Lake Ontelaunee Watershed - MS4 TMDL Plan Supplement

Prepared For:
Maidencreek Township, Berks County, Pennsylvania

1 Quarry Road
PO Box 319

Blandon, PA 19510

Prepared by:
Great Valley Consultants

75 Commerce Drive
Wyomissing, PA 19610

Summary

Maidencreek Township, per Federal and State Regulations, has been subject to MS4 NPDES permitting
requirements since the program’s inception in 2003. As a component of the Township’s permit renewal
NOI submission, Systems Design Engineering (SDE) prepared a TMDL Plan on behalf of the Township for
the purposes of complying with the Lake Ontelaunee Watershed TMDL for sediment and nutrients. The
Pennsylvania Department of Environmental Protection (DEP) provided comments to Maidencreek
Township in a letter dated February 26, 2015.

The Department’s review letter identified several perceived deficiencies:

1. A discrepancy between the TMDL document’s description of the drainage area and the TMDL
Strategy Plan’s drainage area.

2. The consultant’s use of the New Hampshire Storm water Manual instead of the Pennsylvania
Storm water BMP manual.

3. The consultant’s recommendation of annual street-sweeping as a BMP to generate the requisite
load reductions when the BMP Manual recommends weekly sweeping to achieve the required
numeric load reduction. Additionally, DEP’s comments note that “wash-on” material entering a
road as opposed to material actually generated within the confines of the roadway cannot be
swept effectively, as much of this loading will transpire during precipitation events.

4. The DEP is requiring that the Township solicit Public Participation and Involvement for the TMDL
strategy.

With these items in consideration, Great Valley Consultants is providing the attached Supplement as an
alternate proposal for the purposes of assisting the Township in complying with the requirements of the
Lake Ontelaunee Watershed TMDL plan.

TMDL MS4 Waste Load Allocations

Per the TMDL, the waste load allocation (WLA) for sediment is 26.6 metric tons/year (58,643 pounds per
year) and the WLA for phosphorous is 5.98 kg/year (13.19 pounds/year). The TMDL requires a reduction
of sediment loading of 74% and a reduction of phosphorous loading of 94%. While these percent
reductions are attributed to the MS4 area, it is clear from a pragmatic standpoint that the Township’s
2.4 acres of streets and adjacent right-of-way are not the source of this quantity of sediment and
nutrients. Other land uses in the drainage area include open fields and agricultural facilities, which are
much more likely to generate the volume and type of materials outlined in the TMDL.

TMDL Strategy

Based upon the conditions outlined above, it is more feasible to proceed first by encouraging property
owners outside the Township’s Right-of-Way to voluntarily implement measures to mitigate the
quantity of sediment and phosphorous in runoff. This can be done implementing agricultural
conservation techniques such as contour farming, no-till farming, or reduced utilization of fertilizers.
Additionally, properties with landscaped features can utilize less fertilizer and pesticides, assuming these

materials are being utilized currently. The key is that outreach can be performed to these property
owners using the assistance of local and County-level conservation agencies specializing in public
education and outreach to agricultural land users. Preliminary conversations with these agencies have
also been promising in securing funding opportunities for these sorts of efforts.

The first step of the plan would involve compiling information about the ownership and uses of the
properties in the drainage area. Second, information of existing private and public storm sewer facilities
would be compiled into a comprehensive view of the subshed draining to Outfall Number 050 on Lake
Ontelaunee. It is anticipated that this phase of the plan would take about a year to implement. In
concurrence with these efforts, as the information is developed, the Township would reach out to local
agencies such as the Berks County Conservation District and Berks Nature (formally the Berks County
Conservancy). The Township already has contact with these organizations through the Berks County
MS4 Steering Committee, a jointly-funded and administered agency which pools resources for Public
Education, Outreach, and Involvement for both MS4-compliance purposes and for general
environmental stewardship. Upon buy-in from these potential stakeholders, a series of meetings could
be scheduled with property owners to test the opportunity for implementation of conservational
measures to mitigate the sediment and phosphorous loading to the Maidencreek Township MS4. It is
expected that these measures would take at least two years to be implemented.

While the implementation of the aforementioned measures by property owners is ongoing, an effort
will be made to map the currently unknown network of private and public storm water facilities that
ultimately drain to Lake Ontelaunee at Outfall Number 050. This will allow for several measures to be
undertaken depending on the outcome of the education, outreach, and involvement efforts towards
property owners. In the event that the property owners “buy-in” to the program, a thorough analysis of
the surrounding area will provide a baseline for measuring improvement over time. If property owners
do not agree to voluntary measures to mitigate pollutants in runoff, a thorough knowledge of property
information, storm water facility ownership and layout will be necessary to assess alternate solutions.

If the Township and its partners are not successful in obtaining voluntary cooperation from property
owners by the conclusion of the third year after notice of approval of the TMDL Strategy Plan by DEP,
the Township will begin plans to seek additional alternatives for TMDL compliance to remediate the
sediment and phosphorous in the runoff from the regulated subwatershed. Please note that until the
Township has developed a thorough inventory of the existing facilities and established a baseline of
existing water quality conditions in the subshed draining to Outfall Number 050, it is not immediately
known what BMP or BMPs will be appropriate to meet the TMDL requirements of 74% reduction in
sediment and a 94% reduction in phosphorous.

Preliminary Facilities Inventory

The Township has access to land development plans of one of the private properties in the regulated
watershed area and will begin incorporating this information with the Township’s storm water facilities
map. The Township has also retained our office to locate other suspected existing facilities, including a
cross-pipe under the railroad from one private property to another. As previously outlined, this work
will continue throughout the approval process of this TMDL Strategy Plan.

Other MS4-Related Activities

The Township will also continue all regular MS4-related efforts associated with these facilities, including
IDD&E inspections and PCSWM inspections. The Township will also continue to undertake the non-
structural BMP of annual street sweeping activities as mentioned in the previous 2013 TMDL Strategy
Plan submission by Systems Design Engineering.

Archived from the Maidencreek Township website. Reproduced unaltered; not an official records repository.