Other Township Records

Da Zoning Decision Land Development — February 27, 2015

Date
February 27, 2015
Type
Land Development
Year
2015
File
PDF · 11.0 MB

Download original Open in browser

Document text

Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 3,434 words

BEFORE THE ZONING HEARING BOARD OF MAIDENCREEK TOWNSHIP
BERKS COUNTY, PENNSYLVANIA
OF
IN RE:
APPLICATION
CELLCO PARTNERSHIP, D/B/AVERIZON
WIRELESS REGARDING A 50' X 50' LEASED AREA LOCATED ON
THE PROPERTY AT 220 BUENA VISTA ROAD, MAIDENCREEK
TOWNSHIP, BERKS COUNTY,PENNSYLVANIA
DECISION
FINDINGS OF FACT
1.
Applicant is Cellco Partnership, d/b/a Verizon Wireless (hereinafter
referred to as "Applicant'), with an address of 1120 Sanctuary Parkway, #150
GASA5REG, Alpharetta, GA 30009-7630, and an address in the Commonwealth of
Pennsylvania, pursuant to the Application, of c/o Catherine E.N. Durso, Esquire,
Fitzpatrick, Lentz & Bubba, P.C., 4001 Schoolhouse Lane, Center Valley, PA 18034.
2.
The property which is the subject of the Application is a 50' x 50' space
located on a property located at 220 Buena Vista Road, Maidencreek Township, Berks
County, Pennsylvania 19510 ("Property").
3.
The legal owner of the Property is C & D Zwicky, LLC. Applicant has
authorization of the owner to apply to the Zoning Hearing Board for the requested
relief. (Applicant Exhibit 1, Authorization of David Zwicky, dated February 27, 2015;
Testimony of Sue Manchel, Site Acquisition Consultant, Verizon Wireless).
4.
The Property is identified in Berks County Records as Parcel Identification
Number 61-5412-04-72-1792. (See, Applicant Exhibit 3, Zoning Drawings)

5.
The Property is a 113.43 acre tract, divided between three (3) zoning
districts, which are the R-1 Low Density Residential District, the I-Industrial District,
and the SIA-Special Intensified Agricultural District of Maidencreek Township, the
limits of which Zoning Districts are shown in the Zoning Map accompanying the
Maidencreek Township Zoning Ordinance of 1993, as amended, found at Chapter 220
of the Code of Ordinances of Maidencreek Township ("Zoning Ordinance").1
6.
The current use of the Property is as a processing and recycling facility,
which is an industrial use. (Maidencreek Township Zoning Hearing Board Notice of
Appeal or Application, Board Exhibit 8).
7.
Applicant, by its Zoning Hearing Board Notice of Appeal or Application,
(" Application")2 requested the following relief, in the alternative:
a)
An appeal from the action of the Maidencreek Township Zoning
Officer in refusing an application for Zoning Permit for a proposed wireless
communication facility on March 31, 2015;
b)
A request for interpretation of the Zoning Ordinance to the effect
that Sections 220-48 and 220-88 permit wireless communication facilities as
conditional uses in all Zoning Districts in Maidencreek Township; or,
c)
A request for variance to allow the construction of the wireless
communication facility
1 The Zoning Ordinance was marked as Board Exhibit 9 to the record of the hearing.
2 A true and correct copy of the Application and Supplemental Statement was marked at the hearing and
entered into the record as Board Exhibit 8.

8.
The regulations governing the R-1 Zoning District are found in Article V
of the Zoning Ordinance, Sections 220-18 to 220-20 of the Zoning Ordinance.
9.
The regulations governing the I Zoning District are found in Article XII of
the Zoning Ordinance, Sections 220-45 to 220-48 of the Zoning Ordinance.
10.
The regulations governing the SIA Zoning District are found in Article
XIV of the Zoning Ordinance, Sections 220-49 to 220-52 of the Zoning Ordinance.
11.
The area at issue in this Application is a 50' x 50' area on the east side of
the Property, which will be leased by the Applicant.
12.
The leased area which is the subject of this Application is located in the R-
1 Zoning District. (See, Testimony of Petros Tsoukalas of Maser Consulting, P.A., and
Zoning Drawings, Applicant Exhibit 3 (Site Plan, Drawing Number Z-2).
13.
Appropriate areas for the location of a wireless communications facility
are determined by a Site Acquisition Consultant, in cooperation with a Radio Frequency
Engineer. The Radio Frequency Engineer supplies the Site Acquisition Consultant with
a "search ring" containing an area in which a site needs to be located and acquired for a
facility, in order to close a capacity or coverage gap for the carrier. (Testimony of Sue
Manchel, Site Acquisition Consultant, Verizon Wireless; Testimony of Andrew
Petersohn, Radio Frequency Design Engineer, DBM Engineering).
14.
Applicant has wireless communication coverage and capacity gaps in
Maidencreek Township, which can result in poor quality and dropped cellular calls,
and/or inability to connect to the Internet or maintain a connection for Verizon users.
(Testimony of Andrew Petersohn, Radio Frequency
yDesignEngineer,DBM

Engineering; Applicant Exhibits 7 and 8, showing existing coverage and coverage which
would be provided by the proposed site).
15.
Coverage and capacity gaps, in addition to depriving users of the service
to which they are entitled, can create a hazard to public safety, as such gaps can
interfere with emergency communications. (Testimony of Andrew Petersohn, Radio
Frequency Design Engineer, DBM Engineering).
16.
The site in question, to be known as the Reading/Evansville site, will fill
the existing Verizon coverage and capacity gaps by offloading traffic from the existing
Fleetwood and Shoemakersville sites. (Testimony of Andrew Petersohn, Radio
existing coverage and coverage which would be provided by the proposed site).
17.
There is an increasing demand for wireless service, due to the many
homes (two in five nationally) which have abandoned land lines for phone service, and
rely solely on cell phones, as well as the proliferation of wireless devices. (Testimony of
Andrew Petersohn, Radio Frequency Design Engineer, DBM Engineering),
18.
The Property was necessary for the wireless communication facility
because of:
a)
its large size of approximately one hundred thirteen (113) acres, so
that there would be no difficulty meeting required setbacks;
b)
compatibility of the wireless communication facility with the
existing industrial use of the Property; and,

the higher elevations on the Property than on other properties in
industrial use within the search ring.
(Testimony of Sue Manchel, Site Acquisition Consultant, Verizon Wireless).
19.
Other properties and areas in industrial use and zoning were considered,
but they had a lower elevation, which would have required a higher tower in the 125'
tower proposed. (Testimony of Sue Manchel, Site Acquisition Consultant, Verizon
Wireless).
20.
There is little leeway as to the placement of a wireless communications
site. (See, Testimony of Petros Tsoukalas of Maser Consulting, P.A.).
21.
The cement manufacturing property, which is within the search ring and
in the Industrial Zoning District, is one hundred feet (100') lower in elevation than the
Property, and a much taller monopole antenna would be required on that site.
(Testimony of Andrew Petersohn, P.E.).
22.
Applicant's Site Acquisition Consultant looked for existing structures,
such as water towers, silos, and high buildings, on which to locate its antennas, but
found none suitable within the search ring. (Testimony of Sue Manchel, Site Acquisition
Consultant, Verizon Wireless).
23. The proposed facility will consist of a freestanding wireless
communication facility. The facility would be comprised of a one hundred twenty five
foot (125') monopole antenna (one hundred thirty feet (130’) to the top of a lightning
rod) with twelve (12) panel antennas for cellular carriers at the 125' elevation, with an
equipment shelter with a standby generator on concrete pads, within the above-

referenced 50' x 50' leased area. (See, Supplemental Statement to Application, Board
Exhibit 8; Partial Site Plan, Drawing Number Z-3, Applicant Exhibit 3; Testimony of
Petros Tsoukalas of Maser Consulting, P.A.),
24. 
The compound will be fenced with a seven foot (7') fence, with one foot
(1') of barbed wire at the top of the fence (which will have a locked gate, and
landscaping around the compound. (See, Testimony of Petros Tsoukalas of Maser
Consulting, P.A. and Partial Site Plan and Compound Layout and Elevation View,
Applicant Exhibit 3, Drawing Numbers Z-3 and Z-4).
25. 
The compound will be accessed by a proposed twenty foot (20') wide
access easement of approximately thirty feet (30') in length, with a twelve foot (12')
wide, dust-free, all-weather surface in the form of a gravel access drive and two off-
street parking spaces. (See, Testimony of Petros Tsoukalas of Maser Consulting, P.A.,
Numbers Z-2 and Z-3))
26. 
The compound will have a twenty foot (20') wide utility easement, and
will be served by underground lines from a proposed utility pole. (See, Testimony of
Petros Tsoukalas of Maser Consulting, P.A., and Zoning Drawings, Applicant Exhibit 3
(Site Plan, Drawing Number Z-2)),
27. 
The tower will be grounded in accordance with National Electrical Code
(NEC) requirements. (See, Testimony of Petros Tsoukalas of Maser Consulting, P.A.).

28.
The equipment shelter will be 12'9" v 11.5' in dimension, and will be
placed on a concrete slab. (See, Testimony of Petros Tsoukalas of Maser Consulting,
P.A.).
29.
All equipment will be in the equipment shelter. (See, Testimony of Petros
Tsoukalas of Maser Consulting, P.A.).
30.
The tower will be connected to the equipment shelter by way of hyperflex
cables. (See, Testimony of Petros Tsoukalas of Maser Consulting, P.A.).
31.
The site will be unmanned and will be remotely monitored, with the
exception of periodic maintenance by a technician visiting every four (4) to six (6) weeks
or in the event of the need for repairs,. (See, Testimony of Petros Tsoukalas of Maser
Consulting, P.A.),
32.
On the site, there will be a standby diesel generator, which will be cycled
every one to two weeks, which will only be placed in operation to prevent service
interruption in the event of a power outage. The generator, when running, gives off
Tsoukalas of Maser Consulting, P.A.).
33.
The visibility of the tower from four locations in the Township was
represented by a weather balloon simulation shown in photographs in Applicant
Exhibit 4. (See, Testimony of Petros Tsoukalas of Maser Consulting, P.A. and
Photographs of Simulation, Applicant Exhibit 4).

34.
The tower and building are located in excess of all setbacks from property
lines and other structures. (See, Testimony of Petros Tsoukalas of Maser Consulting,
P.A.).
35.
The facility will meet all industry standards for construction, contained in
the Pennsylvania Uniform Construction Code, which incorporates the 2009
International Building Code and telecommunications industry standards.
(See,
Testimony of Petros Tsoukalas of Maser Consulting, P.A.).
36.
The facility will have a site-specific foundation, as required by
telecommunications industry standards. (See, Testimony of Petros Tsoukalas of Maser
Consulting, P.A.),
37.
The antenna will be constructed in accordance with the specification
sheets marked as Applicant Exhibit 9 at the hearing.
(See, Testimony of Petros
Tsoukalas of Maser Consulting, P.A.).
38.
Up to three (3) other wireless carriers will be able to co-locate on the
proposed tower, with ten foot (10') intervals between each carrier's antennas vertically
on the monopole. (See, Testimony of Petros Tsoukalas of Maser Consulting, P.A.;
Applicant Exhibit 5).
39.
The facility will comply with FCC standards for human exposure to radio
frequency (EMF) exposure, with or without co-located equipment. The cumulative
exposure levels would be approximately two hundred (200) times less than permitted
under FCC standards, with just one carrier, and even with four carriers would fall well

below FCC standards for EMF exposure. (See, Testimony of Andrew M. Petersohn,
P.E.; EMF Compliance Report, Applicant Exhibit 10).
40. 
The tower will not require lighting or marking pursuant to the regulations
of the Pennsylvania Bureau of Aviation or the Federal Aviation Administration, as it is
not considered to be a hazard to aviation or within proximity to an airport so as to
require such lighting or marking. (See, Testimony of Andrew M. Petersohn, P.E.;
Determination from the Pennsylvania Bureau of Aviation, Applicant Exhibit 12; Federal
Aviation Administration Screening Determination, Applicant Exhibit 13)
41.
Applicant possesses licensure in the form of Radio Station Authorizations
from the Federal Communications Commission - Wireless Telecommunications Bureau
(FCC) to provide wireless service in Maidencreek Township. The licensure is for
Cellular, AW-AWS (1710-1755 MHz and 2110-2155 MHz), CW-PCS Broadband, and
WU-700 MHz Upper Band (Block C) radio service. (FCC Licenses, Applicant Exhibit 2;
Testimony of Sue Manchel, Site Acquisition Consultant, Verizon Wireless).
42. 
Applicant applied to Maidencreek Township for a Zoning Permit.3 The
Permit Application was denied by the Zoning Officer for Maidencreek Township on
March 31, 2015.
43.
On April 6, 2015, Applicant made application to the Maidencreek
Township Zoning Hearing Board ("Zoning Hearing Board") for the subject relief.
3 The Zoning Permit Application was marked and entered into the record as Board Exhibit 8.

44.
Notice of the hearing was duly advertised in the Reading Eagle on May 6,
2015 and May 13, 2015.4
45.
On May 27, 2015, the Zoning Hearing Board held a public hearing to
consider the Applicant's appeal, request for interpretation, and request for variance. A
stenographic record was taken of the proceedings.
46.
Notices of the hearing were posted on the Property, posted at the
Maidencreek Township Building, and mailed to the Maidencreek Township Board of
Supervisors, the Maidencreek Township Planning Commission, and owners of record
of properties within one thousand feet (1,000 ft.) of the Property, as required by the
Pennsylvania Municipalities Planning Code and the Zoning Ordinance.5
47.
The Maidencreek Township Planning Commission, by letter dated May 8,
2015 to the Zoning Hearing Board, stated that it had discussed the Application at its
meeting of May 6, 2015, and recommended that if the Zoning Hearing Board were to
grant the variance, that the condition be imposed that the project satisfy Section 220-48
of the Zoning Ordinance, and that a land development plan be required. The Township
did not enter an appearance at the hearing.6
4 Proof of Publication in the Reading Eagle was made a part of the record and marked as Board Exhibit 7.
5 Affidavits of Posting of the Public Hearing Notice on April 13, 2015 at the Maidencreek Township
Building and the Property on April 14, 2015 were made a part of the record and marked as Board Exhibits
2 and 3, respectively. Affidavit of Mailing of letters to potentially interested parties were made a part of
the record, and marked as Board Exhibits 4 and 5, respectively.
6 A copy of the letter from the Planning Commissoion to the members of the Zoning Hearing Board was
made a part of the record and marked as Board Exhibit 6.
10

48.
although several property owners who received notice of the hearing were present and
asked questions of the Applicant.
49.
Applicant agreed to submit a land development plan for the facility to the
Township, and agreed to remove the facility in the event of its abandonment, in
accordance with Section 220-48 of the Zoning Ordinance. (See, Testimony of Sue
Manchel, Site Acquisition Consultant)
CONCLUSIONS OF LAW
1.
The Zoning Hearing Board of Maidencreek Township, under Section 910.2
of the Pennsylvania Municipalities Code, 53 P.S. Section 10910.2, and under Article
XVIII, Section 220-96(F) of the Zoning Ordinance, has jurisdiction to hear and decide
this Application for Variance.
2.
The Zoning Ordinance was duly enacted according to law on March 11,
2010 and was in full force and effect during all time periods relevant to these
proceedings.
3.
Applicant, as a lessee, with the written authorization of the owner of
record of the Property, has standing to bring this Application.
4.
The Application for Variance/ Appeal, dated April 6, 2015, after the denial
of the Zoning Permit on or about March 31, 2015, was timely filed under Section 220-
97(B)(3) of the Zoning Ordinance
11

5.
The hearing on the Application was advertised and notice given to
interested parties in accordance with the terms of Section 908 of the Municipalities
Planning Code, 53 P.S. Section 10908, and Section 220-97(C) of the Zoning Ordinance.
6.
The hearing on the Application was held in conformity with Section 908 of
the Municipalities Planning Code, 53 P.S. Section 10908, and Section 220-97 of the
Zoning Ordinance.
7.
The decision of the Zoning Hearing Board was deliberated and rendered
in compliance with the Pennsylvania Sunshine Act, 65 Pa. Cons. Stat. ss 701-716.
8.
There are characteristics unique to the property creating a hardship;
namely, that the Property is in industrial use and the leased area is not appropriate for
the uses permitted in the R-1 Zoning District.
9.
There is a significant coverage and capacity gap in Maidencreek
Township, which is not being absorbed by Applicant's current Fleetwood and
Shoemakersville sites.
10.
The coverage and capacity gaps present hazards to public health, safety,
and welfare, as such gaps may interfere with emergency communications.
11.
A carrier is required to fill coverage and capacity gaps in service under the
federal Telecommunications Act of 1996, Pub. L. No. 104-104, 110 Stat. 56 (Feb. 8, 1996)
as amended.
12.
facilities on properties within the search ring as determined by Applicant's Radio
Frequency Engineers.
12

13.
Applicant's Site Selection Consultant made a diligent search for other sites
within the search ring, including tower sites suitable for co-location, existing structures,
and properties located in the Industrial Zoning District, where wireless communication
towers are permitted as a conditional use.
14.
The only site on which a wireless communication could have been located
had a far lower elevation by approximately one hundred feet (100'), and would have
required a higher tower, which would have had more detrimental visual impact than
the current location.
15.
The proposed use requested in the Application for Variance will not be
detrimental to the health, safety, and welfare of the general public.
16.
The variance, as authorized, will not alter the essential character of the
neighborhood.
17.
intrusive or detrimental visual impact.
18.
The proposed tower height is the minimum needed to fill the Verizon
coverage and capacity gaps from the Fleetwood and Shoemakersville sites.
19. 
The variance, as authorized, will not alter substantially or permanently
impair the appropriate use and development of adjacent properties.
20.
The variance, if authorized, will have no negative impact on utilities.
21.
The proposed facility does not have any nuisance characteristics such as
odors, fumes, noise, glare, or dust, and EMF emissions are well below the FCC limits for
safe human exposure.
13

22.
The variance, as authorized, is the minimum variance which will afford
relief and will represent the least possible modification of the applicable standards
contained in the Zoning Ordinance.
III.
ORDER
AND NOW, this 27th day of May, 2015, upon consideration of the Application of
Cellco Partnership, d/b/a Verizon Wireless, for a variance from the terms of the
Maidencreek Township Zoning Ordinance of 1993, as amended,7 and the testimony and
evidence entered into the record in support thereof, it is hereby ORDERED that the
variance to allow the wireless communication facility on the 50' x 50' leased area of the
subject to the following terms and conditions:
1.
Applicant shall comply with the standards and requirements set forth in
Section 220-48 of the Zoning Ordinance, including but not limited to the submission
and approval of a land development plan for the wireless communication facility, and
the removal of the facility if abandoned.
2.
Applicant shall comply with all applicable federal, state, and local laws,
regulations, and ordinances with respect to the construction, maintenance, and
operation of the wireless communication facility.
7 The Request for Interpretation and appeal from the decision of the Zoning Officer, which sought an
interpretation of the Zoning Ordinance that the wireless communication tower use was a conditional use
in all Zoning Districts in the Township are rendered moot by this Decision, and the Zoning Hearing
Board takes no position with respect to the interpretation of Section 220-48 of the Zoning Ordinance and
its applicability in the I-Industrial District only, or Township wide.
14

3.
Applicant shall procure all permits and approvals for the proposed
addition as required by applicable laws, ordinances, and regulations
4.
The facility shall be constructed, maintained, and operated in accordance
with industry standards, and in accordance with the testimony and evidence presented
at the hearing of May 7, 2015.
MAIDENCREEKTOWNSHIP
ZONINGHEARINGBOARD
WilliamRiedel,Chair
Toseph Pendleton
Jan Williams
Vote of 3-0 to grant the variance.
MAIDENCREEK TOWNSHIP ZONING HEARING BOARD TO FILE AN APPEAL
COMMON PLEAS OF BERKS COUNTY, PENNSYLVANIA.
15

BEFORE THEZONINGHEARINGBOARDOFMAIDENCREEKTOWNSHIP
BERKS COUNTY,PENNSYLVANIA
IN RE:
APPLICATION OF CELLCO PARTNERSHIP, D/B/A VERIZON WIRELESS
22O BUENA VISTA ROAD, MAIDENCREEK TOWNSHIP, BERKS COUNTY,
PENNSYLVANIA
CERTIFICATION OF SERVICE
I, Diane Hollenbach, Maidencreek Township Manager and Zoning Hearing Board
Secretary, certify that I have forwarded a copy of the within Decision and Order of the
Maidencreek Township Zoning Hearing Board to the following individuals via First Class U.S.
Mail, postage prepaid, on the/5t day of Jiane, 2015:
Erich J. Schock, Esquire
Fitzpatrick Lentz & Bubba, P.C.
4001 Schoolhouse Lane, P.O. Box 219
Center Valley, PA 18034
Eugene Orlando, Jr., Esquire
Orlando Law Offices, P.C.
2901 St. Lawrence Avenue
Reading, PA 19606
Kenneth L. Fulmer, P.E., PLS, President
Great Valley Consultants
75 Commerce Drive
Wyomissing, PA 19610
Joan E. London, Esquire
Kozloff Stoudt, Professional Corporation
2640 Westview Drive
Wyomissing, PA 19610
MAIDENCREEKTOWNSHIP
ZONING HEARING BOARD
lloach
Liam
Diane Hollenbach,
Township Manager/ZHB Secretary
16

Archived from the Maidencreek Township website. Reproduced unaltered; not an official records repository.