Planning Commission
Correspondence — August 4, 2015
- Date
- August 4, 2015
- Type
- Correspondence
- Year
- 2015
- File
- PDF · 4.1 MB
Document text
Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 1,210 words
PHONE:(610)375-8822 GREATVALLEY CONSULTANTS 1-800-733-4821 FAX:(610)375-8977 75COMMERCEDRIVEWYOMISSING,PA19610-3323 August 4, 2015 Maidencreek Township Planning Commission P. O.Box 319 Blandon,PA 19510 Attention: Diane Hollenbach, Township Manager Re: CellcoPartnershipd/b/aVerizonWireless ReadingEvansville CellTower Preliminary/Final Land Development GVC FileNo,4026-007 Dear Planning Commissioners: We received for review a Preliminary/Final Land Development Plans titled, "Cellco Partnership d/b/a Verizon Wireless, Reading Evansville" submitted by Maser Consulting P.A. The Plans propose the construction of a cell tower located along Buena Vista Road on property owned by C & D Zwicky, LLC.These Plans were reviewed as a Preliminary/Final Plan, although the Board of Supervisors would have to grant a waiver to allow the developer to proceed in that fashion. Please note comments in bold typeface require action by or consideration of the Planning Commission or Board of Supervisors. The remaining comments should be addressed by the applicant or his consultant, directly with Township staff or our office.. The Plan was reviewed for conformity with Township Ordinances and Standards as well as accepted engineering practice. We offer the following comments for your consideration: SUBMISSION INFORMATION 1. Preliminary/Final Land Development Plan titled *Cellco Partnership d/b/a Verizon Wireless, Reading Evansville", prepared by Maser Consulting P.A., consisting of twelve (12) plan sheets as listed: Date Plan No. Description Originated Revised T-1 6/11/15 6/23/15 Title Sheet LD-1 6/11/15 6/23/15 Zoning Information LD-2 6/11/15 6/23/15 Site Plan LD-3 6/23/15 6/11/15 Partial Site Plan LD-4 6/11/15 6/23/15 Compound Layout and Elevation View LD-5 6/11/15 6/23/15 Soil Erosionand SedimentControl Planl LD-6 6/11/15 6/23/15 Soil Erosionand Sediment Control Plan2 A-1 6/11/15 6/23/15 ConstructionDetails1 A-2 6/11/15 6/23/15 Construction Details-2 A3 6/11/15 6/23/15 ConstructionDetails ---3 A-4 6/11/15 6/23/15 Construction Details--4 A-5 6/11/15 6/23/15 Construction Details-5 EngineersArchitects Planners ConsultantsSurveyors printed on recycled paper GREAT TVALLEY CONSULTANTS Maidencreek Township August 4, 2015 Planning Commission 2. Application for review of a Preliminary Plan dated July 7, 2015. 3. Application for review of a Final Plan dated July 7, 2015 4. A decision by the Zoning Hearing Board of Maidencreek Township dated May 27, 2015. 5. A letter from Fitzpatrick Lentz & Bubba, Attorneys at Law, dated July 7, 2015 requesting waivers of various provisions of the Stormwater Management Ordinance and the Subdivision and Land Development Ordinance. ZONING ORDINANCE (CODE OF THE TOWNSHIP OF MAIDENCREEK, CHAPTER 220) 1. The decision of the Zoning Hearing Board of the Maidencreek Township dated May 27, 2015 granted a variance to Cellco Partnership d/b/a Verizon Wireless for the construction of a cell tower and associated facilities on property located at 220 Buena Vista Road. 2. A zoning map is included on drawing map LD-1 and the map is printed in black and white, with varying shades of gray. As a result, the identification of one zoning district over another is difficult to read. A zoning map which clearly identifies the R-1 low density residential zone and any adjacent zoning districts should be provided. SUBDIVISION AND LAND DEVELOPMENT ORDINANCE (CODE OF THE TOWNSHIP OF MAIDENCREEK, CHAPTER 190) 1. Sections 190-15E, (L), & (M). "To the extent necessary, Applicant requests waivers from showing all streets, roads, etc. within 1,000 feet of the property; all sewer lines, water lines, and other required items within i00 feet of the property; and all tree masses on the property. The property is over 113 acres in size with the tower site only occupying a 2,500 sF portion of the property. Depicting features off-site should not be necessary since the proposed improvements are accurately depicted. Moreover, all existing features within the area of development are shown on the plan." This waiver request is appropriate for this application. 2. ..... Section 190-17(2). “A waiver from performing a full boundary survey is requested. The area of development has been field surveyed. Given the +/-113 acre size of the property and the fact that the fenced compound is only 2,500 SF in size, a waiver is appropriate. This waiver request is appropriate for this application. 3. GREAT V/ALLEY CONSULTANTS Maidencreek Township August 4, 2015 Planning Commission preliminary/final plan filing. A waiver is appropriate given the minimal amount of land disturbance that is proposed. Moreover, the plan accurately depicts the proposed improvements." This waiver request is appropriate for this application. sj5/ns DE Sidewalkinstcllation 4. preliminary/final plan filing: -A waiver is appropriate given the minimal amount of land disturbanee that is proposed. Moreover, the plan accurately depicts the proposed improvements.2? This waiver request is appropriate for this application. 5. Section 190-38. "A waiver is requested from having to provide a sanitary sewer disposal system as the facility is unmanned and no sanitary system is proposed or required." This waiver request is appropriate for this application. 6. Section 190-40. A waiver is requested from having to provide a water supply system as the facility is unmanned and no water system is proposed or necessary." This waiver request is appropriate for this application. 7. Section 190-42. “"A waiver is requested from having to provide stormwater drainage as the facility is so small and will generate a de minimis amount of run-off will be generated such that drainage structures are not necessary as the area of disturbance is only +/-7,950 SF" This waiver request is appropriate for this application. MAIDENCREEK, CHAPTER 182) 1. Section 182-13. "A waiver is requested from designing infiltration stormwater management facilities which provide on-site ground water recharge. The proposed installation will be located within a 50' x 50' fenced compound. The total area of disturbance is only +/-7,950 SF. The proposal is going to generate a de minimis amount of runoff and thus, infiltration and ground water recharge should not be required." This waiver request is appropriate for this application. 2. Section 182-14. “A waiver is requested from providing storage and treatment facilities for stormwater runoff. The area of disturbance is so small and will generate a de minimis amount of runoff that this requirement should be waived." CC GREAT V/ALLEY CONSULTANTS Maidencreek Township August 4, 2015 Planning Commission This waiver request is appropriate for this application. 3. Section 182-15. "A waiver is requested from the stream bank erosion requirements. The area of disturbance will generate such a de minimis amount of runoff that a BMP to detain stormwater runoff downstream should not be required. Accordingly, a waiver is appropriate." This waiver request is appropriate for this application. 4. Section 182-22. “Applicant requests a waiver from having to provide a Drainage Plan. A waiver is appropriate given the de minimis amount of run-off to be generated by the limited area of disturbance. A Soil Erosion and Sediment Control Plan is provided and the required notes are included." This waiver request is appropriate for this application. GENERAL COMMENTS 1. A planting screen is proposed around the fenced area surrounding an equipment shelter, stand-by generator, proposed monopole, and other associated equipment. 'The planting screen is proposed of 6' (six foot) planting height American arborvitae on 5' (five foot) centers. The Planning Commission may desire to comment on the planting screen. 2. Additional comments may result from any revisions to the plans currently under review. Please do not hesitate to call our office with any questions regarding the above review. Sincerely, CHARLES M. JONES, P.E., PLS Project Manager CMJ:lam cc: Maidencreek Township Board of Supervisors Eugene Orlando, Esquire Cellco Partnership d/b/a Verizon Wireless Maser Consulting P.A. Catherine E. N. Durso, Fitzpatrick Lentz & Bubba, P.C.