Planning Commission

Minutes — September 5, 2012

Date
September 5, 2012
Type
Minutes
Year
2012
File
PDF · 760 KB

Download original Open in browser

Document text

Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 1,398 words

Maidencreek Township Planning Commission
September 5, 2012 7:00 pm

Present: James Schoellkopf, Jr., David Anspach, Joel High, Matt Davenport, Zack Moore,
Eugene Orlando- Orlando Law Office, Tom Unger- Systems Design Engineering, Inc., Diane
Hollenbach - Township Manager

Guests: Kathleen Thompson,

James Schoellkopf called the September 5, 2012 regular meeting of the Maidencreek Township
Planning Commission to order at 7:00 p.m. in the Maidencreek Township Municipal Building
and asked everyone to rise for the Pledge to the Flag.

Approval of Meeting Minutes
A motion was made by Zack Moore, seconded by Joel High, to waive the reading of the minutes
and approve the minutes of the August 1, 2012 regular meeting as presented. Hearing no
questions on the motion, all members voted, "Aye". Motion carried

Approval of the Agenda
A motion was made by Joel High, seconded by David Anspach, to approve the agenda as
presented. Hearing no questions on the motion, all members voted, "Aye". Motion carried.

Acceptance of Plans - None

Communications

Diane Hollenbach presented for the record the letter received from Kathleen Thompson
regarding the Village at Summit Crest Phase III (attachment).

Public Comment
Ms. Thompson expressed concerns about the Village at Summit Crest proposed water

system, specifically that it has been stated in the past that the water system would be owned by
a different entity and that the developer has offered to drill new wells should his well impact the
neighboring property's wells. Ms. Thompson asked what happens if the entity owning the
water system does not have enough money to make good on this promise and asked if the
Township can require a written document and a bond to protect the residents.

Gene Orlando stated that the Planning Commission cannot regulate ownership structure
but there are remedies that legal counsel can help with against a landowner or water company.
Mr. Orlando did recommend that the Planning Commission look at the concerns raised. Tom
Unger added that the well would be permitted by the PA Department of Environmental
Protection and regulated by the Public Utility Commission. Mr. Unger will look at the water
permit for the owner's name and any conditions that may have been put on it to protect adjacent
wells.

Ms. Thompson stated that she is also concerned with the storm water run off once the
project is started. Her son's property had a lot of flooding from the timbering and they were
unable to buy flood insurance to protect themselves. She asked if the developer's bond would
cover damage off site. Tom Unger stated that the municipal bonds for the improvements did not
cover off site damage. Zack Moore suggested that an attorney should be able to help her and her
son with recourse.

Maidencreek Township Planning Commission
September 5, 2012 7:00 pm

Engineer Agenda
Subdivision Status

Esbenshade Preliminary Plan - A motion was made by David Anspach and seconded by
Joel High, to recommend the Board of Supervisors grant the developer's request for a time
extension to the review period for the Esbenshade Land Development Plan until December 28,
2012. Hearing no questions on the motion, all members voted, "Aye". Motion carried.

Solicitor Report - none

Having no other business, a motion was made by David Anspach, to adjourn the meeting.
Zack Moore seconded the motion. All members voted, "Aye." Motion carried. Meeting
adjourned at 7:27 p.m.

Respectfully Submitted,

Kit OVIV etAcc

Diane E. Hollenbach, secretary

NEXT MEETING: WEDNESDAY, October 3, 2012 @ 7 PM

CC: Board of Supervisors Tom Unger, SDE Barbara Hassler
Planning Commission
Park & Recreation Eugene Orlando, Solicitor Chief Scott Eaken
Authority
Patrick Donovan Dan Miller

Zoning Hearing Board & Alt.

2

Russo Law Offices

633 Belvidere Road
Phillipsburg, NJ 08865

(908)454-0806
Telefax (908)454-5976

Arthur J. Russo, Esquire
Jeffrey M. Russo, Esquire*
Brad M. Russo, Esquire

Admitted in Ai and PA Bats

August 23, 2012

Maidencreek Township Planning Commission
1 Quarry Road
Blandon, Pennsylvania 19510
Attn: Diane Hollenbach, Mgr., Recording Secretary

Re: Kathleen Thompson/Heath Thompson
Village at Summit Crest

Dear Ms. Hollenbach:

Kindly be advised, pursuant to previous correspondences, that this law firm represents Kathleen
and Heath Thompson, residing at 94 Lee Spring Road in regard to the proposed Village at Summit
Crest Development, pending final approval before the Board.

Please be further advised that I am corresponding in order to provide further objection regarding
the grant of final approval for said development. The basis for my objections has been the subject
of previous correspondence relating to proposed detention basins adjacent to Lee Spring Road,
together with additional general issues relating to construction, buildup, traffic, flow of
construction vehicles, obstruction of the soil and of the earth adjacent to the roadway,
diminishment of asthetics regarding this roadway and community, etc.

My objections and concerns now encompass additional issues raised by my clients as adjacent
landowners regarding liability issues. The private water system effecting well supply and further,
protection to my clients and the neighboring residents regarding performance bonds and liability
insurance.

The water system supply to the Village at Summit Creek Development has been changed from a
public water system to a private water system to be owned by the developer. The initial concerns
in review of the Carlisle Gray Associates water testings are with regard to the diminishment of the
water supply for the wells of the adjacent property owners. Ms. Kathleen Thompson had appeared
at the prior meeting and voiced her concerns regarding the diminishment of water supply. The

Maidencreek Township Planning Commission
August 23, 2012
Page 2

owner of the development had specified in response to her concerns, that he would bear the
responsibility of digging a new well for any of the local residents who have experienced
diminishment or depletion of water supply. I would request that in the event of final approval, that
a condition attached to said approval regarding the responsibility of the developer in the event of
diminishment or depletion of water supply to the residents. The Board may additionally consider
coverage of the water supply system in a performance bond.

An additional concern with the private water supply system involves the issue of legal ownership
of the community water system as a separate entity. The Minutes of September 1, 2010 specify
that the owner has represented that a separate entity from the development would be effectuated
"for liability purposes". The representation by the owner encompasses the insulation from
damages to the adjacent property owners and the insulation of the subdivision property assets from
liability in the event of damage to the adjacent owners. I would request that the Board consider a
condition of any approval of the development requiring that the water supply system be included in
the entity encompassing the ownership of the common facilities for the protection of the residents.

It is my understanding from a review of the conditions of the subdivision plan for final approval
that a performance bond has not been required by the owner. I would request that the
Commission, with input from the Township attorney and engineer, require a stringent performance
bond, which encompasses protection to the adjacent property owners involving potential surface
water runoff, the community water system, together with the improvements required for the
development.

In addition, I had previously corresponded regarding damages to my client's property regarding
surface water runoff, with minimal excavation by the owner. In a review of the subdivision data, it
is my understanding that other residents have also been damaged by surface water runoff. The
Commission should be cognizant that the properties affected by the within development do not
qualify for flood insurance and therefore, there is no insurance protection in the event of surface
water runoff damages causing flooding to the properties. I therefore, request that damages for the
surface runoff be evaluated via a performance bond or monetary deposit to be held by the
Township in the event of damage from surface water runoff.

It would be greatly appreciated in the event that the subdivision moves forward to final approval,
that the Commission consider the issues raised in the within correspondence.

Maidencreek Township Planning Commission
August 23, 2012
Page 3

Thank you for your kind attention and cooperation in this matter.

Very tr. yours,

Y M. RUSSO
MR:ks

cc: James Schoellkopf, Jr., Planning Chairman
Matt Davenport, Vice Chairman
Dave Anspach, Board Member
Joel High, Board Member
Zack Moore, Board Member
Thomas Unger; Karen Pollock, SDE, Inc.. Engineering Consultants
Eugene Orlando, Jr., Esq.

Archived from the Maidencreek Township website. Reproduced unaltered; not an official records repository.