MAIDENCREEK TOWNSHIP AUTHORITY
Meeting on March 11, 2015
Engineer's Report
1. Sewer Treatment Plant
Systems Design Engineering is working with the General Manager on other projects as
requested:
1. RAS/WAS Pump seals - ongoing with Pat D. on pump evaluations
2. Sludge dewatering system - Preliminary design reviewed with Pat D. We
are putting on the radar again because of potential difficulties of getting rid
of liquid sludge.
3. Plant operations and the UV system.
The Chapter 94 Report will be presented for review and approval.
2. Utility Water Project
The Utility Water Project bids were received on May 7, 2014.
The responsible low bid is:
Blooming Glenn Contractors
901Minsi Trail
Blo0ming, PA 18911
Contracts A & B Combined - $91,366.50
Construction is complete and the system is operating. When the weather breaks final
paving remains.
3. Phosphorus Building Project
The Phosphorus Building Project bids were received and contracts are being
compiled.
The responsible low bids are:
Advanced Rehabilitation Technology
Contracts A - $414,000
Eastern Environmental Contractors, Inc.
Contracts B - $38,380

4. Well 6 Property
Systems Design is proceeding with bid documents for the construction of Wells 6 and
7. SDE has also begun work on how to handle all the water that will be created from
the drilling and drawdown tests.
5. GIS Project
Systems Design has continues to develop the GIS system with base plans and data.
Work accomplished this month is as follows:
Populating information within the database for both water and sewer.
Scanning historical data to link to the database.
We will present the work to date and show the Route 222 PennDOT planned work
6. Sludge Equipment Replacement
The low bid for the equipment is:
Watermark Environmental Systems
Exton, PA 19341
Total bid - $41,711,00
Contracts will be presented for signature.
7. Surge Protection Project
The low bid for the equipment is:
Hirneisen Electric, Inc.
1619 Old Lancaster Pike
Reading, PA 19608
Total Bid - $83,854.00
Contracts will be presented for signature.

Subdivision/LandDevelopment Plans
BradleySubdivision
2nd review for approval.
PennDOT SR 222 Project
Systems Design is assisting with providing information to PennDOT on their proposed
project and how is effects the Authority's water and sewer utilities. SDE has begun the
evaluation of the project for the Authority's consideration of how to handle existing
and future lines.
 Project Closeouts
Melrose Place - The closeout letter presented in September was sent to the Developer
Punchlist items are progressing.
Villages at Summit Crest Phases I and II - Systems Design Engineering is
supporting continuing efforts of the Solicitor on the project.
Esbenshades Greenhouse -- An inspection is being scheduled to view the backflow
devices installed.
Report written 3/11/15
I:\Projects\Old Projects\Greg's Computer\Documents\Maidencreek\Meetings\2015\150311.doc

-19
Apr-
Jan-
One Month Maximum Organic Load
-18
-100
Monthly Avg. Daily Organic Load
Annual Avg. Daily Organic Load
-18
-18
Apr-
-18
Jan-
-17
Jul-17
Apr-17
-17
MAIDENCREEK TOWNSHIP AUTHORITY
-uef
-40
SEWAGE TREATMENT PLANT
-16
-Idv
Figure 2 - Organic Load
-16
-10
Jul-15
Apr-
Date
Jan-
-14
1-100
Jul-13
-13
Oct-12
Jul-12
-12
Jan-
Jul-10
Jan-10
2000
1800
1600
1400
1200
1000
800
200
Load [#/day]

Oct-19
Jul-19
 Three Month Maximum Flow
Oct-18
 Plant Capacity
Monthly Flow
81-nr
Annual Flow
Oct-17
Jul-17
Apr-17
Oct-16
Jul-16
 TOWNSHIP AUTHORITY
Apr-16
Jan-16
SEWAGE TREATMENT PLANT
Oct-15
Fig. 1 - Hydraulic Load
Jul-15
Apr-15
Jan-15
Date
Jul-14
MAIDENCREEK
Oct-13
Jul-13
Apr-13
Jan-13
Oct-12
Jul-12
Apr-12
Jan-12
Oct-11
Jul-11
Apr-11
Oct-10
Jul-10
Apr-10
Jan-10
0.80
0.60
0.40
1.20
1.00
0.20
HydraulicFlow

Systems Design Engineering, Jnc.
SDS
Engineers·SurveyorsPlanners·ConstructionManagers
March 11, 2015
Maidencreek Township Authority
PO Box 289
1 Quarry Road
Blandon, PA 19510
Re:
Bradley Subdivision
Preliminary Plan
2nd review
Dear Authority Members:
We are in receipt of a subdivision plan entitled Preliminary Plan Bradley Subdivision
prepared by Stackhouse Bensinger.
The plan proposes to create:
Lot 1 - 23,915 S.F.
Lot 2 - 1.50 acres
Annexation Parcel -- 1.070 acres
Parcel A Residue -- 21.042 acres
Parcel B & C Residue -- 14.127 acres
The plan submittal consists of 2 sheets as follows:
TITLE
DATE
SHEETNUMBER
REV.
Layout Plan
2014-093-D-1.1
2-17-2015
1.
2014-093-D-1.2
Subdivision Plan
2-17-2015
1.
We have reviewed the above referenced plans and have the following comments for your
consideration:
General:
1. Lot 1 has existing Public Water and Sewer
2. Lot 2 proposes on-site Water and Sewer, unless the on-site sewer fails then connect to
Public
3. Residue tract states Public Sewer and on-site Water.
1032 James Drive Leesport, PA 19533-Tel.610-916-8500 Fax 610-916-8501www.sdei.net sde@sdei.net
P.0.Box353·SchuylkillHaven,PA17972·Tel.570-385-5549
Boyertown,PA·Tel.610-369-1319

Sewer:
1. Applicant shall show all public sewer utilities in Lee Spring Road. Completed and
acceptable.
2. Applicant shall provide rational for Lot 2 sewer connection in right-of-way/easement
across Lot 1 and other private property instead of Lee Spring Road to include the profile
of Lee Spring Road. Note provided on the plan that states Lot 2 will be connected to
a new sewer extension in Lee Spring Road if the on-lot system fails and an alternate
system is required. It is not proposed to be connected at this time.
3. Alternately, remove statement about Public connection and remove future easement
shown on the drawing. Removed and acceptable.
Water:
1. Applicant shall show all public water utilities in Lee Spring Road. Completed and
acceptable.
Please contact the undersigned with any questions:
Respectfully Submitted
Systems Design Engineering, Inc.
Gregory T. Unger, P.E.
Authority Engineer
CC:
Maidencreek Township Supervisors
Maidencreek Township Planning Commission
Dan Becker, Esq.
The Village of Summit Crest, LLC
Stackhouse Bensinger, Inc.
File I:/Projects\Maidencreek Township Authority/15-0466-0522 Bradley Subdivisionl150311 2nd review.docx
SD8

Systems Design Engineering,Jnc.
SD8
Engineers ·Surveyors ·Planners ·Construction Managers
March 6, 2015
Maidencreek Township Authority
PO Box 289
Blandon PA, 19510
Re:
Brandywine Transportation
Public Sanitary Sewer & Water Review
Maidencreek Township
Berks County, Pennsylvania
Dear Authority Members:
We have reviewed the Plans labeled “Final"' for “Brandywine Transportation" (plans
prepared by Applied Surveying Technologies, Inc. with the application agent John W.
Hoffert, PLS, Ltd.) concerning sanitary sewer and water and offer the following for your
consideration:
Sheet No.
Plan Name
Date
Revision
1of8
Title Sheet
08/11/14
3/04/15
2of8
Overall Boundary
08/11/14
2/17/15
3of8
Rights-of-Way/Easements
08/11/14
2/17/15
4of 8
Land Development Plan (East)
08/11/14
2/17/15
5 of8
Land Development Plan (West)
08/11/14
2/17/15
6of8
Detail Sheet
08/11/14
2/17/15
7of8
Existing Features Plan (East)
08/11/14
2/17/15
8of8
Existing Features Plan (East)
08/11/14
2/17/15
GENERAL
The proposed land development plan is for the construction of office/sales and maintenance
building for buses including parking facilities for employees and buses, training area for bus
drivers, associated stormwater facilities, and served by on-lot water and public sewer. The
maintenance is to include cleaning and washing of the school buses. The public sewer is to
be provided with a sewer extension.
1032 James Drive·Leesport, PA 19533Tel.610-916-8500·Fax 610-916-8501·www.sdei.net·sde@sdei.net
P.0.Box353·Schuylkill Haven,PA17972·Tel.570-385-5549
Boyertown, PA·Tel.610-369-1319

Maidencreek Twp. Mun. Auth.
Page 2
Brandywine Transportation
Final Plan
SanitarySewer&WaterReview
March 6, 2015
SANITARY SEWERS
1.
The proposed flow from the facility is to be 213 gpd as calculated by the Applicant's
agent. The sewer tapping fee using this flow rate will be $13.77/gpd which equates
to $2,933.01. In order for the Authority to bill for the sewer flows, a meter will need
to be installed on the water source. The quarterly sewer bills would be based on the
meter readings.
3.6.15 - Note 23 was added to the plans concerning the meter. Comment
satisfactorily addressed.
2.
The Owner will be responsible for all applicable costs (tapping fees, review fees,
permit fees, etc.). The owner will also be responsible for the cost and installation of
the meter. The meter will be provided by the Authority, but the size of the meter
needs to be determined by the property owner. A note shall be placed on the plan
stating that “Additional fees may be required based on sewer use reviewed on a
yearly basis complying with all rules and regulations of the Maidencreek Township
Authority for tapping fees".
3.6.15 - Notes 23 and 24 were added to the plans. The same note as in Note 24
shall also be included in the Developer's Agreement. Additionally the Township
Solicitor should review and approve the Improvement's Agreement which shall
include an escrow of the proposed sanitary sewer extension. Comment partially
addressed.
3.
The Application notes bus washing will be performed, and it appears to be in only 1
of the 4 bays. The appropriate type and size interceptor/separator in accordance with
the International Plumbing Code and the Rules and Regulations of the Authority will
be required for the bus washing operation. It is unclear if there will be a small
kitchenette installed for the facility. Information on the type of proposed kitchen
should be submitted to the Authority for review. A grease trap may be required for
the kitchenette. A complete set of plumbing plans will be required to show these
required facilities per Code.
3.6.15 - Note 25 was added to the plans to address the interceptor/separator, but
no information was offered concerning the kitchenette. Once the plumbing
plans are received, the type can be addressed with the applicant prior to the
issuance of the building permit. Comment satisfactorily addressed.
30S

Maidencreek Twp. Mun. Auth.
Page 3
Brandywine Transportation
Final Plan
Sanitary Sewer&WaterReview
March 6, 2015
4.
The proposed vertical separation distance between the relocated gas main and the
new sewer extension is 1.5 feet (18 inches). We recommend that the sewer
extension be shortened and installed within the proposed public right-of-way with
the lateral connected to this shorter extension. We do not recommend the Authority
approve the sewer extension and sewer easement as shown on the plans. The shorter
sewer extension in the public right-of-way does not require a sewer easement. The
only portion of the lateral that would be the Authority's responsibility is the section
within the public right-of-way. The lateral/building sewer would be the utility to
cross the relocated gas main and not the sewer main. At a minimum, details for the
sanitary sewer trench bedding, backfill and restoration along with the manhole detail,
frame and cover, lateral connection, and a detail on the connection to the existing
manhole with the appropriate pipe to manhole adapter noted in the detail. A detail for
concrete encasement may be required for the lateral/building sewer.
3.6.15 - The proposed sewer extension of the 8" main was revised to be
completely within the public road right-of-way that is being offered to the
Township for dedication. The Authority should not take dedication of the 8"
main until after the Township has taken dedication of the road right-of-way.
The proposed relocated gas main is approximately 10 feet from the proposed
manhole and the private lateral is the facility that crosses the main. Comment
satisfactorily addressed.
5.
A clearer plan view reflecting the existing road right-of-way should be provided.
3.6.15 -- The plans have been revised to reflect the right-of-ways. Comment
satisfactorily addressed.
6.
A Township road opening permit will be required for the proposed sewer extension.
3.6.15 -- Comment acknowledged by applicant's engineer.
WATER
1.
The Developer is proposing that the facility be served by on-lot water and the plans
reflect both a primary well location and an alternate proposed well location. The
applicant's agent submitted a letter dated November 18, 2014 requesting a waiver of
SALDO Section 190-16.I - Water Resources Study. Per this SALDO Section, the
Authority shall make the determination whether a Water Resources Study will be
required for this proposed Land Development Plan. The proposed non-residential
development tract size is 24.51 gross acres with approximately 1/3 of the tract
proposed to be developed. Of the area being developed, most of the proposed lot
coverage will be gravel. The soil groups on the property are hydrologic groups B
and D. Please note that a condition of the Zoning Hearing Board Decision was that
no more than 3o buses per week are to enter and/or exit the property.
SDE

Maidencreek Twp. Mun. Auth.
Page 4
Brandywine Transportation
Final Plan
Sanitary Sewer & Water Review
March 6, 2015
It is our recommendation with the proposed small water and sewer demand of 213
gpd, and considering the size of the tract and type of coverage, that the Authority
recommend to the Township that the waiver of SALDO Section 190-16.1 be granted
by the BOs. However, if at any time the intensity of the facility increases including
the number of buses and employees, and/or expansion of the facility, the Authority
and Township reserve the right to request a Water Resources Study. A note shall be
placed on the plans stating the above.
3.6.15 - The Authority at their February 11, 2015 meeting recommended that
the Water Resources Study waiver should be considered by the BOS. Comment
satisfactorily addressed.
2.
A backflow prevention device is recommended to be provided to protect the ground
water source.
3.6.15 - Note 26 was added to the plans. Comment satisfactorily addressed.
GENERAL
1.
After Final Plans are received and comments are addressed to the satisfaction of the
Authority, four (4) copies of Final plans will need to be submitted to the Authority
for approval along with any additional documentation required by the Authority and
the Authority Solicitor, and including an Improvements Agreement for the proposed
sewer improvements will need to be established.
3.6.15 - SDE recommends that the Authority consider approving the
Brandywine Transportation plans with the following conditions: the issues in
comment number 2 under "Sanitary Sewers" shall be satisfactorily addressed
and any documentation that is required by the Authority Solicitor for the future
dedication shall be approved by the Solicitor prior to the dedication of the sewer
extension.
Sincerely,
SYSTEMS DESIGN ENGINEERING, INC.
Pamela J. Stevens, P.E.
p.stevens@sdei.net
cc:
Maidencreek Township Supervisors
Maidencreek Planning Commission
Applied Surveying Technologies, Inc.
John W. Hoffert, PLS, Ltd.
Wesner Land Associates, LLC.
File 15-0466-0538

Archived from the Maidencreek Township website. Reproduced unaltered; not an official records repository.