Park & Recreation Board

Minutes — October 6, 2011

Date
October 6, 2011
Type
Minutes
Year
2011
File
PDF · 68 KB

Download original Open in browser

Document text

Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 810 words

MAIDENCREEK TOWNSHIP
PARK AND RECREATION BOARD MEETING

Regular Meeting October 6, 2011

Attending: Hether Quillman, David Anspach, Robert Ramsey; Brian Felker;
Kim Rossetti- Recording Secretary; Matt Davenport- Watkins Architect

Hether Quillman called the Regular meeting to order at 7:05 PM.

APPROVAL OF PRIOR MEETING MINUTES:
David Anspach made a motion to approve the minutes of the September 1, 2011 Regular meeting,
seconded by Hether Quillman. Hearing no questions, the motion passed unanimously.

MANAGER/TREASURER’S REPORT:
The Board reviewed the Manager/Treasurer's report. Hether Quillman noted that the trees are scheduled
to be planted in the Willow Creek open space on Saturday, October 15th with a rain date of Saturday,
October 22nd.

Motion:
Kim Rossetti made a motion to approve the Manager/Treasurer's report, seconded by David
Anspach. Hearing no questions, the motion passed unanimously.

PUBLIC COMMENTS:
None.

ENGINEER’S REPORT:
Community Park Bathroom Project
The Board reviewed the September 21st bid results. The Board had a lengthy discussion regarding the
advantages and disadvantages of each Add Alternate and decided on which ones to recommend to the
Board of Supervisors.

Add Alternate #1- Stainless Steel Vandal Resistant Plumbing Fixtures
The Board discussed the history of vandalism and recalled that only one porcelain toilet has been
replaced at the Blandon Fire Company Tot Lot bathroom in the past 10 years. The statement, “You can
buy a lot of porcelain fixtures for $5,000” was made and the Board agreed. The Board agreed that while
the upgraded stainless fixtures would be the most vandal-proof option, the significant cost increase and
special stainless cleaning requirements did not warrant the expense.

Add Alternate #2- Vandal Resistant Drinking Fountain
The Board felt that since most of the Township’s existing drinking fountains have been vandalized in
the past, a few hundred dollars was worth spending to make it vandal resistant.

Add Alternate #3- Skylights
The Board sees value in having natural light in the building, but notes that having skylights prevents the
use of any loft storage space in the future. Matt Davenport confirmed that three skylights are included
in the plans, one for each restroom and one for the storage/concession area. He stated that if one or
more skylights were not wanted, a change/reduction could be requested. The Board agreed that a
skylight in each bathroom would be appropriate, but not have one in the concession/storage area to be
able to utilize loft storage in the future.

2

Add Alternate #4 Exterior Walls (split block)
Mr. Davenport confirmed that the base bid included a smooth, painted, concrete block with an anti-
graffiti coating. The Board felt the most important exterior feature was to have an anti-graffiti coating;
since the base bid included this feature the split-block was not necessary.

Add Alternate #5 & 6 - Simplex vs. Duplex Sewage Pump Station
Mr. Davenport explained the difference between the Simplex and Duplex Pump Stations. With the
simplex pump, in the event of a breakdown the bathrooms will have to be closed down until the unit is
repaired. The duplex pumps will cycle between one another and one will serve as a backup should the
other breakdown. The board felt that the duplex pump was the more appropriate choice since the units
would cycle between one another.

Motion:
Robert Ramsey made a motion to recommend the Board of Supervisors approve and accept the
General Construction Base Bid, Add Alternate #2 (Vandal Resistant Drinking Fountains), Add
Alternate #3 (Skylights) with a change/reduction request for one skylight, and Add Alternate #6
(Duplex Sewage Pump Station) for the Community Park Restroom Project and award the
construction contract to the lowest bidder, seconded by David Anspach. Hearing no questions,
the motion passed unanimously.

Matt Davenport stated that Mr. Bainbridge, of SDE, has reviewed and approved the plans. The building
permits are ready to be issued.

OLD BUSINESS:
None

NEW BUSINESS:
Community Days 2012
The Board would prefer to have a local organization take over the event and is willing to mentor the
group for a year or two. The Board will re-visit this discussion in January 2012.

ADJOURNMENT
Having no further business, David Anspach made a motion to adjourn the meeting, seconded by Robert
Ramsey. Hearing no questions, the motion passed unanimously.

The meeting adjourned at 7:55 PM.

The next meeting will be Thursday, November 3, 2011, 7:00pm.

Respectfully Submitted,

Kimberly Rossetti Diane E. Hollenbach
Recording Secretary Township Manager/Secretary

cc: Park & Recreation Board Patrick Donovan, Maidencreek Township Authority General Manager
JoAnn Schaeffer, Maidencreek Township Authority Secretary
Board of Supervisors Robert Hobaugh Jr., Esq., Stevens & Lee, MTA Solicitor
Greg Unger, Systems Design Engineering, Inc., MTA Engineer
John Watkins, Watkins Architect Barbara Hassler, Tax Collector
Daniel Miller, Blandon Fire Company Chief
Planning Commission Chief Scott W. Eaken, Northern Berks Regional Police
Thomas Unger, Systems Design Engineering, Inc.
Eugene Orlando, Esq., Orlando Law Firm, Solicitor

Diane Hollenbach, Township Manager

Zoning Hearing Board

Paul Herbein, Zoning Hearing Board Solicitor

Archived from the Maidencreek Township website. Reproduced unaltered; not an official records repository.