MAIDENCREEK TOWNSHIP
PARK AND RECREATION BOARD MEETING

Regular Meeting April 7, 2011

Attending: Hether Quillman; Robert Ramsey; Brian Felker;
Diane Hollenbach- Township Manager; Tom Unger- Township Engineer, SDE;
Bridgit Murphy- SDE; Kim Rossetti- Recording Secretary

Hether Quillman called the regular meeting to order at 7:00 PM.

APPROVAL OF PRIOR MEETING MINUTES:
Robert Ramsey made a motion to approve the minutes of the March 3, 2011 regular meeting,
seconded by Brian Felker. Hearing no questions, all voted in favor; the motion passed.

MANAGER/TREASURER’S REPORT:
The Board reviewed the Manager/Treasurer's Report. Diane Hollenbach advised the Board
that the tax money is slowly coming in and the bulk of it should be in by the end of April.
The Road Crew finished installing the signs at both Cornerstone and Faith Drive locations.
Robert Ramsey asked that the post bases be capped, for a more finished look. The Road Crew
also cleaned the graffiti from the picnic tables, installed the hockey nets and bike rack, and
assembled the soccer goals for Ontelaunee Heights and Cornerstone Drive.

Motion:
Robert Ramsey made a motion to approve the Manager/Treasurer's Report, seconded
by Brian Felker. Hearing no questions, all voted in favor; the motion passed.

ENGINEER’S REPORT:
Community Park Bathroom Project
Bridgit Murphy, SDE, presented the Board with a materials estimate for the project. The
structure will have James Hardie cement siding on the outside and NuFiber laminated OSB
for the interior. It will be insulated floor to ceiling, and an upper storage area will be above
the storage/concession area. The bathrooms will be insulated and have a drywall ceiling (for
noise control and lighting). The fixtures will be stainless, the partitions will be powder coated
steel; there will be fire extinguishing trash cans, a stainless steel shelf outside of the
concession/storage window and counter/cabinets within the storage area.

The Board discussed the need for a separate hand washing sink in the storage/concession area
as well as adding a utility sink in the storage area. The Board would like to have the toilets
use manual flush valves and the sinks use push-on, metered faucets to prevent the water from
continually running, if left on. The Board would also like to have foldable wall-mounted
changing facilities (e.g. Koala Care) for each restroom. The Board asked Mr. Unger to look
into installing an energy efficient, instant water heater, to heat water, as needed.

Mr. Unger confirmed that the materials estimate did not include the electrical or plumbing
costs. He recommended bidding the electrical costs, but stated that since the costs should be
under $10,000, only three quotes will be needed.

2

Mr. Unger also stated that because the Road Crew, and he suggested some volunteers with
construction experience, will be doing much of the construction, he believed the materials
may be able to be purchased on State Contract, rather than bid out. Mrs. Hollenbach will
check with the Township Solicitor to confirm this.

Motion:
Robert Ramsey made a motion to recommend the Board of Supervisors approve the
Community Park Restroom Project, as designed by SDE, with a materials cost estimate of
$85,000 for the structure, the Road Crew to perform most of the construction, plus
electrical installation and materials, not to exceed $10,000 and plumbing costs, as needed,
seconded by Brian Felker. Hearing no questions, all voted in favor; the motion passed.

Porta-Potty & Dumpster Area- Community Park
Tabled

PUBLIC COMMENTS:
None.

OLD BUSINESS:
Park and Recreation Workshop
All Park and Recreation Board members will attend an educational workshop at Albright
College on Thursday, April 28, 2011. The topic is “Maintaining Quality Services Through
Communities Working Together”.

Open Space Management Plan
The Board reviewed the Maidencreek Township Willow Creek Project Management Plan,
2011, prepared by Larry Lloyd and Diane Hollenbach. Mr. Lloyd recommended and
submitted a sample of a Natural Area/Garden Resolution to go along with the Open Space
program. He also recommended the Board include a project list with estimated costs. The
Board will include this information within the Park and Recreation 5-Year plan.

Motion:
Kim Rossetti made a motion to recommend the Board of Supervisors consider adopting a
Natural Area/Garden Resolution, as recommended by Larry Lloyd, seconded by Brian
Felker. Hearing no questions, all voted in favor; the motion passed.

Mrs. Hollenbach advised the Board that some individuals were seen fishing from the
Schaeffer Bridge. The Board agreed this was dangerous.

Motion:
Robert Ramsey made a motion to install a “No Fishing From Bridge” sign on the
Schaeffer Road Bridge, seconded by Brian Felker. Hearing no questions, all voted in
favor; the motion passed.

T-Ball
Brian Felker advised the Board that 195 children registered for the program this year. The
league picture day and picnic will be on June 4th from 12:00pm - 2pm with everyone to show

3
at 11:45 for the photo. Brian Felker presented the Board with an estimate from Kathryn’s
Katering for a catered picnic. Coaches and players will be free and all others have the option
to purchase a meal for $2. Parents will be asked to donate desserts in a disposable container.
A friendly T-ball Coach vs. Coach-Pitch Coach game will be planned for entertainment.

NEW BUSINESS:
YMCA Summer Playground Contract
The Board was advised of concerns regarding the Tri-Valley YMCA program literature and
using tax money for the programs. The debate about using tax dollars for the summer
playground program was discussed for the last few years. The Tri-Valley YMCA has asked
the Township for $6,000 to run the Tri-Valley YMCA run 2011 summer playground program
at the Township maintained, Blandon Fire Company playground. In addition to the Township
funds, the YMCA charges $40 per child for the 8-week program. Based on past YMCA
playground summary reports, the Board estimated 80-125 children registered for the
playground the past few years. The Board had a lengthy discussion regarding continuing to
fund the program or whether such programs should be self-funded. The Board agreed to
recommend the program not be funded for 2011, but allow the Tri-Valley YMCA to use the
facilities free of charge.

Motion:
Robert Ramsey made a motion to recommend the Board of Supervisors not fund the Tri-
Valley YMCA 2011 Summer Playground program, but allow the Tri-Valley YMCA to
use the Blandon Fire Company facilities, seconded by Brian Felker. Hearing no
questions, all voted in favor; the motion passed.

ADJOURNMENT
Having no further business, Brian Felker made a motion to adjourn the meeting, seconded by
Hether Quillman. Hearing no questions, all voted in favor; the motion passed.

The meeting adjourned at 8:40 PM.
The next meeting will be on Thursday, May 5, 2011, 7:00pm.

Respectfully Submitted,

Kimberly Rossetti
Recording Secretary

Diane E. Hollenbach Patrick Donovan, Maidencreek Township Authority General Manager
Township Manager/Secretary JoAnn Schaeffer, Maidencreek Township Authority Secretary
Robert Hobaugh Jr., Esq., Stevens & Lee, MTA Solicitor
cc: Park & Recreation Board Greg Unger, Systems Design Engineering, Inc., MTA Engineer
Board of Supervisors Barbara Hassler, Tax Collector
Mark Kitzmiller, Systems Design Engineering, Inc. Daniel Miller, Blandon Fire Company Chief
Planning Commission Chief Scott W. Eaken, Northern Berks Regional Police
Eugene Orlando, Esq., Orlando Law Firm, Solicitor Thomas Unger, Systems Design Engineering, Inc.
Diane Hollenbach, Township Manager
Zoning Hearing Board
Paul Herbein, Zoning Hearing Board Solicitor