MAIDENCREEK TOWNSHIP
PARK AND RECREATION BOARD MEETING

Regular Meeting February 3, 2011

Attending: Hether Quillman; David Anspach; Robert Ramsey; Brian Felker;
Diane Hollenbach- Township Manager; Tom Unger- Township Engineer, SDE;
Bridgit Murphy- SDE; Kim Rossetti- Recording Secretary

Hether Quillman called the Regular meeting to order at 7:00 PM.

APPROVAL OF PRIOR MEETING MINUTES:
Robert Ramsey made a motion to approve the minutes of the January 6, 2011 Re-organization
and Regular meeting, seconded by David Anspach. Hearing no questions, all voted in favor;
the motion passed.

MANAGER/TREASURER’S REPORT:
The Board reviewed the Manager/Treasurer's report. Diane Hollenbach advised the Board
that a deposit of $678 was made at the end of January representing a late tax payment. She
also recently received a check for $3,000 from the PA Fish and Boat Commission. The check
represented reimbursement for supplies purchased for the Willow Creek Stream Improvement
Project.

Motion:
David Anspach made a motion to approve the Manager/Treasurer's report,
seconded by Robert Ramsey. Hearing no questions, all voted in favor; the
motion passed.

ENGINEER’S REPORT:
Tom Unger, Township Engineer and Brigit Murphy, of SDE, presented the Board with
drawings and estimates for the Community Park Restroom project. Mr. Unger confirmed that
this project will need a grinder pump installed.

Currently, the only Costars vendor is Romtec and the Board has previously chosen and
recommended the Sierra III model. Mr. Unger and Ms. Murphy advised the Board that the
Romtec option would be the most expensive. The product is considered a pre-fabricated
building, however, it is delivered as a building-kit package and would have to be unpacked,
assembled on-site and connected to the utilities. The Romtec estimate adds an additional
$123,995.00 if their employees unload and assemble the structure; it would cost about
$27,000 to install the grinder pump and connect the building to the utilities. The estimated
total cost would be $261,667.62. Mr. Unger stated a cheaper option would be to hire a
general contractor to construct the kit, install the pump, and perform the utility connection
with an estimated cost of $216,420.62

Ms. Murphy then provided the Board with a cost estimate from Modern Precast Concrete, Inc.
This product is also a pre-fabricated building but is not a kit; it could be delivered in two
pieces. The MPC, Inc. representative is willing to customize their models to fit the desired
24'x24' structure specifications. The structure would be as vandal-proof as possible and has a
few external mold options (split rock, brick face, and wood grain); the brick face and wood
grain options being the easiest to clean. The cost estimate of the structure, foundation, grinder
pump installation and utility hook-up would be $173,317.50.

2

The vendor is not Costars approved but is willing to go through the application process for
this project. Mr. Unger advised the Board that Costars pricing is not always the cheapest
alternative, but it does allow a project to proceed without having to get bids. He also noted
that Costars prices could be negotiated.

Mr. Unger recommended proceeding on both fronts to obtain the best pricing. He stated that
he could prepare the bid specifications and then compare any bids to Costars quotes. Mr.
Unger stated that once the Supervisors approve the recommendation, he could have the bid
specifications ready quickly. The Board discussed having the bids opened at the Park and
Recreation meeting in April and then making a final recommendation for the Board of
Supervisors meeting the following week.

Motion:
David Anspach made a motion to withdraw the previous motion concerning the
Sierra III Romtec structure and recommends the Board of Supervisors authorize
SDE to prepare a bid package as well as review and negotiate pre-fabricated
restroom facilities through Costars, seconded by Robert Ramsey. Hearing no
questions, all voted in favor; the motion passed.

PUBLIC COMMENTS:
None.

OLD BUSINESS:
Community Day
The Board discussed canceling the 2011 Community Day event. The Board was concerned
with running the event at the same time as the bathroom construction project occurring in the
same location. The Board discussed other alternatives for entertainment, including a music
event in the park. The Board will discuss this further at the March meeting.

Willow Creek Habitat Restoration Project
The Board reviewed the brochure and was pleased with the information. Mrs. Hollenbach
stated that John Buzzar, of PA Fish and Boat, is ready to begin and he is looking into applying
for another grant.

T-Ball
Brian Felker advised the Board that the registration forms are copied and ready to go out to
the schools. He stated the registration forms already note photo day as June 4th. The Board
discussed some alternatives for the families, since Community Days will not be held at this
time. The discussion will continue at the March meeting.

Rain Garden
The Board reviewed a message from Elaine Bartholomew of the Maidencreek Watershed
Association. She is looking to schedule a rain garden workshop in the spring to inform the
residents about the benefits of rain gardens. The Board supports the workshops but the
workshop held in the fall only had one resident attend. The Board discussed the request and
felt Mrs. Bartholomew would have a better turn out if she collaborated with Esbanshades.

3

Mrs. Hollenbach also suggested having the workshop in the community room at the new
assisted living facility, when it opens in June. Mrs. Hollenbach will contact both locations to
see if they are interested.

NEW BUSINESS:
Blandon Fire Company Bathroom Water Leak
Mrs. Hollenbach advised the Board that there is a leak somewhere between the Blandon Fire
Company bathrooms and the playground bathrooms. The weather and ground conditions
have hampered the repairs. The line could not be shut off at the water main because it also
would shut off the water to the Fire Company bathrooms. The Board discussed the issue and
would like a water shut off and gauge installed immediately after the Fire Company bathroom
line.

Earth Day Stream Clean-up Event
The Board agreed this would be a good idea for a Boy Scout or Eagle Scout community
service project.

ADJOURNMENT
Having no further business, Robert Ramsey made a motion to adjourn the meeting, seconded
by David Anspach. Hearing no questions, all voted in favor; the motion passed.

The meeting adjourned at 8:15 PM.
The next meeting will be on Thursday, March 3, 2011, 7:00pm.

Respectfully Submitted,

Kimberly Rossetti
Recording Secretary

Diane E. Hollenbach Patrick Donovan, Maidencreek Township Authority General Manager
Township Manager/Secretary JoAnn Schaeffer, Maidencreek Township Authority Secretary
Robert Hobaugh Jr., Esq., Stevens & Lee, MTA Solicitor
cc: Park & Recreation Board Greg Unger, Systems Design Engineering, Inc., MTA Engineer
Board of Supervisors Barbara Hassler, Tax Collector
Mark Kitzmiller, Systems Design Engineering, Inc. Daniel Miller, Blandon Fire Company Chief
Planning Commission Chief Scott W. Eaken, Northern Berks Regional Police
Eugene Orlando, Esq., Orlando Law Firm, Solicitor Thomas Unger, Systems Design Engineering, Inc.
Diane Hollenbach, Township Manager