Board of Supervisors
Agenda — May 12, 2016
- Date
- May 12, 2016
- Type
- Agenda
- Year
- 2016
- File
- PDF · 882 KB
Document text
Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 620 words
MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS MAY12,2016 ENGINEER'SAGENDA SubdivisionReviewStatusChecklist Next Supervisors Meeting June9,2016. Noplanscurrentlyunderreview Subdivision/Zoning/LDP Conditional Use Application forAssisted Living Homeat384 EvansvilleRd.- Hearing held onApril 14; BOS decision rendered on April 28. Projects Stormwater Projects Walnut Manor Tree Dr.-video of pipe completed, see attached plan. Ina/Rt.73-Lindbergh/Adele-onhold. 2016StreetPaving.LiquidFuel Budget $266,370.00 Lee Spring Rd.& portion of Evansville Rd.advertised to receive & open bids on May18 at11:00am; presents bids toBOSon June9. EvansvilleRd. SubdivisionImprovementLOC/Escrow Release SewageEnforcement OfficerActivityReport I:\Projects\MaidencreekTownship|16-0019-0100\Engineer'sAgendal5.12.16.docx MarkKitzmiller From: MarkKitzmiller Sent: Wednesday,April20,20164:17PM To: maidentwp@gmail.com Cc: TomUngerPamelaStevens Subject: WalnutManorStormSewerTV Attachments: walnut manorTV results reduced.pdf Diane: Today's TV project revealed three major issues (I understand Randydropped off a disk-Ihave the files, too): 1. On the pipe where the Township recently repaired the sinkhole, the "bad" part of the pipe is about 6o feet long. It is OK downstream of the sinkhole. This could be replaced relatively easily (as compared with going down W. Walnut Tree Dr. with pipe). 2. The pipe between Lots 73 and 74 is crushed (near intersection with Regent), in the lawn about 60 feet from the curb. Just at one single location - not sure of the cause. 3. The pipe that leads downstream to the endwall is up to half full of silt, mud, gravel, etc., causing backups in the lines, and should be jetted & vacuumed, and cleaned out at the outfall. Following is a detailed summary of the results (please see attached plan for a cross-reference). Items in red are critical: CB#1 to CB#2: 1.15"CMP and is clear (minor gravel debris). CB#2toMH#4: 2.At CB#2,pipestarts out as a 15"CMP then transitionstoa 15"HDPEat 20 feet from CB#2. 3. About 53 feet from CB#2, the 15" HDPE is crushed in from the sides; possible tree roots. Capacity is impeded to about 20%. 4.About 48 feet from MH#4, 5"HDPE and has a protruding rain leader connection that extends about 1/3 into the 15" pipe. Camera could not pass this location; however, pipe looks good as far as can be seen beyond this point (i.e.,probably OK to the crush point above). CB#toMH#4: 5. Starting at CB#3, 15" HDPE and has slight to moderate sags but joints appear intact and generally clear to about 310 feet (loose, but heavy debris at about 12 feet from CB#3). 6.About 220feet fromCB#3, the 15"HDPE has a substantial sag.Joints appear to be intact. 7. About 310 feet from CB#3 (downstream toward MH#4), the 15" HDPE is broken and bend downward. Pipe break prohibits continuing from this direction. 8. Starting from other end, MH#4, pipe is an 18" HDPE with slight to moderate sags, but joints appear intact and pipe is clear to about 260 feet. 9. About 260 feet from MH#4 (upstream toward CB#3) the 18" HDPE is broken and bent downward. Pipe break prohibits continuing from this direction. This means there is about 6o feet of "bad pipe", and it occurs in the same area where a sinkhole had been repaired. MH#4toOutletEndwall: 10.StartingatMH#4movingdownstreamtowardtheoutletendwall,pipeisa24"CMPthatappearstohaveagood alignmenttoabout125feet. 11. About 125 feet from MH#4 (downstream toward outlet endwall), pipe is severely blocked (up to half the pipe) by debris (mud, silt, sediment, gravel, etc.). Access to this pipe from the outlet endwall was impossible without cleaning. Mark A. Kitzmiller SYSTEMSDESIGN SDE ENGINEERINGINC 1032JamesDrive,Leesport,PA19533 Phone:610.916.85001Cell:570.689.1007 Web:www.sdei.netIEmail:m.kitzmiller@sdei.net Confidentiality Notice:The information transmittedis intended onlyforthe person or entitytowhom orwhich it is addressed andmay contain confidential and/orprivilegedmaterial.Any review,retransmission,dissemination,orotheruse of this information projects/maidencreek/16-0019-0300/seoactivity Chk # Billed/Paid to Date By Fee Paid Applicant $168.00 Mo asked if SEO could attend the court Township regarding SEO declined. Applicant/Activity MAIDENCREEKTOWNSHIP Mo Farvardine and SEOACTIVITYREPORT Inecessary to obtain planning approval. 4/1/16-4/30/16 date for his divorce to clarify planning module status. Communications with Robin Nagle; sandmound. transaction. Mark K. Z187417 App. # 16-0019-0471 16-0019-0300 16-0019-0300 SDE# T. Unger 2 copies 4/5/2016 4/19/2016 4/29/2016 SEO Desk Date Cc: