Board of Supervisors

Minutes — April 10, 2003

Date
April 10, 2003
Type
Minutes
Year
2003
File
PDF · 180 KB

Download original Open in browser

Document text

Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 3,385 words

MAIDENCREEK TOWNSHIP BOARD OF SUPERVISORS

April 10, 2003 7:00 PM

PRESENT: Roy Timpe - Supervisor, Gloria Kemmerer - Supervisor, Robert Kopfer – Supervisor,
Eugene Orlando – Township Solicitor, Thomas Unger – Township Engineer, Ruth Manmiller –
Recording Secretary, Terry Manmiller – Operations Director

GUESTS: Bill Wiedemann, Todd Beaton, Brittany Beaton, Derek Beaton, Tiffany Webb, Missy
Wilson, Racshell Bean, Carol Werner, Linda Glass, Carl Weston, William Milyo, Wendy Milyo,
Donna Mountain, Dominic Caccese, Tina Poole, Gloria Kline, Harold Burgert Gary Rollman, Faye
Isamoyer, Paul Martin, Victor Kroninger, Ronald Kemmerer, Diane Hollenbach, Lori Hershberger,
Mark Zettlemoyer.

Roy Timpe called the meeting to order at 7:00 PM and asked everyone to rise for the pledge to the
flag.

POLICE REPORT

Officer Sean Showalter presented the March 2003 Northern Berks Regional Police Report as follows:

MAIDENCREEK TWP. ONTELAUNEE TWP. LEESPORT BOROUGH TOTAL

Patrol Hours 756.57 618.39 434.04 1809

Assignments 256 154 90 Admin. 37 537

Fines $2,668.65 $3,370.55 $1,600.44 $7,639.64

Todd Beaten 103 Tamarack Blvd., Blandon, PA asked Officer Showalter:
1. For information surrounding the recent drive-by shooting that happened at the Coliseum.
2. Where did the alleged victim come from and why doesn’t he remember being shot at?
3. Will there be additional patrols in this area now that this type of activity is occurring?
4. What type enforcement will be forthcoming to control the activities at the Club Coliseum?
5. What time of day did this shooting event occur?
6. How many officers are on duty at 2:30 AM?

He stated that noise, lighting, and parking conditions at the Coliseum Restaurant and Club are still a
problem. He feels that the noise ordinance is not effective or being enforced, club patrons are parking
on the street and then use near by residents’ private yards as a pathway to the club or as a bathroom,
and litter the neighborhood. He still can’t understand why the Coliseum was allowed to expand
because there is a definite parking problem, which he views a zoning violation. He stated the owners
of Coliseum’ had their attorney send him a letter informing him that his complaints were unfounded
and he should cease future complaints pertaining to the Coliseum. He stated that this letter did cause
him to stop complaining. He hoped that his concerns would be addressed. He questioned the use of
the “noise meter” for the noise problem.

Missy Wilson 102 Tamarack Blvd., Blandon, PA and Tiffany Webb, 100 Tamarack Blvd.,
Blandon, PA asked the number of casings the officers discovered along the Allentown Pike in the
vicinity of the shooting. They agreed that this type of establishment is not acceptable for this area.

1

MAIDENCREEK TOWNSHIP BOARD OF SUPERVISORS

April 10, 2003 7:00 PM

Officer Sean Showalter informed the guests:
1. That the recent drive-by shooting on the Allentown Pike (SR222) had nothing to do with
the Coliseum. The incident occurred on the Allentown Pike between the Tamarack Blvd.
and Route 73. The Coliseum was used as a landmark to describe the vicinity where the
event occurred.
2. All investigations to this point do not implicate the Coliseum in any way.
3. The alleged victim was not aware of any shooting while he was walking along the
Allentown Pike.
4. The alleged victim did originate from the Coliseum and was later cited for public
drunkenness.
5. The shooting call was reported at 2:30 AM.
6. Five casings were recovered along the Allentown Pike south of the Coliseum.
7. Police Officers are instructed to be in the area of the Coliseum every Friday and Saturday
evenings between 2:30 AM – 3:00 AM for security purposes.
8. At 2:30 AM three officers are on duty.
9. Residents should not to delay in reporting any parking, littering, and/or noise problems to
the police. However, if the vehicles are legally parked on the street there isn’t too much
that the Police can do unless the parked vehicle is blocking a private drive.

The Board informed Todd Beaton that his concerns are more zoning issues than police problems and
would be addressed under new business and any additional security measures that the Police
Department are taking should remain confidential. Roy Timpe informed Todd Beaton that Terry
Manmiller is trained to use the decibel meter and should be contacted by the Police if the
incident/complaint warrants a reading. He informed Todd Beaton to attend a Northern Berks Regional
Police meeting so that the Chief can answer the specific questions he was asking. He thought that no
parking on Tamarack Blvd. might be considered.

Faye Isamoyer, 8717 Allentown Pike, Fleetwood, PA asked Officer Showalter why the Police park
in the center lane of the Allentown Pike near Maria’s Pizza to control center lane traffic and nothing is
being done to control the center lane traffic on the Allentown Pike near Evansville Road. She stated
the center lane traffic still remains to be a traffic safety issue.

Officer Showalter stated that the Police Department parks in the area of Maria’s Pizza to watch for
passing in the no passing zone. He assured Faye Isamoyer that as the weather improves the Police
Department will step up their traffic controls.

APPROVAL OF THE MINUTES

Gloria Kemmerer made a motion, and seconded by Robert Kopfer, to approve the March 13, 2003
Board of Supervisors minutes. All Board members voted, “Aye.” Motion carried.

2002 AUDIT REPORT

Mark Zettlemoyer, of Reinsel & Company presented the Maidencreek Township 2002 Audit Report
that was submitted to the state. He explained that Reinsel & Company conducted the audit with
auditing standards generally accepted in the United States of America. Those standards require that we
plan and perform the audit to obtain reasonable assurance about whether the financial statements are
free of material misstatement. He outlined several notable expenditures, revenues, and findings to
assure the Board that Maidencreek Township’s finances are being effectively managed.

2

MAIDENCREEK TOWNSHIP BOARD OF SUPERVISORS

April 10, 2003 7:00 PM

Carl Weston, Chairman of the Maidencreek Township Audit Committee informed the Board that
the Audit Committee felt that the 2002 Audit was in order. He asked why the Maidencreek Authority
was mentioned in a Maidencreek Township 2002 Audit in relation to Act 537.

Tom Unger Township Engineer, explained that Act 537 is a state mandated study of public and non-
public sewer for the entire Township. In 1999 the Maidencreek Township Authority completed Phase
I of Act 537 examining the public sewer system in Maidencreek Township. Maidencreek Township
Board of Supervisors is currently working on Phase II of Act 537 that examines the non-sewered areas
of Maidencreek Township. Each entity shares a portion of the cost to prepare the Act 537 report
resulting in the Maidencreek Authority appearing in the Township Audit Report.

The Board accepted Reinsel & Company’s Audit Report for Maidencreek Township and thanked the
Audit Committee for their input. Copies of the Maidencreek Township 2002 Audit Report may be
obtained for a minimal copy fee from the Township Secretary.

PUBLIC COMMENT

Gary Rollman, representing the Berks County Bike Club thanked the Board for their consideration
for their annual bike time trial races that were conducted on Township roadways on the Northwestern
side of Lake Ontelaunee. He presented the Board with a $25.00 check from the Berks County Bike
Club to be utilized for Park & Recreation in the Township. The Board thanked Gary Rollman for his
contribution to the Township.

Racshell Bean and Carol Werner, 419 E. Wesner Road, Blandon, PA asked the Board to consider
changing the speed limit to 25 mph for the entire section of East Wesner Road from Park Road to
Hoch Road. They can not understand why the 300 block of East Wesner Road posted speed is 25mph
and the 400 block of East Wesner Road is posted 35mph. They feel that the residential growth
in the 400 block of East Wesner Road and the completion of the Community Park will result in
additional traffic traveling at 35mph or higher will result in unsafe conditions on this section of the
roadway. They asked the Board if sidewalk and curbing would be mandated due to the installation of
the Community Park.

Harold Burgert stated that the 400 block of East Wesner Road is not part of the development and is
considered a connector road that should remain at 35mph.

The Board stated at this time sidewalk and curbing is not being considered however, they can't predict
improvements that may become necessary in the future. The Board will address their concerns under
New Business later in the meeting. They invited Raschelle Bean and Carol Werner to wait until New
Business segment of the meeting.

Scott Adams, of Willow Creek Fuels, Inc. wishes to purchase the Agway property located on the
corner of Guldin Road and Park Road in Blandon. Prior to purchasing the property, they requested a
zoning clarification. They plan to increase their service to provide small propane sales that would
require a propane-pumping tank. This type of activity is not outlined in the Maidencreek Township
Zoning Regulations.

3

MAIDENCREEK TOWNSHIP BOARD OF SUPERVISORS

April 10, 2003 7:00 PM

Gene Orlando Township Solicitor, asked Scott Adams to express in writing the type of business
activities Willow Creek Fuels, Inc. want to conduct at the former Agway Station located at the corner
of Guldin Road and Park Road. A clearer understanding of the type business they have planned for the
property will allow him to research the zoning regulations pertaining to the property.

Robert Kopfer made a motion, and seconded by Gloria Kemmerer, authorizing the Township Solicitor
and the Township Engineer to review the business description planned for the Willow Creek Fuel, Inc.
for the property at the corner of Guldin Road and Park Road, Blandon, PA. All Board members voted,
“Aye. Motion carried.

Tina Poole, 19 Lee Spring Road, Blandon, PA, asked the Board about the status of the Martin
Retirement Village on-lot sewage problems and the pending construction of the modular home park.

Tom Unger Township Engineer, stated that the SEO is making regular inspections (10 inspections in
March) of the property and is waiting for his report. He is not aware of any pumping of the mal-
functioning system at this time. The construction of the modular home park is pending, and he is not
aware of anything that might be delaying the project at this time.

The Board was advised that Ray Martin’s liability insurance required under his Improvement
Agreements for Maidencreek Authority has been canceled.

ENGINEER’S REPORT

The Engineer reviewed the subdivision status and the letter of credits noting that all plans are current
and do not require any action at this meeting.

LAKESIDE MANOR, Phase I & II – Planning Modules
Pennsylvania Department of Environmental Protection (DEP) submitted their Lakeside Manor non-
municipal sewage system review letter outlining portions of the Planning Module that are incomplete.
The Township Engineer and Mr. Farvardin discussed the outstanding issues of the Lakeside Planning
Module and Mr. Farvardin promised to complete and/or correct the outstanding issues.

VILLAGES AT MAIDENCREEK
The Villages at Maidencreek development will be a gated, age restricted community with privately
owned roadways. Public sewer and public water will be supplied by Maidencreek Township.
Robert Kopfer made a motion, and seconded by Roy Timpe, to grant final approval for the Villages at
Maidencreek contingent upon the following:

1. The final plan is sealed and contains proof of ownership.
2. Off sight stormwater easements must be signed and deeds of dedications executed.
3. Park and Recreation fee-in-lieu of must be paid prior to releasing the plan for recording.
4. Improvement Agreements and Letter of Credit must be signed and in place.
5. Delivery of an executed declaration of condominium – one set must be recorded with the

plan one set will remain in the Township office. * The condominium association has been
activated and the by-laws implemented.
6. Maidencreek Township Authority approval conditions must be met.
7. Mr. Grande/Shadow Ridge and Mr. & Mrs. Mills must sign the plan because the storm
water easements will encroach on their properties.

Robert Kopfer voted, “Aye.” Roy Timpe voted, “Aye.” Gloria Kemmerer abstained. Motion carried.
4

MAIDENCREEK TOWNSHIP BOARD OF SUPERVISORS

April 10, 2003 7:00 PM

The Board, the Solicitor, and the Engineer researched and read the note on the Villages at Maidencreek
final plan that relates to the retention pond berm and landscaping. The developer must plant
landscaping on the berm of the retention pond per the wishes of the adjoining property owners.
The Solicitor advised Harold Burgert to contact the developer in writing stressing his concerns
surrounding the placement of trees along the retention pond berm.

TREE TOPS TOT LOT, Phase I
Tree Tops Tot Lot is completed, the Township will retain 5% funding for possible maintenance in the
Spring.

MAIDENCREEK COMMUNITY PARK
The Maidencreek Community Park excavation phase is complete. The Township will hold funding for
seeding and possible maintenance in the Spring.

HOCH ROAD CULVERT, EAST WESNER ROAD CULVERT, & PEDESTRIAN BRIDGE
The Engineer provided a rough draft depicting the placement of the walking paths for the Community
Park. The draft plan revealed Phase I of the walking paths will surround the area near the creek and
Phase II of the walking paths will surround the large sports fields. When the walking paths are
completed they will be connected to the existing paths that are installed in the Limestone
Development. Installation of lights may be considered along the walking paths. Golden Manor III
townhouse property owners near the creek can not locate their property pins. The Zoning Officer
stated that the property pins were installed for the sale of the individual properties in Golden Manor III.
The Board felt that it is not the Township’s responsibility to replace the property pins.

STORMWATER INVESTIGATION
Systems Design Engineering, Inc. completed the Letter of Map Revision (LOMR) application
for the Federal Emergency Management Agency (FEMA) flood plan. Gloria Kemmerer made a
motion, and seconded by Robert Kopfer, authorizing the Chairman to sign the LOMR application for
the FEMA flood plan revision. All Board members voted, “Aye.” Motion carried.

LIGHTING ORDINACE
The Maidencreek Township Planning Commission is discussing preparation of an ordinance based on
the joint field meeting that will include 25 feet height requirement, and 250 feet spacing between
fixtures.

COMPREHENSIVE PLAN REVISION/UPDATE
The Engineer provided a draft of suggested revisions and updates for Maidencreek Township
Comprehensive Plan for sections 1-6.

SUBDIVISION IMPROVEMENTS AGREEMENTS LOC/ESCROW RELEASE LETTERS
Robert Kopfer made a motion, and seconded by Gloria Kemmerer, authorizing the Chairman to sign
the Subdivision Improvement Letters of Credit in the amount of $891.31. All Board members voted,
“Aye.” Motion carried.

5

MAIDENCREEK TOWNSHIP BOARD OF SUPERVISORS

April 10, 2003 7:00 PM

DEVELOPMENT/CONSTRUCTION STATUS REPORT
A Development and Construction Status Report was provided for the Board to review.
Gloria Kemmerer stated that she would like to see outstanding items on the development construction
status report completed and removed from the report. The Engineer felt that as the weather clears
several of the outstanding items would be addressed.

SEWAGE ENFORCEMENT ACTIVITY REPORT
A Sewage Enforcement Activity Report was provided to the Board for review. The Engineer reported
the following on Martin on-lot sewage issue:

1. Samples are being collected and tested.
2. Sewage Enforcement Officer (SEO) issued a citation in December 2002 and because

Raymond Martin does not accept his mail, the citation remains at the District Justice office.
Gloria Kemmerer made a motion, and seconded by Robert Kopfer, authorizing Township
personnel to contact the District Justice to have a constable hand deliver the citation to
Raymond Martin. All Board members voted, “Aye.” Motion carried.
3. The cistern planned for the modular home park – phase II portion has not been started.
4. If Raymond Martin decides to obtain funding through Penn Vest, 6/1/03 is the first date that
Penn Vest may consider advancement of funds.
5. 4/22/03 Raymond Martin’s liability insurance for the Maidencreek Authority expires.

FULMER, Subdivision
The Fulmer subdivision is mainly located in Richmond Township with only the residue of the lot being
located in Maidencreek Township. As a courtesy the plan was forwarded to the Maidencreek Planning
Commission for review. The Planning Commission authorized their Engineer to inform the Richmond
Township Planning Commission of their decision to decline review of Fulmer Plan. The Board of
Supervisors is in agreement that they are the governing body that should have forwarded the Planning
Commission recommendations to Richmond Township pertaining to the Fulmer Subdivision.
Robert Kopfer made a motion, and seconded by Gloria Kemmerer, authorizing the Township Secretary
to notify Richmond Township in writing affirming the Maidencreek Township Planning Commission
recommendation to decline any review pertaining to the Fulmer Subdivision. All Board members
voted, “Aye.” Motion carried.

SOLICITOR’S REPORT

FOCHT/WEITZEL ANNEXATION PLAN
The Solicitor asked the Engineer if the property owners paid all the charges incurred for the
Focht/Weitzel Annexation. The Engineer promised to check their invoice status so the Solicitor may
complete this project.

RESOLUTION 9-2003 – RECYCLING REGULATIONS
Gloria Kemmerer made a motion, seconded by Roy Timpe, to adopt the Maidencreek Township
Recycling Regulations as prepared. All Board members voted, “Aye.” Motion carried.

The Solicitor reported that the bid documents for a recycling hauler are completed and the bids for the
recycling containers will be opened at the April 17, 2003 Board of Supervisors meeting.

EXECUTIVE SESSION 9:10 PM – 10:35 PM
The Board of Supervisors and the Solicitor discussed Bedrock litigation, Tigh Holding litigation, and
Township personnel during this executive session. No action was taken.

6

MAIDENCREEK TOWNSHIP BOARD OF SUPERVISORS

April 10, 2003 7:00 PM

SHENK/MILYO PROPERTY
The Solicitor thanked Mr. & Mrs. Milyo for forwarding the necessary documents for his review. He
still has concerns that the Milyo property does not front on a township roadway and that the only
access to the property is Steiner Place. Steiner Place is a dirt lane that is not maintained by the
Township. The Solicitor stated that he would prefer an opinion from the Blandon Fire Chief and the
Township Engineer prior to making a decision. He promised to make a decision by April 17, 2003
Board of Supervisors meeting.

ROAD REPORT
Copies of the March 2003 Operations Manager’s Report are available for review. Action was required
for the following:

RESOLUTION 10-2003- REIMBURSEMENT FOR SNOW REMOVAL
Robert Kopfer made a motion, and seconded by Gloria Kemmerer, authorizing the Operations
Manager as a designated agent for the Township to apply for state reimbursement for costs incurred for
snow removal February 16 – 18, 2003. All Board members voted, “Aye.” Motion carried.

Robert Kopfer made a motion, and seconded by Gloria Kemmerer, authorizing the Operations
Manager to provide barricades to close Calcium Road, June 7, 2003, 3:00 PM-11:00 PM for the
wedding celebration of Mr. Penndelton’s daughter. The Penndelton’s are the only residents that live
along the section of Calcium Road that will be closed. All Board members voted, “Aye.” Motion
carried.

TREASURER’S REPORT

Gloria Kemmerer made a motion, and seconded by Robert Kopfer, to accept the March 2003

Treasurer’s report All Board members voted, “Aye.” Motion carried.

General Checking $ 65,519.53

Payroll $ 1,622.20

General Fund Money Market $ 154,161.99

On Lot Sewage $ 5,152.96

Petty Cash $ 82.92

The Treasurer’s Report was not read, copies of the March 2003 Treasurer’s report are available for

inspection at the front desk.

Gloria Kemmerer made a motion, and seconded by Roy Timpe, to adjourn the April 10, 2003 Board of

Supervisors meeting at 10:52 PM and to conduct the remainder of this meeting on April 17, 2003.

Robert Kopfer stated that he did not want to close the meeting because he felt the remaining business
could be completed rather than conduct another meeting on April 17th.

Respectfully submitted,

Ruth M. Manmiller
Recording Secretary

7

MAIDENCREEK TOWNSHIP BOARD OF SUPERVISORS

April 10, 2003 7:00 PM

CC: Board of Supervisors
Diane Hollenbach, Maidencreek Township Board of Supervisors, Secretary
Terry Manmiller, Operations Director
Eugene Orlando, Orlando and Strahn Law Firm, Solicitor
Thomas Unger, Systems Design Engineering, Inc., Township Engineer
Ed Kopicki, Systems Design Engineering, Inc., Township Planning Commission Engineer
Planning Commission
Park and Recreation Board
Zoning Hearing Board and Alternates
Paul Herbein, Zoning Hearing Board Solicitor
Maidencreek Township Authority
Robert Hobaugh, Esq., Maidencreek Township Authority Solicitor
Joann Schaeffer, Maidencreek Township Authority Secretary
Barbara Hassler, Tax Collector
Daniel Miller, Blandon Fire Co. Chief
Chief Scott W. Eaken, Northern Berks Regional Police

8

Archived from the Maidencreek Township website. Reproduced unaltered; not an official records repository.