MAIDENCREEKTWP.PLANNINGCOMMISSION
P.O. BOX 319, BLANDON, PA 19510
February 5, 2015
John Hoffert Surveying
32 E Lancaster Avenue
Shillington, PA 19607
Dear Mr. Hoffert,
At their February 4, 2015 meeting, the Maidencreek Township Planning Commission
took the following actions:
recommended the Board of Supervisors defer section 190-16.1 of the Code of
Maidencreek Township that requires a water resource study with the condition that
the water resource study will be completed upon a change of use of the property or
if the use intensifies.
recommended the Board of Supervisors grant plan approval to the Brandywine
Transportation Preliminary Plan conditional upon completion of the items in the
January 30, 2015 Great Valley Consultants review letter, which is incorporated by
reference.
The Board of Supervisors next meets on February 12th and these items will be on their
agenda for approval.
Sincerely,
inu Dllas
Diane Hollenbach
Manager
Maidencreek Township
cc:
File
Maidencreek Township Board of Supervisors
Maidencreek Township Authority

PHONE:(610)375-8822
GREATVALLEY CONSULTANTS
1-800-733-4821
FAX:(610)375-8977
75COMMERCEDR/VEWYOMISSING,PA19610-3323
January 30,2015
Maidencreek Township
Planning Commission
P. O.Box 319
Blandon, PA 19510
Attention:
Diane Hollenbach, Township Manager
Re:
Brandywine Transportation
Preliminary PlanReview
GVCFile4026-001
Dear Planning Commissioners:
We received for review a Preliminary Plan titled “Brandywine Transportation,submitted by
John Hoffert Surveying. The plan proposes the development of property located along West
Wesner Road and adjacent to railroad tracks which are roughly parallel to Park Road. The
property will be used as a maintenance facility for school buses and other associated uses.
Please note comments in bold typeface require action by or consideration of the Planning
Commission and Board of Supervisors. The remaining comments should be addressed by the
Applicant or his consultant, directly with Township staff or our office.The plan was reviewed
for conformity with Township Ordinances and Standards, as well as accepted engineering
practice. We offer the following comments for your consideration:
SUBMISSION INFORMATION
1.
Preliminary Plan titled "Brandywine Transportation", prepared by Applied Surveying
Technologies, Inc.,consisting of nine plan sheets as listed:
Date
Plan No.
Sht. No.
Description
Originated
Revised
1of9
5410-11-56-9323-D-001
8/11/14
1/21/15
Title Sheet
2of9
5410-11-56-9323-D-002
8/11/14
1/21/15
Overall Boundary
3of9
8/11/14
5410-11-56-9323-D-003
1/21/15
Rights-of-Way/Easements
4of9
8/11/14
5410-11-56-9323-D-004
1/21/15
Land DevelopmentPlan(East)
5of9
8/11/14
5410-11-56-9323-D-005
1/21/15
Land DevelopmentPlan (West)
6of9
8/11/14
5410-11-56-9323-D-006
1/21/15
Detail Sheet
7of 9
5410-11-56-9323-D-007
8/11/14
1/21/15
Existing Features Plan (East)
8of9
8/11/14
5410-11-56-9323-D-008
1/21/15
Existing Features Plan (West)
9of9
5410-11-56-9323-D-009
1/21/15
Temporary Access Detail Plan
2.
Erosion and Sediment Pollution Control Plans prepared by John Hoffert Surveying
consisting of seven plan sheets as listed:
Engineers Architects
PlannersConsultantsSurveyors
printedon recycled paper

GREATVALLEY CONSULTANTS
Maidencreek Township
January 29, 2015
Planning Commission
Plan No.
Originated
Description
1/21/15
D-15-01-ES1
Erosion and Sediment Pollution Control Plan
1/21/15
D-15-01-ES2
Erosion and Sediment Pollution Control Plan
1/21/15
D-1501-ES3
PCSM Plan
1/21/15
D-15-01-ES4
PCSM Plan
1/21/15
D-15-01-ES5
ESPC Notes/Details
1/21/15
D-15-01-ES6
ESPC Details
D-15-01-ES7
1/21/15
Erosion and Sediment Pollution Control Plan
3.
John Hoffert Surveying Transmittal letter.dated January 21, 2015.
4.
John Hoffert Surveying letter dated January 21, 2015 addressing previous review
comments.
5.
Email chain relating to DEP Sewage Planning Modules.
6.
Draft of Storm Water Management, Storm Water Controls and BEsT Management
Practices Operations and Maintenance Agreement.
7.
Environmental Impact Assessment dated December, 2014.
RESPONSE TO PREVIOUS OUTSTANDING REVIEW COMMENTS
This review will address only those items that were outstanding in the most recent review
completed by Systems Designs Engineering, Inc. (SDE) dated December 3, 2014.
The following comments address the responses to the SDE review letter:
1.
As required by the Zoning Ordinance, an Environmental Impact Assessment dated
December 20i4 prepared by Warmkessel Geo-Environmental, Inc. was included with this
latest submission.
2.
Note number eight was added to the plans to address benchmark information required by
Section 190-15.K. of the Subdivision and Land Development Ordinance (SALDO).
3.
A Water Resources Study required by Section 190-16.1. of the SALDO was submitted for
MTA consideration.
4.
A separate plan was included in this submission titled Temporary Access Detail Plan to
address the construction of the temporary access within the easement. Legal issues
regarding this temporary access are being addressed by the developer's attorney. The
completion of certain regrading by adjacent property owner John Farina was discussed.

GREATVALLEY CONSULTANTS
Maidencreek Township
January 29, 2015
Planning Commission
Such regrading would be necessary for the feasibility of the project. A legal document
indicating Mr. Farina's willingness to complete this work should be submitted to the
Township Solicitor for his review and recommendation.
5.
Sewer Extension plans were submitted directly to MTA for approval. Email
correspondence was provided to indicate that DEP is not requiring sewage planning
modules for this project.
6.
Erosion:and Sediment Pollution Control Plans were included in this submission. Review
and approval of these plans by the Berks County Conservation District is required
according to Section 190-41 of the SALDO.
7.
An MTA signature block was added to the Title Sheet.
8.
A signature block for Ontelaunee Township was added to the Title Sheet.
9.
A note was added to the proposed driveway on the Land Development Plan (East) to
address proper drainage across the driveway.
10.
A Lighting Plan as required in Section 186 of the Streets and Sidewalks Ordinance is
forthcoming.
11.
A draft of the Stormwater Management Operations and Maintenance Agreements was
included with this submission as required by Section 182-32 of the Stormwater
Management Ordinance.
12.
Stormwater easements as required by Section 182-33.B. of the Stormwater Management
Ordinance and are shown on the plans included with this submission.
Please do not hesitate to call our office with any questions regarding the above review.
Sincerely,
CHARLES M. JONES, PE, PLS
Project Manager
CMJ:lam
cc:
Maidencreek Township Board of Supervisors
Maidencreek Township Authority
Eugene Orlando, Esq.
William E. Gross, Wesner Land Associates, LLC
Karen M. Kiater, John Hoffert Surveyor