Other Township Records

Road Crew Report — March 4, 2016

Date
March 4, 2016
Type
Report
Year
2016
File
PDF · 211 KB

Download original Open in browser

Document text

Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 228 words

Road Crew Report March 2016

February 8-12, 2016

 Replace delinators
 Grease all trucks and equipment, maintenance on #4, #3
 Replace ceiling tiles in office
 Repair sign at Community Park
 Salting Feb 9 -10 – 11
 Change fuel filter on diesel tank
 Fix tire chains

February 15-19, 2016

 Weld #6 plow
 Pushed back drifts
 Salt roads, emptied trucks, washed
 Set up new ladder
 Install led back up lights truck #2,3,6
 Repair #6 spreader
 Take scrap metal to Pollock
 Set light pole and install street light on Golden
 Cut tree down at lower park entrance
 Sign inventory

February 22-26, 2016

 Asphalt recycling, patch manhole, water boxes
 Put cabinet together for concession closet
 Install radios in backhoe and #8
 Sign inventory

February 29-March 4, 2016

 Patch hole on W Shore
 Patch Ridge Road
 Pick up trash in parks
 Remove headwall on Hill Rd
 Replace curb stop in Community Park
 Replace photocell on Walnut Tree Dr light
 Fix conduit on streetlight on Eagle Dr
 Dig out crushed storm water on Hill Road, repair
 Reviewed Community Park stream work, W Walnut Tree Dr storm water with Engineer
 Salt

Upcoming projects:

 Stream Maintenance in Community Park
 W Shore Drive Brisge Repair

Archived from the Maidencreek Township website. Reproduced unaltered; not an official records repository.