

MAIDENCREEK TOWNSHP BAORD OF SUPERVISORS

SEPTEMBER 12, 2002 7: 00 PM

TREASURER’S REPORT $107,692.98
$104,480.37
General Fund Checking $ 19,480.37
General Fund Money Market $ 9,481.39
Payroll $ 10,000.00
Recreation Tax Checking $ 2,736.05
Recreation Tax Holding $ 1,034.28
Bennicoff (Pk.Rd. Lot 7A) $ 140.20
Golden Manor III Improvements $ 656.30
Retirement Village – Insp. $ 137.04
Blandon Meadows V, Ph II
Rajah Savings

Gloria Kemmerer made a motion, seconded by Robert Kopfer, to approve the listed expenditures and
report as presented for August 2002. All Board members voted, “Aye.” Motion carried. Copies of the
Treasurer’s Report were available for inspection.

ROAD REPORT

The Operations Director’s August 2002 Report was available for inspection, the following action was
taken:

Robert Kopfer made a motion, seconded by Gloria Kemmerer, authorizing the Operations Manager to
order two (2) signs at a total cost of $700.00 that defines the expense of a speeding citation. All Board
members voted, “Aye.” Motion carried.

Robert Kopfer made a motion, seconded by Gloria Kemmerer, authorizing the Operations Manager to
advertise for bids to salvage materials of the old Township Building in Molltown. All Board members
voted, “Aye.” Motion carried.

Harold Wagner an individual that uses Calcium Road to travel to his place of employment, complained
about the bushes and tree limbs along this roadway. The Operations Director will investigate.

The owner of Excelsior Brass, June Ave., Blandon, PA requested No Parking signs be installed along
June Ave. to prevent large trucks from parking along the roadway and partially on his property. The
Board instructed the Operations Manager to inform the owner of Excelsior Brass to post No Trespassing
Signs on his property. The Board will investigate the request further before any decision is made.

NORTHERN BERKS REGIONAL POLICE HEADQUARTERS
Chief Scott Eaken informed the Board members and the guests that the Northern Berks Regional Police
Department is currently leasing 3000 sq. feet of office space at the Pohl Corporation, Leesport Ave.,
Reading. When the department moved into this office space, it was understood that this was a temporary
solution for the department’s headquarters. The Chief (authorized by the Commission) was authorized to
investigate all possibilities for obtaining permanent headquarters for the department. After numerous
attempts to locate a building lot, a building, and/or a contractor that would meet our needs, a local
businessman presented an offer that deserved further investigation. Mr. Fred Gorigi has offered to
construct a building to meet our specifications on one of his building lots. The Commission (three
municipalities in the merger) would then enter into a lease agreement for 29 years. Final details must be
worked out to confirm construction expenses before an agreement can be produced. In order to keep the
project moving forward and control expenses, the developer requested assistance with the land
development plan.

6

MAIDENCREEK TOWNSHP BAORD OF SUPERVISORS

SEPTEMBER 12, 2002 7: 00 PM

The Board agreed that a land development plan must be presented and reviewed. They hoped that the
plan would not involve extensive review. They want to see an agreement before this project progresses.

The Township Engineer will consider preparing the land development plan.

OLD BUSINESS

Yvonne Scalese, 213 Spirit Court, Blandon, PA, stated she is still concerned about the flooding issue
near her home. She asked how soon the letters would be sent informing her neighbors they must remove
all fences, sheds and/or objects that would impede water flow near the rear of their properties. She can
not continue to live in her home with the constant threat of being flooded. The Township Engineer
repeated his findings about the increase of storm water to the area because of Glen Mar Estates. He stated
that the stream located at the rear of her property was not part of the flood plain study.

Tammy Prokop, 468 Hoch Road, Blandon, PA expressed her displeasure about future tree plantings at
the rear of her property as designated on the recorded plan. She has installed landscaping at the rear of
her property and does not want it disturbed. She included a complaint about dog owners who do not clean
up after their dogs in the open space.

Tina Poole, 19 Lee Spring Road, Blandon, PA stressed that the Weed Ordinance must be enforced
because Raymond Martin’s weeds are growing into her bushes. The Operations Director informed the
Board that a weed letter had been sent to Raymond Martin. Robert Kopfer made a motion, seconded by
Gloria Kemmerer, authorizing the Operations Director to send another weed letter to Raymond Martin.
All Board members voted, “Aye.” Motion carried. Roy Timpe made a motion, seconded by Gloria
Kemmerer, authorizing the Operations Director to prepare a weed letter, and the Township Secretary to
prepared a current statement of outstanding fees for Raymond Martin. Both letters are to be hand
delivered to Raymond Martin by Constable service. All Board members voted, “Aye.” Motion carried.

GLENN SANDRITTER – TREE TOPS
Robert Kopfer made a motion, seconded by Gloria Kemmerer, authorizing the Solicitor to investigate
the bankruptcy status of Glenn Sandritter to determine the proper course of action to enforce the weed
ordinance for several areas of the TreeTops Subdivision. All Board members voted, “Aye.” Motion
carried.

TIGH HOLDINGS
Robert Kopfer made a motion, seconded by Gloria Kemmerer, authorizing the Chairman to sign the
verification documents for Tigh Holdings for future litigation. All Board members voted, “Aye.” Motion
carried.

NEW BUSINESS

Gloria Kemmerer made a motion, seconded by Robert Kopfer, authorizing payment of 8 overtime hours
for Regina Sanders to compensate her for additional hours required to prepare for the September Board of
Supervisors meeting and to include additional compensation for this extended meeting as previously paid
for extended meetings to Ruth Manmiller. All Board members voted, “Aye.” Motion carried.

7

MAIDENCREEK TOWNSHP BAORD OF SUPERVISORS

SEPTEMBER 12, 2002 7: 00 PM

RESOLUTION 20-2002 – 2003 MMO
Gloria Kemmerer made a motion, seconded by Robert Kopfer, to adopt the Minimum Municipal
Obligation for the Maidencreek Township Non-Uniform Pension Contract #416571 in the amount of
$29,588.00. The Minimum Municipal Obligation amount must be in place as an estimating requirement
to fund the pension plan. All Board members voted, “Aye.” Motion carried.

RESOLUTION 21-2002 – Youth Aid Panel
Gloria Kemmerer made a motion, seconded by Robert Kopfer, to adopt Resolution 21-2002 – Youth Aid
Panel for Maidencreek Township to participation. Two Maidencreek Township residents and a Northern
Berks Regional Police Officer will be participants on a joint board of surrounding municipalities to work
with juvenile offenders. All Board members voted, “Aye.” Motion carried

SECERTARY’S QUESTIONS

LIFE INSURANCE
Gloria Kemmerer made a motion, seconded by Robert Kopfer, to increase the life insurance with Standard
Life Insurance from $40,000.00 to $50,000.00 as per employment contracts. All Board members voted,
“Aye.” Motion carried. This action is a result of the health insurance carriers that included $10,000.00
life insurance coverage being canceled.

HEALTH INSURANCE
Gloria Kemmerer made a motion, seconded by Robert Kopfer, designating a 15-day waiting period before
health insurance is provided for new full time employees. All Board members voted, “Aye.” Motion
carried.

ZWICKY REZONING REQUEST
Robert Kopfer made a motion, seconded by Gloria Kemmerer, instructing the Township Secretary to
forward David Zwicky’s rezoning request for a 33.64 acre tract along Buena Vista Road from Agriculture
to Industrial to the Berks County Planning Commission and the Maidencreek Township Planning
Commission. The Solicitor was authorized to prepare for the public hearing process for this rezoning
request. All Board members voted, “Aye.” Motion carried.

RECYCLING WORKSHOP
Next workshop is scheduled for October 8, 2002, 7:00 PM in the Maidencreek Township Building.
Gloria Kemmerer made a motion, seconded by Robert Kopfer, to include recycling facts in the next
Township newsletter. All Board members voted, “Aye.” Motion carried.

AGRICULTURE SECURITY BOARD
The Agriculture Security Board will meet September 16, 2003 at 8:30 PM to consider a request to add
15.43-acre tract owned by Elmer Ringler to Maidencreek Township Agriculture Security Area.

NO PARKING
Gloria Kemmerer made a motion, seconded by Robert Kopfer, authorizing the Solicitor to prepare an
ordinance to designate the west bound side of Lake Shore Drive (Rt. 73) as a no parking zone from
Allentown Pike (Rt. 222) to Quarry Road. All Board members voted, “aye.” Motion carried.
Hearing will be conducted October 2, 2002.

8

MAIDENCREEK TOWNSHP BAORD OF SUPERVISORS

SEPTEMBER 12, 2002 7: 00 PM

PARK AND RECREATION

Gloria Kemmerer made a motion, seconded by Robert Kopfer, to accept Tom Evanosky’s letter of
resignation from the Park and Recreation Board, and authorized the Township Secretary to send a letter
thanking him for his service. All Board members voted, “Aye.” Motion carried.

Gloria Kemmerer made a motion, seconded by Robert Kopfer, authorizing the Township Secretary to
send a letter thanking Lori Schnader for donating the remainder of Kid’s Cove funds to the Park and
Recreation Account. All Board members voted, “Aye.” Motion carried.

Terry Manmiller volunteered to inspect and repair the Blandon Fire Company Ball Field fence in a
satisfactory manner.

Robert Kopfer made a motion, seconded by Gloria Kemmerer, to move Kid’s Cove play equipment from
the Community Park to the Wyatt Drive Tot Lot. All Board members voted, “Aye.” Motion carried.

Robert Kopfer made a motion, seconded by Gloria Kemmerer to adjourn the meeting at 11:56 PM. All
Board members voted, “Aye.” Motion carried.

Respectively submitted,

Ruth M. Manmiller
Recording Secretary

CC: Board of Supervisors
Terry Manmiller, Operations Director
Orlando and Strahn Law Firm, Solicitor
Thomas Unger-Systems Design Engineering, Inc., Township Engineer
Ed Kopicki-Systems Design Engineering, Inc., Township Planning Commission Engineer
Planning Commission
Park and Recreation Board
Zoning Hearing Board and Alternates
Paul Herbein, Zoning Hearing Board Solicitor
Maidencreek Township Authority
Robert Hobaugh, Esq., Maidencreek Township Authority Solicitor
Barbara Hassler, Tax Collector
Daniel Miller, Fire Chief
Chief Scott W. Eaken, Northern Berks Regional Police

9

MAIDENCREEK TOWNSHP BAORD OF SUPERVISORS

SEPTEMBER 12, 2002 7: 00 PM

10

Archived from the Maidencreek Township website. Reproduced unaltered; not an official records repository.