Township Authority

Minutes — April 14, 2010

Date
April 14, 2010
Type
Minutes
Year
2010
File
PDF · 79 KB

Download original Open in browser

Document text

Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 1,717 words

MAIDENCREEK TOWNSHIP AUTHORITY
April 14, 2010

MEETING MINUTES

Attending Board Members: Robert Shinn, Earl Rothermel, Donald Keim, Pat Hecker
and Ken Schnader.

Also attending: Robert Hobaugh, Stevens & Lee, Jess Lichman, SDE, Patrick Donovan,
General Manager and Tammy Deysher as recording secretary.

Also in the audience: Susanne Schlegal, a resident of Maidencreek Township, Jason
Nix of Hollenbach Construction, Lon L. Seitz of Lon Seitz Inc., and Angelo Corrado of
Corrado Development.

Mr. Shinn called the April 14, 2010 meeting of the Maidencreek Township Authority to
order at 6:00 PM at the Maidencreek Township municipal building.

PUBLIC COMMENT

Mr. Donovan advised that two years ago, 15 W. Wesner Road, was to be shut off for
non-payment. The account was put to an off status, meanwhile the renter paid the bill
but the account was not put back to on status. The account was off from 1/17/08 thru
3/30/10, using 102,000 gallons for a total of $943.00. Mr. Donovan recommended a
10% discount and time to pay the bill.

A motion was made by Donald Keim, seconded by Earl Rothermel to give
$100.00 credit off the account also with time to pay it. All members present voted “Aye”
unanimously. Motion carried.

PLAN REVIEW STATUS

Villa at Maidencreek- Mr. Donovan advised the Board he came up with a proposed
rate system for the Villa’s at Maidencreek. This would be to get rid of the $1.75 fee and
make everyone pay $4.00 per 1000 gallons used. Mr. Donovan went over what the
annual revenue would be and the rates to consider:

Water
1. Existing residential water rates - $18.203.20 annually
2. Existing commercial water rates - $7357.80 (with the $1.75 rate included)
3. Proposed commercial water rates - $12986.40 (with the $4.00 rate included)
4. Hybrid combination water method - $14582.40

Sewer
1. Existing residential sewer rates - $26486.40
2. Existing commercial sewer rates - $14588.00
3. Proposed commercial sewer rates - $14588.00
4. Hybrid combination sewer method - $18746.00

Page 1

MAIDENCREEK TOWNSHIP AUTHORITY
April 14, 2010

MEETING MINUTES

The combined water/sewer quarterly fees will be as such:

Total annual water & sewer existing residential $44689.60
Total annual water & sewer existing commercial $21945.80
Total annual water & sewer proposed commercial $27574.40
Total annual combined hybrid sewer & water $33328.40

Tapping Fee Calculations

1. Residential water dwelling units - $203185.00
2. Commercial water calculation - $64318.80

Annual Difference - $138866.20
3. Residential sewer dwelling units - $363653.50
4. Commercial sewer calculation - $110986.20

Annual Difference - $252667.30

Combined water and sewer totals are as follows:

Total tapping water and sewer residential - $566838.50
Total tapping water and sewer commercial - $175305.00

Total one time tapping fee difference - $391533.50

Mr. Donovan recommends to get rid of the $1.75 rate and provide the proposed
commercial rate with one master meter.

Mr. Shinn would like to make sure in the future if the Villa’s ever change over to
apartments, the availability to meter each individual residence can be done and the
language is included.

Mr. Schnader asked the questions, what is in the future the location goes to apartments
and there is not enough edu’s available? Mr. Donovan advised that would be a problem.
The other question was,how does MTA track the usage? Mr. Donovan advised when
the Villa converts anything over, MTA will be about to see that on the usage report for
commercial properties.

A motion was made to use the proposed commercial rate as long as the Villa’s
are aware in the future, MTA must be able to install individual meters if needed. Also,
the Board wants Mr. Hobaugh to amend the sewer and water rate resolution. All
members present voted “Aye.” Motion carried.

Crossing at Maidencreek – Mrs. Jess Lichman, of SDE advised the Board that she
has a review letter for the Crossings, all concerns were addressed and SDE is satisfied.
The project is being phased into three phases,however Phase 1 must be absolutely
complete before Phase two can start and the same for Phase three.

Page 2

MAIDENCREEK TOWNSHIP AUTHORITY
April 14, 2010

MEETING MINUTES

Mr. Sietz has explained they will follow the guidelines and Mr. Corrado has a letter of
credit for the project.

A motion was made by Earl Rothermel, seconded by Ken Schnader to move
forward on the project. All members present voted “Aye.” Motion carried.

Mr. Hobaugh advised a resolution granting conditional approval to Corrado
Development for a water main extension and a low pressure sanitary sewer main
extension.

A motion was made by Earl Rothermel, seconded by Ken Schnader to approve
the Resolution No. 01-04-2010. All members present voted “Aye.” Motion carried.

James Hardie Plans – Mrs. Lichman advised the Board, SDE reviewed James Hardie
Plans and only had two comments. One being all water lines and sanitary sewer
construction, relocation and or crossings shall be done in accordance with MTA’s rules,
regulations and specifications.

The other being, MTA requires inspections on all water lines and sanitary sewer
construction, relocation and or crossings, therefore a minimum of three days notification
shall be given to MTA. All engineering issues have been addressed and SDE is
recommending approval of the plans.

Mr. Hobaugh advised the Board he has deeds of easement and a bill of sale from
James Hardie to be signed.

A motion was made by Earl Rothermel, seconded by Ken Schnader to approve
the plans. All members present voted “Aye.” Motion carried.

Can Corporation Warehouse Expansion – Mr. Donovan advised the Board a letter
was written to the Maidencreek Township advising them MTA does not want to review
Can Corporation’s plans. Mr. Donovan recommended the Board sign the plans.

A motion was made by Ken Schnader, seconded by Earl Rothermel to sign the
plans. All member present voted “Aye.” Motion carried.

Excelsior Industrial Park Dedication – Mr. Donovan advised the Board the meeting
with Dr. Hanna and several of the Board members went well. An agreement was
reached between both parties that Giorgio will dedicate everything in the industrial park
to MTA. New lines will be installed per DEP regulations near Ina Avenue.

Mr. Hobaugh advised he has done the title search and found MTA to own more than
they think. He is still in the process of this search.

DEVELOPMENT CLOSE OUT STATUS

Page 3

MAIDENCREEK TOWNSHIP AUTHORITY
April 14, 2010

MEETING MINUTES

Lords and Ladies- Mr. Donovan advised the Board the project is 100% complete.

A motion was made by Donald Keim, seconded by Ken Schnader to release the
escrow funds. All members present voted “Aye.” Motion carried.

APPROVAL OF MINUTES

A motion was made by Ken Schnader, seconded by Earl Rothermel to approve
the March 10, 2010 minutes of the Maidencreek Township Authority meeting as
presented. Hearing no public comment, all members present voted “Aye.” Motion
carried.

NEW BUSINESS

1. Shut Off List –

A motion was made by Ken Schnader, seconded by Earl Rothermel to
Approve the April shut-off list. All members present voted “Aye.” Motion carried.

2. Eye and Dental – Mr. Donovan advised the Board, the auditor wants to keep
everything on the books. MTA has an accounting system to help do this. The eye
and dental are currently January to December, but to be consistent with the
auditor, it would make sense to make eye and dental October thru September.

A motion was made by Ken Schnader, seconded by Donald Keim to
change the reimbursements of eye and dental to an Oct 1 fiscal year. All
members present voted “Aye.” Motion carried.

3. Well 2 Change Order – Mr. Donovan met with Mr. Unger and the contractors
doing the Scada project. Mr. Unger advised it would make more sense to install a
new electrical system prior to installing the Scada system. A change order was
put in place by Mr. Unger.

Mr. Rothermel questioned if this should be put out to bid. Mr. Donovan advised it
did not need to because it did not exceed the price of the change order.

A motion was made by Ken Schnader, seconded by Pat Hecker to
allocate the change order. All members present voted “Aye.” Motion
carried.

A motion was made by Earl Rothermel, seconded by Ken Schnader to not
bid electrical system out due to recommendation from the engineer. All
members present voted “Aye.” Motion carried.

Unfinished Business

Page 4

MAIDENCREEK TOWNSHIP AUTHORITY
April 14, 2010

MEETING MINUTES

OTMA response to commercial metering – Mr. Donovan advised the Board OTMA
does not want to meter their commercial users. MTA did not know these commercial
users were even hooked up. It is important to know what our commercial customers are
using and OTMA needs to abide by MTA’s rules and regulations.

Mr. Shinn advised Mr. Hobaugh to send a letter to OTMA to abide by MTA’s regulations
and if not, there will be action taken by OTMA.

LEAK REDUCTION

None

SOLICITOR’S REPORT

Mr. Hobaugh submitted a written report.

.ENGINEER’S REPORT

Mr. Unger submitted a written report.

Mrs. Lichman has an application for payment in the amount of $66,877.14.This amount
is for equipment that is on site. SDE recommends 1st payment be approved.

A motion was made by Donald Keim, Earl Rothermel to pay the 1st installment of
$66,877.14. All members present voted “Aye.” Motion carried.

MANAGER’S REPORT

Mr. Donovan submitted a written report.

PAYMENT OF BILLS

A motion was made by Earl Rothermel, seconded by Donald Keim to pay all the
bills at once and to pay the bills and to approve inter-account transfers, the payment of
the March 2010 after meeting checks and the April 2010 Bill List in the amount of
$158,476.72, the additional April 2010 Bill List submitted at the April 14, 2010 meeting
in the amount of $5,919.93, to approve the payment of the following from the Review
Fee Accounts or billed directly to the Developer: the engineer’s reimbursable expenses
of $766.78, the solicitor’s reimbursable expenses of $None. All members present voted,
“Aye.” Motion carried.

Executive Session

ADJOURNMENT

Minutes are subject to change prior to the approval of the Maidencreek Township

Page 5

MAIDENCREEK TOWNSHIP AUTHORITY
April 14, 2010

MEETING MINUTES

Authority.
Tammy L Deysher, Assistant Office Administrator – April 14, 2010

CC: Authority Board Board of Supervisors

Patrick Donovan Planning Commission
SDE Inc. Roland & Schlegel
Stevens & Lee Maidencreek Township
Kosmerl & Co Ontelaunee Township
JoAnn Schaeffer Plant Operators

Page 6

Archived from the Maidencreek Township website. Reproduced unaltered; not an official records repository.