Maidencreek Township Planning Commission
Wednesday, August 7, 2013

Attending: Jim Schoellkopf, Jr., Joel High, David Anspach, Zack Moore, Mark Kitzmiller– Systems
Design Engineering, Inc., and Diane Hollenbach – recording secretary

Guests: Michael Hartman

REGULAR MEETING
Jim Schoellkopf, Jr. called the Maidencreek Township Planning Commission Regular Meeting to
order at 7:00 p.m. and asked everyone to rise for the Pledge to the Flag.

APPROVAL OF THE AGENDA
A motion was made by David Anspach to approve the agenda for the Maidencreek Township
Planning Commission Regular Meeting. The motion was seconded by Joel High. Hearing no
questions on the motion, all members voted, “Aye.” Motion carried.

APPROVAL OF PRIOR MEETING MINUTES
A motion was made by Zack Moore to waive the reading of the June 5, 2013 regular meeting
minutes and approve the minutes as presented. Joel High seconded the motion. Hearing no
questions on the motion, all members voted, “Aye.” Motion carried.

COMMUNICATIONS –None

PUBLIC COMMENT – None

ENGINEER'S AGENDA
Custom Milling and Consulting – Mark Kitzmiller of Systems Design Engineering distributed the
August 6, 2013 review letter for the Custom Milling Warehouse Project. The following items were
discussed:

 The plan is marked as final. Preliminary plan approval has not been granted and the plan
should be marked as preliminary/final and the revision train put back on the plan.

 A label is needed on the fencing to distinguish between existing and proposed.
 The Planning Commission agreed that a waiver would be in order for a water resource

study, since the original subdivision water resource study should suffice.
 The Township Sewage Enforcement Officer requires more information on the existing

septic system the applicant plans on hooking into such as documentation on size, historic
flow and type. The PA DEP has specific requirements that the SEO must follow when
granting a permit for reconnection to a system. The Planning Commission suggested that
Mr. Hartman talk to David Tranquillo at Giorgi Mushroom, since he was a former employ at
the facility when it was a mushroom farm if no documentation exists.
 Documentation is needed on the projected flow for the subdivision to make sure it does not
exceed the 1200 gallons per day approved by the PA DEP on the original Planning Module.
 The Erosion and Sedimentation Plan is complete but not yet approved. This should be
made part of the plan set when approved.
 The Penn DOT Highway Occupancy Permit application has not yet been approved. Penn
DOT is requiring that one existing entrance be closed and gated and used only for
emergency access.

1

Maidencreek Township Planning Commission
Wednesday, August 7, 2013

 A waiver is requested on lighting to allow wallpacks in the rear of the facility at a height of
25 feet instead of on poles at 20 feet.

A motion was made by Zack Moore to recommend that the Board of
Supervisors grant a waiver to section 190-31 of the Maidencreek Township Code of
Ordinances and allow lights to be mounted at 25 feet instead of 20 feet. David
Anspach seconded the motion. All members voted, “Aye.” Motion carried.
 A Storm Water Operation and Maintenance Agreement must be executed.
 External site access needs to be clarified with truck turning templates and a circulation
plan. It appears from photos that there are truck overrun areas. There is an abandoned
electric pole in the easement, some of the easement is unpaved and some of it runs across
old parking spaces. The applicant should document the circulation on an easement sheet
as part of the land development plan.
 Internal circulation should be looked at again. The driveway is only 12 feet wide and dead
ends at the emergency access gate. A change needs to be made so that trucks are not forced
to open the gate to turn around or back up the one way driveway.
 The Fire Chief’s comments are outstanding.
 The PA DEP asked for a storm water consistency letter which the Township Engineer
provided. The Township would also like to see the Post Construction Stormwater
Management Plan for the porous paving shown in the land development plan set.
Mr. Hartman agreed to clean up these few outstanding issues and will attend the September
meeting for approval.

SOLICITOR’S COMMENTS – None

OLD BUSINESS - None

NEW BUSINESS - None

Having no other business, a motion was made by David Anspach to adjourn the regular meeting.
Zack Moore seconded the motion. All members voted, “Aye.” Motion carried. Meeting adjourned
at 7:47p.m.

Respectfully Submitted,

Diane E. Hollenbach, secretary Tom Unger, SDE Barbara Hassler
CC: Board of Supervisors
Eugene Orlando, Solicitor Chief Scott Eaken
Planning Commission
Park & Recreation Patrick Donovan Dan Miller
Authority
Zoning Hearing Board & Alt.