Kaplin Stewart
Attorneys at Law
Marc B. Kaplin
Direct Dial: (610) 941-2666
Direct Fax: (610) 684-2000
Email: mkaplin@kaplaw.com
www.kaplaw.com
September 30, 2014
Renee Sigel
Pennsylvania Division Administrator
Federal Highway Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
James D. Ritzman, P.E.
Deputy Secretary for Planning
Pennsylania Department of Transportation
Commonwealth Keystone Building 8th Floor
400 North Street
Harrisburg, PA 17120-0095
RE: Federal Project Number X051302L40E -- SR_73 & Genesis Drive
Dear Ms. Sigel and Mr. Ritzman:
The Pennsylvania Department of Transportation ("PADOT") proposes to construct a corridor
Pennsylvania. The Project involves:
Widening of SR 222 from one traffic lane in each direction to a five-lane cross
section with two lanes in each direction and a center turn lane ("Route 222
Widening")
Improvements to the existing traffic signal at Route 222 and Route 73.
including turn lanes on the intersection approaches ("Route 73 Intersection
Improvements")
The replacement of an existing traffic signal at Route 222 and Tamarack
Drive
Boulevard/Genesis
withadual laneroundabout ("Genesis
Roundabout")
Kaplin Stewart Mcloff Reiter &Stein,PC
Ofices in
Union Meeting Corporate Center
Pennsylvania
9l0 Harvest Drive, P.0.Box 3037
New Jersey
BlueBell,PA19422-0765
610-260-6000 tel

Renee Sigel
James D. Ritzman, P.E.
September 30, 2014
Page 2
The replacement of the unsignalized T intersection of Route 222 and Shaeffer
Road with a new dual lane roundabout ("Shaeffer Roundabout").
The Project is proposed to be 100% funded with federal monies. PADOT has been delegated
("FHWA").
I represent Maidencreek Associates, L.P., the owner of 85 acres of undeveloped land adjacent
to Route 222 and the Proposed Shaeffer Roundabout.  MCA has submitted plans to
Maidencreek Township for the development of a 608,000 square foot shopping center
("Proposed Shopping Center") on its property. The Shaeffer Roundabout interferes with
MCA's ability to proceed with the Proposed Shopping Center.
Since it is being 100% funded by federal monies, the Project is subject to the environmental
procedures mandated under the National Environmental Policy Act ("NEPA"). I am writing
to make you aware that PADOT has failed to comply with its duties under NEPA. and is
executing the Project in an unlawful manner.
Pursuant to 23 C.F.R. $ 771.115, FHWA has established three classes of reviews for
transportation projects completed by the federal government and/or funded by the federal
government --- an EIS, EA, or CE - each requiring different levels of NEPA documentation.
23 C.F.R. $ 771.117(a) of the FHWA's NEPA regulations define categorical exclusions as
follows:
(a) Categorical exclusions (CEs) are actions which meet the
definition contained in 40 CFR 1508.4, and, based on past
experience with similar actions, do not involve significant
environmental impacts. They are actions which: do not induce
significant impacts to planned growth or land use for the area; do
not require the relocation of significant numbers of people; do
not have a significant impact on any natural, cultural,
recreational, historic or other resource; do not involve significant
air, noise, or water quality impacts; do not have significant
impacts on travel patterns; or do not otherwise, either
individually or cumulatively, have any significant environmental
impacts.
Under its delegated authority from the FHWA, PADOT has prepared a Categorical Exclusion
Evaluation for the Project. The Categorical Exclusion Evaluation was submitted by PADOT
of that Categorical Exclusion Evaluation is attached hereto as Exhibit “A"
As set forth below, we do not believe that the Project qualifies for a Categorical Exclusion.

Renee Sigel
James D. Ritzman, P.E.
September 30, 2014
Page 3
23 C.F.R. $ 771.117(c) of the FHWA regulations list twenty-three actions that meet the criteria
for a categorical exclusion and generally do not require further NEPA documentation. The
Project does not fall within the criteria for any of the categorical exclusions established by 23
C.F.R. $ 771.117(c).
23 C.F.R. $ 771.117(d) enumerates additional actions which meet the criteria for a Categorical
Exclusion only after the FHWA approval. The Project does not fall within the criteria for any
of the additional categorical exclusions established by 23 C.F.R. $ 771.117(c).
PADOT's Categorical Exclusion Evaluation states that the purpose and need of the Project is
"to reduce congestion and improve safety while accommodating pedestrians and non-
motorized vehicles including horse and buggies and bicycles". The Categorical Exclusion
Evaluation is a form which contains a series of statements which are required to be answered.
including the following:
There is no substantial controversy associated with the traffic control measures
(answered true)
Will the project induce impacts (positive and negative) on planned growth, land
use, or development patterns for the area?
(answered no)
Is the project consistent with planned growth?
(answered yes)
Will the project induce impacts to economic activity, including employment gains
and losses?
(answered no)
The statements made by PADOT in response to these questions were fundamentally false.
There is a substantial controversy associated with the traffic control measures
Two aspects of the Project have been the subject of much controversy: (1) the proposed
Genesis Roundabout; and (2) the proposed Shaeffer Roundabout. This controversy is long
standing and well documented through:

Renee Sigel
James D. Ritzman, P.E.
September 30, 2014
Page 4
Maidencreek Township's website devoted to its opposition to the roundabouts.
http://maidencreek.net/Roundabouts.html
Maidencreek. https J/www.facebook.com/MaidencreekRoundabout
An on-line Petition to PADOT, Berks County Commissioners, PA State House
Representatives to Stop construction of the Maidencreek Township roundabout
signedby250people.
www.change.org/...pa-state-house...the-maideancreek-township.
Maidencreek Township Resolution 32-2012 adopted October 11, 2012
expressing its opposition to the proposed roundabouts.  A copy of the
Resolution is attached hereto as Exhibit "B".
Fleetwood Area School District's Resolution expressing its opposition to the
proposed roundabouts. A copy of the Resolution is attached hereto as Exhibit
"C"
Various letters from MCA to PADOT expressing its opposition to the proposed
Shaeffer Roundabout. Copies of those letters are collectively attached hereto as
Exhibit "D"
Various newspaper articles documenting the opposition to the proposed
roundabouts. Copies of those newspaper articles are collectively attached
hereto as Exhibit “E".
Objections to the proposed roundabouts have also been voiced at several public
meetings with representatives of PADOT and are reflected in minutes of those
meetings. Copies of those minutes are attached hereto as Exhibit "F".
Therefore, PADOT's statement in the Categorical Exclusion Evaluation that there is no
substantial controversy associated with the traffic control measures is patently false and the
falsity of such statement was well known to PADOT.
The Project will induce negative impacts on planned growth, land use, or development
patterns for the area and is not consistent with planned growth
As clearly stated in Maidencreek Township Resolution 32-2012, the Township believes that
the proposed roundabouts will have significant negative impacts on planned growth, land use
and development patters within the Township. The Township Resolution states that:

Renee Sigel
James D. Ritzman, P.E.
September 30, 2014
Page 5
The proposed roundabouts will severely impede commercial development of
the Route 222 Corridor in Maidencreek Township, which corridor is planned as
the single largest area of future regional commercial growth in Maidencreek
Township
Existing businesses will suffer from restricted ingress and egress and thereby
impair their ongoing viability;
The proposed roundabouts will compromise the safety of motorists, bicycles,
horse and buggies and pedestrians
The proposed roundabouts will deprive the Township of the needed revenues.
employment and provision of goods associated with commercial development.
The Proposed Shopping Center is an integral part of the Township's planned growth and
creation of employment and tax revenues. Not only will the proposed Shaeffer Roundabout
interfere with the development of the Proposed Shopping Center by requiring the
condemnation of a portion of the MCA's land, the proposed Shaeffer Roundabout cannot
adequately accommodate the amount of traffic that will be generated by the Proposed
Shopping Center. Based on ITE trip generation projections prepared by MCA's traffic
engineer, McMahon Associates ("McM"), the Proposed Shopping Center will generate 649
vehicular trips in the AM peak hour and 2,035 vehicular trips in the PM peak hour. A copy of
MCA's trip generation analysis is attached as Exhibit "G".
On October 17, 2013, MCA submitted a preliminary traffic analysis to PADOT with its
Highway Occupancy Permit Scoping Meeting Application. By email dated December 30,
proposed Shaeffer Roundabout cannot adequately accommodate the traffic from the Proposed
Shopping Center. Specifically, Mr. Boyer stated that:
The Department has concerns based on the scoping application
submitted that the size of the development and the projected
traffic volumes will cause traffic congestion and failing levels of
service at the site access driveways on U.S. Route 222. These
concerns will be discussed at the Scoping Meeting to ensure that
the applicant is aware at this early stage in the process that a
highway occupancy permit may not meet the requirements of
Chapter 441 of the Pa. Code given the size and scope of the
deveiopment.

Renee Sigel
James D. Ritzman, P.E.
September 30, 2014
Page 6
Therefore, it cannot be disputed that the proposed Shaeffer Roundabout will induce negative
impacts on planned growth, land use, and development patterns within the Township and is
inconsistent with the Township's planned growth.
PADOT has not analyzed the impact of the Project on the future regional commercial growth
envisioned and desired by Maidencreek Township. As evidenced by the limited traffic
analysis PADOT has performed to date, PADOT did not take into account the Proposed
Shopping Center or any other future commercial developments in determining whether the
roundabouts would function acceptably. Rather, PADOT simply added a 1% annual
background growth rate to its existing trip counts.. Therefore, PADOT entirely failed to
consider whether the Project wili induce negative impacts on planned growth, land use, and
development patterns within the Township. A copy of PADOT's traffic analysis is attached as
Exhibit "H".
The Proiect will induce impacts to economic activity, including employment gains and
losses
As stated above, the Route 222 Corridor in Maidencreek Township is planned as the single
largest area of future regional commercial growth in Maidencreek Township. The Township's
Resolution states that commercial growth of the Route 222 Corridor is vital to the economic
well being of the residents and property owners of the Township in the form of ermployment,
providing of goods and services and benefits the Township, the School District and the County
by providing revenues through a stronger tax base and has a much lower ratio for the cost of
providing services than a residential development.
If the Proposed Shopping Center and other anticipated commercial development along the
Route 222 Corridor is unable to occur because of the Project, the Project will have a
significant detrimental impact upon economic activity and the creation of jobs within the
Township and the region.
Under the Administrative Procedure Act, a reviewing court shall "hold unlawful and set aside
agency action, findings, and conclusions found to be . : . arbitrary, capricious, an abuse of
discretion, or otherwise not in accordance with law." 5 U.S.C. $ 706(2)(A). Agency action
may be set aside if the agency "relied on factors which Congress has not intended it to
consider, entirely failed to consider an important aspect of the problem, offered an
explanation for its decision that runs counter to the evidence before the agency, or is so
implausible that it could not be ascribed to a difference in view or the product of agency
expertise." Motor Vehicle Mfrs. Assn. of United States, Inc. v. State Farm Mutual Automobile
Insurance Co., 463 U.S. 29, 43; see also Sierra Club v. U.S. Army Corps of Engineers, 295
F.3d 1209, 1216 (11th Cir. 2002).

Renee Sigel
James D. Ritzman, P.E.
September 30, 2014
Page 7
PADOT's issuance of a Categorical Exclusion for the Project, rather than proceeding through
the required NEPA process to evaluate the impacts of the Project was arbitrary, capricious and
an abuse of PADOT's delegated authority by the FHWA. Unless PADOT revokes its
Categorical Exclusion and proceeds with the full environmental analysis required under
NEPA, we will have no choice but to proceed to Court to revoke the Categorical Exclusion
and enjoin the further execution of the Project.
I sincerely hope that we will not have to resort to litigation to protect the NEPA process.
However, all of our efforts to discuss these issues with PADOT representatives have been
refused. PADOT was unwilling to provide us with any of their studies and analyses
concerning the Shaeffer Roundabout and we were forced to file a Right to Know Law request
in order to obtain the documents. PADOT has refused to consider alternatives to the Shaeffer
Roundabout which would permit the construction of the Proposed Shopping Center. MCA's
inability to construct the Proposed Shopping Center will have serious detrimental effects upon
the Township and the School District's long-term tax ratables as well as employment within
the region.
Sinderaly,
M&rc B.Kaplin
Enclosures
Cc w/enclosures:
Steven B. Wolfson
William Dion
Joseph Rudderow,Chairman, Maidencreek BOS
Diane Hollenbach, Maidencreek Twp. Manager
Peter W, Miller, Fleetwood School District
Michael Rebert, PADOT District 5-0
Brian Boyer, PADOT District 5-0
Michael Mastaglio, PADOT District 5-0
William Cressler, Esquire, PADOT General Counsel
Charles J. Campbell, PADOT Environmental Quality Assurance Division
Jerry Knowles, State Representative
David Argall, State Senator
Moises Marrero, Assistant Division Administrator FHWA
Roger L. Ryder, Director of Operations FHWA
Keith M. Lynch, Director of Program Development FHW A
Camille Otto, Environmental Program Manager FHWA
Alan Piper, Berks County Planning Commission
Glenn Knoblauch, Berks County Planning Commission