Park & Recreation Board

Minutes — October 8, 2014

Date
October 8, 2014
Type
Minutes
Year
2014
File
PDF · 146 KB

Download original Open in browser

Document text

Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 752 words

MAIDENCREEK TOWNSHIP

PARK AND RECREATION BOARD MEETING

Regular Meeting October 8, 2014

Attending: Hether Quillman, Becky Miller, Keith Shuman, Annette Faust, David Anspach,
Katelyn Fox- Recording Secretary

Guests: Diane Hollenbach, Township Manager

Hether Quillman called the Regular Meeting to order at 7:00PM

APPROVAL OF PRIOR MEETING MINUTES:
David Anspach made a motion to approve the September 4, 2014 Regular Meeting minutes,
seconded by Becky Miller. All present voted in favor; the motion passed.

APPROVAL OF TREASURER’S REPORT AND BILL LIST:
Becky Miller made a motion to approve the Treasurer’s Report and Bill List, seconded by
David Anspach. All present voted in favor, the motion passed.

PUBLIC COMMENTS:
None.

ENGINEER’S REPORT
ONTELAUNEE HEIGHTS SINKHOLE REPAIR

Mark Kitzmiller, Engineer from SDE, Inc., presented two options for the Park and
Recreation Board to look over. After much discussion, David Anspach made a motion to
keep the construction fence up and place signs warning about sinkholes and revisit the swale
option in the Spring of 2015, seconded by Keith Shuman. All present voted in favor, the
motion passed.

PARKING LOT LIGHT POLES AT COMMUNITY PARK
Tabled.

BLEACHERS FOR COMMUNITY PARK
Tabled.

The Chairman thanked the Engineer and dismissed him from the meeting.

NEW BUSINESS
2015 BUDGET

Diane Hollenbach, Township Manager, presented the 2015 Park and Recreation budget to
the Board. (Attached) The Park and Recreation Board would like it noted for the record that
although they have apprehension about the Board of Supervisor’s decision to eliminate the
flow of the Park and Recreation tax into the Park and Recreation fund, they are open to
working with the Board of Supervisors for the most successful fiscal situation for the
Township.

TOT LOT REPLACEMENT AT BLANDON FIRE COMPANY
Keith Shuman informed the Board that the Road Crew may have a part to repair the broken
bridge on the play structure. The Board would like to wait to see if the Road Crew is able to

2

repair the play structure before replacing it.

LIGHTS IN PAVILION AT COMMUNITY PARK
The Board would like to receive a quote for two light fixtures installed in the middle of the
pavilion with a switch inside the concession stand. Diane Hollenbach, Township Manager,
has a meeting with Pagoda Electric to discuss the specs of the project. Katelyn Fox will
present the quote at the November meeting.

SAFETY SURFACE REPAIR AT COMMUNITY PARK TOT LOT
Katelyn Fox explained the quotes presented and the Board would like to pursue the “pour in
place” instead of the tiles, as suggested by Boyce 4 Playgrounds. David Anspach made a
motion to replace the safety surface, with a price not to exceed $27, 159.00, seconded by
Becky Miller. All present voted in favor, motion passed.

PURCHASE OF MOWER
Diane Hollenbach presented the machinery repairs made to the diesel mower from 2011 to
2014. After much discussion, David Anspach made a motion to purchase the Lazer Z S-
Series from Reading Tractor and Equipment in the amount of $9,789.50, seconded by
Annette Faust. All present voted in favor, Keith Shuman abstained. Motion passed.

HOT DOG ROLLER (CONCESSION STAND)
Katelyn Fox made the Board aware that the one hot dog roller was not working. Keith
Shuman informed the Board that the Road Crew could take a look into fixing it. Annette
Faust made a motion to purchase a new hot dog roller at a price not to exceed $139.95 if the
Road Crew is unable to fix the roller, seconded by Becky Miller. All present voted in favor.
Motion passed.

DISCUSSION OF JOINT WORK WITH FLEETWOOD BOROUGH PARK AND
RECREATION

Tabled.

OLD BUSINESS
None

COMMENTS FROM THE BOARD

ADJOURNMENT
Having no further business, Becky Miller made a motion to adjourn the meeting, seconded
by Annette Faust. Hearing no questions, all voted in favor. The motion passed.

The meeting adjourned at 9:00PM.
The next regular meeting will be Wednesday, November 12, 2014 at 7PM at the Maidencreek
Township Building.

3
Respectfully Submitted,

Katelyn Fox Diane E. Hollenbach
Recording Secretary Township Manager/Secretary

cc: Park & Recreation Board Patrick Donovan, Maidencreek Township Authority General Manager
JoAnn Schaeffer, Maidencreek Township Authority Secretary
Board of Supervisors Daniel P. Becker, Esq. KozloffStout Attorney’s, MTA Solicitor
Greg Unger, Systems Design Engineering, Inc., MTA Engineer
Tom Unger, Systems Design Engineering, Inc. Barbara Hassler, Tax Collector
Daniel Miller, Blandon Fire Company Chief
Planning Commission Chief Scott W. Eaken, Northern Berks Regional Police
Thomas Unger, Systems Design Engineering, Inc.
Eugene Orlando, Esq., Orlando Law Firm, Solicitor

Diane Hollenbach, Township Manager

Zoning Hearing Board

Paul Herbein, Zoning Hearing Board Solicitor

Archived from the Maidencreek Township website. Reproduced unaltered; not an official records repository.