Left Turn Arrows on Rt 222
Route 222 north and south are Not close to meeting warrants for a left turn arrow after construction of
the round about project with road widening.
2015 traffic counts - 27,000 vehicles per day -need 65,000 vehicles per day to warrant a left turn
arrow.
At A.M. peak hour there are 29 vehicles in that hour trying to make a left turn from 222 North on to Rt
73 West
There are 3600 seconds in an hour and 110 seconds in a traffic signal cycle (all 4 approaches)
3600/110=32 cycles in an hour - 1 vehicle per cycle is making a left turn from Rt 222 to Rt 73.
A left turn arrow is warranted when more than 2 vehicles per cycle are making the left turn.
As designed the intersection will service all vehicles in one cycle. Level of service B. Left turn arrows
take 15 seconds from the other approaches and will drop the intersection by one level of service.
Penn DoT will install all hardware, wiring (not the signal) now.
If the Township sees issues after the construction is complete, Penn DOT will reevaluate. If the left turn
signal is needed in the first 5 years after construction, Penn DOT will pay to install.
Light will have radar on the pole to detect the dilemma zone.
40 mph between Snyder and Schaeffer. No speed limit in the round about.
NEWLETDATEJULY2019
*Want round about maintenance agreement by end of summer 2018

Left-Turn Phasing Worksheet
MichaelBaker
INTERNATIONAL
Project:
SR 0222 - 022
Date:
5/6/2015
SR 222
and
Intersection:
SR 73
Time Period:
2018OPENINGYEAR
County
Berks
Municipality:
Maidencreek Township
Computed by
Checked by
ADJ
JLD
Assumed Cycle Length
110
Left Turn
Opposing
Number of
Conflict Factor
Phasing
Direction
Traffic
Number Per
Opposing
(CF)
Time
Volume
Criteria Met
Volume
Cycle
Lanes
Westbound to
124
3.79
305
AM
No
37,820
76%
Southbound
PM
99
3.03
307
30,393
No
61%
AM
33
1.01
1012
No
51%
Southbound to
33,396
Eastbound
PM
39
1.19
1132
No
44,148
68%
No
2.26
Eastbound to
AM
74
273
20,202
40%
Northbound
PM
99
3.03
280
No
27,720
55%
AM
29
0.89
962
43%
27,898
Northbound to
No
13
0.40
No
PM
1070
13,910
21%
Westbound
Phasing Criteria
(Twoturnspercycleminimum)
One Opposing Lane
Two Opposing Lanes
Protected/Permitted
CF = 35,000
CF = 45,000
WithoutSeparateLane
Protected/PermittedWith
CF=50,000
CF = 65,000
Separate Lane
Protected/Prohibited
CF = 67,500
CF = 90,000
WithSeparateLane
Comments:Opening Year2018Traffic Volumes do not justify a protected phase.