PROJ: SR 222 ROAD PROJECT MUNI: MAIDENCREEK TOWNSHIP FILE: 15-0466-0270 DATE: 6/10/2015 SANITARY SEWER THAT MUST BE RELOCATED AS IT COSTS IS IMPACTED BY PROJECT EXHIBIT D AREA $ 965,000.00 AREA IN AND NEAR TURNABOUT EXHIBIT A DESIGN, PERMITTING & CONSTRUCTION $ 310,000.00 AREA AT AND NEAR BRIDGE CONSTRUCTION SANITARY SEWER SYSTEM THAT MAY BE CONSIDERED AS IT SLIGHTLY IMPACTED BY THE PROJECT AREA COSTS AREA NEAR REDNER'S EXHIBIT C DESIGN, PERMITTING & CONSTRUCTION $ 745,000.00 WATER SYSTEM THAT MUST BE RELOCATED AS IT COSTS IMPACTED BY THE PROJECT AREA AREA NEAR TURNABOUT EXHIBIT D DESIGN, PERMITTING & CONSTRUCTION $ 795,000.00 AREA ALONG SR 73 EXHIBIT B DESIGN, PERMITTING & CONSTRUCTION $ 475,000.00 WATER SYSTEM THAT MAY BE CONSIDERED AS IT COSTS SLIGHTLY IMPACTED BY THE PROJECT AREA AREA BETWEEN SR 73 AND TURNABOUT EXHIBITS C & D DESIGN, PERMITTING & CONSTRUCTION $ 530,000.00 AREA ALONG SR 73 - OUTSIDE PENN DOT LIMIT EXHIBIT B DESIGN, PERMITTING & CONSTRUCTION $ 610,000.00 AREA ALONG SR 222 - REDNER'S MINI-MARKET EXHIBIT C DESIGN, PERMITTING & CONSTRUCTION $ 310,000.00 TOTAL $ 4,740,000.00 MTA 100% TOTAL $ 2,195,000.00 MTA AND PENN DOT TOTAL $ 2,545,000.00 MTA 50% TOTAL $ 1,272,500.00 MTA TOTAL COSTS $ 3,467,500.00