Attending: David Brown, Jim Schoellkopf, Jr., Joel High, Eugene Orlando,
Jr. - Orlando Law, Karen Pollock - Systems Design Engineering, Inc., and
Diane Hollenbach - recording secretary

Guests: Jana Eppihimer - Bursich Associates, Scott Miller - Stackhouse
Bensinger, Inc., Ron Reybitz and Nick Palouch - PPL, Bill Moore, Ed Nordahl
- Ludgate Engineering

David Brown called the Maidencreek Township Planning Commission meeting to
order at 7:30 P.M. in the Maidencreek Township Municipal Building and asked
everyone to rise for the Pledge to the Flag.

APPROVAL OF THE AGENDA
A motion was made by Jim Schoellkopf, Jr. to approve the Planning
Commission meeting agenda as presented. Joel High seconded the motion.
The Chairman asked for public comment on the motion. Hearing none, all
members voted, "Aye." Motion carried.

APPROVAL OF PRIOR MEETING MINUTES
A motion was made by Joel High to waive the reading of the October 1,
2008 regular meeting minutes and approve the minutes as presented. The
motion was seconded by Jim Schoellkopf, Jr. The Chairman asked for public
comment on the motion. Hearing none, all members voted, "Aye." Motion
carried.

COMMUNICATIONS - None

PUBLIC COMMENT - None

ENGINEER'S AGENDA
Review Period Expiration - None

ACCEPTANCE OF PLANS FOR REVIEW - None

PLAN REVIEW
Summit Crest 3 - Karen Pollock of Systems Design Engineering, Inc.
distributed the November 5, 2008 review letter for the plan, which proposes
83 residential units, in two phases, on 37.706 acres along the western side
of Lee Spring Road. Previous plans showed water and sewer provided by the
Maidencreek Township Authority. This plan version proposes a water supply
that does not come from the Maidencreek Township Authority but from an
independent community well supply and distribution system. There is an
existing final plan that will remain active, but will need to be withdrawn
before action is taken on this new submittal. A special exception and
variance were granted to the property in 2005 to allow a mobile home park,
reduce the side yard setback and allow duplex homes.
The two existing homes on the property, must meet the zoning setbacks
for rear and front yard. Scott Miller, consultant for the project, stated
that the existing homes would be connected to the public water and sewer
systems. Ms. Pollock stated that there was a lot of data missing from the
submittal. The following points were brought forth in discussion:

. The water system appears to have inadequate pressure for fire flow.
. It is not clear if the new system will be interconnected to the
existing system on Mt. View Lane.
. The DEP application has not been submitted for the water system.
. Security measures will need to be installed to protect the wells and
distribution system.
. Meters will still need to be installed.
. Construction notes have been removed. The Township is concerned that
the extra measures previously on the plan for the water system have
been removed. These are more important in a pressure system on steep
slopes.
. Some of the homes will be built on 5 to 15 feet of fill. This is very
significant. The note for testing lot 42 must be expanded to include
all homes built on more than 5 foot of fill. Compaction tests for each
lot will be required prior to building permit issuance.
. There is no note on the plan indicating that it is an age restricted
community.
. The water system should be built to the same standards of the
Maidencreek Township Authority.
. The water system requires more treatment than just disinfection. A
licensed operator will be responsible for PH, high manganese and
turbidity treatments.
. The wells and wellhead protection areas need to be taken out of the
open space calculation and open space will need to be added to the
plan.
. The Supervisors should reevaluate the escalation of cost of the road
improvements and the amount of contribution the developer committed to
in 2005.

No action was taken on the plan.

Esbenshade's Greenhouse - Karen Pollock of Systems Design Engineering, Inc.
distributed the November 5, 2008 review letter for the plan. The plan is
labeled preliminary and a final plan application was submitted. Waivers
were previously approved for this plan and the notes should be revised on
the plan. The well is still shown on the plan and the applicant believes
that he has a right to use the well even though the building is within 150
feet of the Maidencreek Township Authority's water line and the property is
connected to the Authority's water and sewer system. The applicant would
like to meet with the Supervisors to discuss this issue and his belief that
his retail business is agriculture under ACRE legislation. No action was
taken on the plan.

PPL Biomass Facility - Karen Pollock of Systems Design Engineering, Inc.
distributed the November 5, 2008 review letter for the plan. Ron Reybitz
of PPL stated that there were items needed for the conditional use hearing
that would not be ready by the hearing date. PPL asked to postpone the
hearing until a later date, probably in 2009, and agreed to cover the
notification and advertising costs. A written request for postponement
will be submitted by Friday. Ms. Hollenbach stated that she would mail
notices of cancellation to those that received the first notice and also
advertise the cancellation in the Reading Eagle. In the meantime, PPL will
address the issues in the Township's review letter. Some points brought up
were:

. Perimeter fence is required.
. What is the stack height? PPL is working with the PA DEP to determine
the stack height. At the moment it is thought to be 65 feet tall.
. The plan shows water wells that are monitoring wells, pipes that are
not actual wells and wells for the mulch processing. This needs to be
clarified and corrected. PPL representatives stated that they will
only be using one well with a withdraw rate at about 65 gallons per
minute.
. Discharge of process water may be to a tank instead of the detention
pond as previously planned.
. An agreement or the lease between PPL and WD Zwicky will need to be
submitted that covers use of common facilities like the driveway.
. Traffic impact information is missing for peak times.

Dave Brown asked if the system being proposed will add to the air
pollution. Nick Palouch of PPL stated that the pollutants will be below
100 ton per year and believes that it will actually be 40 ton per year.
The plant will be classified as a minor source by the PA DEP. The fuel for
PPL will be a different blend then the fuel used for Corstacks. There
should not be a source of odor. Mr. Brown suggested injecting the water
from the plant back into the ground. No action was taken on the plan.

Corrado Commercial - Karen Pollock of Systems Design Engineering, Inc.
distributed the November 5, 2008 review letter for the plan. There was
little discussion on the plan, since the developer was not present. The
developer was informed through this review that a small piece of property
he wishes to develop belongs to the Fleetwood School District.

SOLICITOR'S REPORT - None

NEW BUSINESS
2009 Meeting Dates and Time - A list of meeting dates was given to the
Commission. Everyone should confirm that the first Wednesday of each month
at 7:30 p.m. is still a good time to hold the Planning Commission meetings
in 2009.

OLD BUSINESS - None

Having no other business, a motion was made by Jim Schoellkopf, Jr. to
adjourn the November 5, 2008 Planning Commission meeting. Joel High
seconded the motion. All members voted, "Aye." Motion carried. Meeting
adjourned at 9:36 p.m.

Respectfully Submitted

Diane E. Hollenbach
Secretary

CC: Board of Supervisors Tom Unger, SDE Barbara Hassler
Planning Commission
Eugene Orlando, Solicitor Chief Scott Eaken Park &
Recreation Patrick Donovan
Dan Miller Authority Staff & Board Zoning Hearing
Board & Alternates

Archived from the Maidencreek Township website. Reproduced unaltered; not an official records repository.