Planning Commission

Minutes — March 5, 2014

Date
March 5, 2014
Type
Minutes
Year
2014
File
PDF · 164 KB

Download original Open in browser

Document text

Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 774 words

Maidencreek Township Planning Commission
Wednesday, March 5, 2014

Attending: Jim Schoellkopf, Joel High, David Anspach, Zack Moore, Eugene Orlando, Jr. – Orlando
Law Office, Thomas Unger – Systems Design Engineering and Diane Hollenbach – recording
secretary

Guests: Doug Kramer, Rob Hain, Harold Nolt and Lydia Nolt

Jim Schoellkopf called the Maidencreek Township Planning Commission Regular Meeting to order
at 7:00 p.m. and asked everyone to rise for the Pledge to the Flag.

APPROVAL OF THE AGENDA
A motion was made by Joel High to approve the agenda for the Maidencreek Township Planning
Commission Regular Meeting. The motion was seconded by David Anspach. Hearing no
questions on the motion, all voted in favor and the motion passed unanimously.

APPROVAL OF PRIOR MEETING MINUTES
A motion was made by Dave Anspach to waive the reading of the February 5, 2014 meeting
minutes and approve the minutes as presented. Joel High seconded the motion. Hearing no
questions on the motion, all voted in favor and the motion passed unanimously.

ACCEPTANCE OF PLANS - None

COMMUNICATION
The Commission received invitations to the Berks Municipal Dinner.

PUBLIC COMMENT
Doug Kramer representing Gross Bus, updated the Planning Commission on changes to the
previously discussed sketch plan for a school bus maintenance facility, CDL training center and
office off of West Wesner Road. After soil testing, the plan was reviewed and everything shifted
west. An existing storm water pond was discovered on the site with a pipe and the plan is to
utilize it for storm water. Mr. Kramer has been in contact with UGI and is working toward the
relocation of the gas line to the West Wesner Road right of way and easements. If the bank on
West Wesner can be cut back and the gas line relocated, it would be possible to create a second lot
on the site.

A condition of the variance received for the project is to pave the access road to the Neighbor’s
property line. The profile of the driveway could be changed to meet the ordinances 10% grade
requirement with the relocation of the gas line and removal of fill. The plan is to relocate the
existing gravel Bertolet Place that runs to Mr. Schoellkopf’s land and create a T intersection. The
road easement for West Wesner Road was questioned and Mr. Orlando suggested that Mr. Kramer
research this further. Mrs. Hollenbach confirmed that Bertolet Place is a private lane, not
Township owned and that there is no ordinance vacating West Wesner Road. Mr. Kramer is
waiting on the weather to clear to proceed with the plans and will contact the engineer to meet to
discuss the proposed changes to West Wesner.

1

Maidencreek Township Planning Commission
Wednesday, March 5, 2014

ENGINEER’S AGENDA
Esbenshade Greenhouse Time Extension
A motion was made by Zack Moore to recommend the Board of Supervisors accept the request
from the developer of Esbenshade’s Greenhouse Land Development Plan for a time extension to
the plan review period until June 28, 2014. David Anspach seconded the motion. Hearing no
questions on the motion, all voted in favor and the motion passed unanimously.

Nolt Subdivision – Rob Hain from Berks Surveying reviewed the plan with the Commission. Most
items have been addressed on the February 24, 2014 Systems Design Engineering, Inc. review
letter. The Highway Occupancy Permit has been received from Penn DOT and the driveway
easements are in the process of being recorded. Mr. Unger requested that the HOP permit number
be placed on the plan. Waivers recommended by the Planning Commission are pending before the
Board of Supervisors. Richmond Township Planners agreed to waive the review of the plan and
the Supervisors have yet to take action.

A motion was made by David Anspach to recommend that the Board of Supervisors approve the
Nolt Subdivision Final Plan conditional upon completion of the items in the February 24, 2014
Systems Design Engineering Inc. review letter which is incorporated by reference, and with the
addition of adding the Penn DOT Highway Occupancy Permit numbers on the plan. Zack Moore
seconded the motion. Hearing no questions on the motion, all voted in favor and the motion
passed unanimously.

SOLICITOR’S REPORT – Nothing to report.

Having no other business, a motion was made by David Anspach to adjourn the regular meeting.
Zack Moore seconded the motion. Hearing no questions on the motion, all voted in favor and the
motion passed unanimously. Meeting adjourned at 7:30 p.m.

Respectfully Submitted,

Diane E. Hollenbach, secretary Tom Unger, SDE Barbara Hassler
CC: Board of Supervisors
Eugene Orlando, Solicitor Chief Scott Eaken
Planning Commission
Park & Recreation Patrick Donovan Dan Miller
Authority
Zoning Hearing Board & Alt.

2

Archived from the Maidencreek Township website. Reproduced unaltered; not an official records repository.