Manager's Report
Activity in the Month of October
 Attended Police Commission meeting, Authority meeting, Planning Commission
meeting, Board of Supervisors meeting, Berks County Association of Township Officials
convention, Berks County Cooperative Purchasing Council meeting, Secretaries
Association program on the County Assessment and Tax Claim office, MS4 meeting and
meeting with Shaffer Technologies on document management.
Permit applications, bills, deposits and bank reconciliations were handled in a timely
manner.
Renewed notary
Preparation of 2017 Budget.
Follow up letters for Authority easements on Rt 222 project.
Finished work on calendar.
Attended Fire Company Safe Halloween event
Projects for November:
MS4 permit application
Confirm snow plow relief drivers, get plows ready, salt and cinders
Reorganization preparation

317 Sola Biv
Mon, 17 Oct 2016 10:53:16 -0700 (PDT)
MIME-Version: 1.0
Received:by10.64.90.36withHTTP; Mon,17Oct 201610:52:36-0700 (PDT)
From: Diane Hollenbach <maidentwp@gmail.com>
Date:Mon,17Oct201613:52:36-0400
Message-ID:<CAGUVkPhB_hLwZXfvy3Tv4xQZQSLthNDAQ1A3HsMsO-h_bmSJYA@mail.gmail.com>
Subject:Melrose Place
To: kelly.grube@berkscd.com, eric.hout@berkscd.com
Content-Type: multipart/alternative; boundary=001a114f37a62545dd053f134024
[Quoted text hidden]
EricHout<Eric.Hout@berkscd.com>
Mon,Oct 17,2016at 2:38PM
To: Diane Hollenbach <maidentwp@gmail.com>
Hi Diane,
Vicky may be referring to the attached inspection report. A copy should have been provided to Maidencreek
Township (if not, I apologize), but a copy was not provided to the Board of Supervisors. Otherwise, to my knowledge,
no other report has been provided to the Township or Board of Supervisors pertaining to the NPDES permit for
Melrose Place. In summary, Vicky had contacted us at the end of July/beginning of August to note a possible lack of
topsoil on her property.When the conservation district investigated, we took soil probings of Vicky's property, as well
as the properties of her two neighbors, and noted that these three lots did not have amended soils installed as noted
in the approved PcSM plan. After the inspection, I wrote the attached report, and reached out to the Dept. of
best way to rectify this situation. As of our most recent correspondence with the consulting engineer a couple of
weeks ago, it sounds as though a corrective action plan for the NPDEs permit maybe in theworks to account for the
runoff volume that would have gonetothe amended soils on the recently constructed lots.A meeting with the
individuals I've mentioned previously may or may not yet happen, depending on whether the corrective action plan
will beadequatetoaddresstheamendedsoilsissues.
Vicky has reached out tome several times.It sounds as though hermain concerns have not beenwith the lack of
amended soils, but instead lie with the grading of her property and the way the water drains onto her property. She
would like to see her property regarded to drain toward the swale in the back of her lot. The swale and its associated
berm fall outside the NPDES permit boundary for this lot, so it is not likely the grading to the swale can be changed.
Does this answer your questions? Feel free to reach out to me by email or phone if you'd like to discuss further.
Thanks.
Eric
Eric Hout
Urban Resource Conservationist
Berks County Conservation District
1238CountyWelfare Road/Suite200/Leesport, PA19533
610-372-4657ext:205/Fax:610-478-7058

3150-FM-BWEW0092ReV.1/2016
COMMONWEALTHOFPENNSYLVANIA
pennsylvania
DEPARTMENTOFENVIRONMENTALPROTECTION
BUREAUOFWATERWAYSENGINEERINGANDWETLANDS
DEPARTMENT OF ENVIRONMENTAL
PROTECTION
Permit No. PAG02 0006 14 036
Report No. 16-3
EARTHDISTURBANCEINSPECTIONREPORT
Project Name Melrose Place
Inspection Date 8/2/2016
Inspection Time 1:00 PM
WeatherConditions Partly cloudy
Total Project Area 21.80
Location Northside of East Park Road
Total Disturbed Area 7.2
Municipality Maidencreek Township
County Berks
Receiving Water(s) Willow Creek
Designated/Existing Use CWE,MF
Responsible Party(s) Marco Folino / Rodolfo Folino & Sons
(name & address)
68SouthHamptonDrive
Wyomissing Hills,PA 19610
Phone (610)780-5517
Site Representative (name)
Inspector (name) Eric Hout
(title)
(title)
Urban Resource Conservationist
Photographs Taken Yes 
Type of Inspection (check only one)
No
Follow-up 
Complaint 
Routine complete
Routine partial 
Final 
SiteDescription&Observations
1) Arrived on site in response to a complaint regarding the potential lack of soil amendments on recently constructed lots.
Attending: Eric Hout / Michael Pedrick of the BCCD, and the owners of lots 47 and 48.
2) Lots completed include: 15, 16, 19, 23, 34, 35, 46, 47, 48.
3) Lots currently with active earth disturbance activities include: 17, 18, 20, 21, 22, 49.
5) Per the approved PCSM plan, compost soil amendments are to be placed on lots 3, 15-26, 28, 30-31, 34-36, 38, 40-41,
and 47-49. The PcsM details call for the soil amendments to consist of 2-3 inches of approved compost placed on
existing soil, with an additional overlaying of 6 inches of approved compost/soil mixture. The compost shall be approved
by a licensed professional required to be on site during placement of the amended soil.
Permit and Plan Requirements
Type of Activity (check as many as appropriate)
Other
Pub. Road Constr./Maint. (PRC)
WrittenErosion&SedimentPlanrequired
Pvt. Road/Residence (PRRS)
Written Post Construction Stormwater Management
Res. Subdivision (RSBD)
Comm./Indust. Dev. (CMIN)
Plan required
Erosion & Sediment Plan requested
Govmt. Facilities (GOV)
Recreation Facilities (RECF)
Utilities Facilities (UTL)
Post Construction Stormwater Management Plan
Agricul. Activities (AGA)
requested
ESCGPPermit required
Sewer/Water Systems (SWS)
E&SPermit required
Pipeline (PL)
NPDES Permit required
Remediation/Restoration(RRES)
Silviculture (SILV)
 Phased Constr.
 Non-Phased Constr.
Permit#:PAG02000614036
Exp. Date: 8/7/19
CC: Tom Unger/Systems Design Engineering, Maidencreek Township, File
Page 1 of 4
Yellow -ResponsibleParty
White -Inspector
Pink -Department
Goldenrod - Other

3150-FM-BWEW0092Rev.1/2016
COMMONWEALTHOFPENNSYLVANIA
pennsylvania
DEPARTMENTOFENVIRONMENTALPROTECTION
BUREAUOFWATERWAYSENGINEERINGANDWETLANDS
DEPARTMENTOFENVIRONMENTAL
PROTECTION
Permit No.PAG02000614036
Report No. 16-3
EARTHDISTURBANCEINSPECTIONREPORT
Project Name Melrose Place
Inspection Date 8/2/2016
Inspection Time 1:00 PM
Continuation Sheet
Site Description &Observations
6) Soil probes were taken on lots 46, 47, and 48. Probing samples show 1-4 inches of topsoil. No soil amendments
appeared to be present in the samples. (n, u)
7) The permittee has not yet provided the BCCD the date and place of recording of a PCSM instrument along with a
reference to the docket, deed book, or other record within 9o days from the date of permit authorization in accordance
date of permit authorization. (p, u)
8) Per homeowners on site, elevations shown on the approved PcsM plans do not appear to match actual site conditions
on lots 47-49. Homeowners have stated they believe actual elevations are higher than what is shown on approved plans.
Compliance Assistance Measures
1) Per permit condition 14b, record an instrument with the Berks County Recorder of Deeds to assure disclosure of PcsM
County Conservation District within 30 days.
within 30 days.
3) Per permit condition 14g, upon the sale or other transfer of any lot, notify the purchaser of the long-term PCSM BMP
operation and maintennance requirements, and provide notification of compliance with this request to the Berks County
Conservation District within 45 days from the date of transfer of the property and at the time the permittee files a Notice of
Termination. Within 30 days, please also provide documentation to the BCCD that the disclosure of the long-term PCSM
operation and maintennance obligations has taken place for the sale of any lots that have a PCsM BMP.
4) Provide certification statements from a licensed professional that the PcsM BMPs have been installed per plan.
5)FollowtheapprovedPCSMplansandcomplywithall NPDESpermit conditions.
Follow-up Inspectionwill occuronorabout (date)
Asnecessary
8/3/2016
(Date)
(Signature of Site Representative)
(Inspector's Signature)
(Date)
The Site Representatives' signature acknowledges that they have read the report and received a copy and that they were given an opportunity to
discuss it with the inspector. The signature does not necessarily mean the signee agrees with the report.
Page 3 of 4

3150-FM-BWEW0092
Rev.1/2016
COMMONWEALTHOFPENNSYLVANIA
pennsylvania
DEPARTMENTOFENVIRONMENTALPROTECTION
BUREAUOFWATERWAYSENGINEERINGANDWETLANDS
DEPARTMENTOFENVIRONMENTAL
PROTECTION
PermitNo.PAG02000614036
Report No. 16-3
EARTHDISTURBANCEINSPECTIONREPORT
ProjectNameMelrosePlace
InspectionDate8/2/2016
InspectionTime1:00PM
InspectionFindings
Reference
No violations observed at this time.
口(N/A)
Failure to develop a written Erosion and Sediment (E&S) Plan.
a.
(102.4)
Failuretohave an E&SPlan availableonsite.
b.
 (102.4)
Failureto submit anE&SPlanas requested.
C.
(102.4)
Failure to implement effective E&S Best Management Practices (BMPs).
d.
 (102.4)
Failureto maintain effectiveE&SBMPs.
e.
 (102.4)
Failure to use Antidegradation Best Available Combination of Technologies (ABACT) BMPs
口(102.4)
for discharges to High Quality or Exceptional Value Waters.
Failure to obtain an NPDES Permit for Stormwater Discharges Associated with Construction
(102.5)
g.
Activities.
h.
Failureto obtainan E&SPermit.
(102.5)
Failure to prepare and implement a Preparedness,Prevention, and Contingency (PPC)Plan.
(102.5)
Failure to submit a Notice of Termination (NOT).
(102.7)
Failure to develop a written Post Construction Stormwater Management (PCSM)
k.
(102.8)
Plan/RestorationPlan.
Failure to havePCSMPlan/Restoration Plan available onsite.
(102.8)
Failureto submit PCSM Plan/RestorationPlan as requested.
m.
(102.8)
Failure to implement effective PCSM BMPs.
n.
(102.8)
FailuretomaintaineffectivePCSMBMPs.
0.
(102.8)
Failure to perform reporting and recordkeeping as required.
 (102.8)
p.
Failureto implementriparianbuffer orriparianforestbuffer.
q.
(102.14)
Failure to meet regulatory requirements for riparian forest buffer.
..
(102.14)
Failure to provide temporary stabilization of the earth disturbance site.
S.
(102.22)
t.
Failure to provide permanent stabilization of the earth disturbance site.
(102.22)
Failure to comply with permit conditions.
u.
μ (402 CSL)
Sediment or other pollutant was discharged into waters of the Commonwealth.
V.
(401 CSL)
SiteconditionspresentapotentialforpollutiontowatersoftheCommonwealth.
w.
μ (402 CSL)
Failure to comply with a Department Order.
X.
 (402,611 CSL)
y.
(102.8)
Failure to conduct a preconstruction meeting.
(102.5)
z.
aa. Failure to provide proof of consultation with the Pennsylvania Natural Heritage Program
(102.6)
regarding the presence of a State or Federal threatened or endangered species on a project
site requiring a Chapter 102 permit.
bb. Failure to withhold a building or other permit or approval from those proposing or conducting
(102.43)
earth disturbance activities, which require a Department permit, until the Department or
conservation district has approved/acknowledged the Chapter 102 permit.
Inspectionof thisprojecthasrevealed site conditionswhich constituteviolationsof25Pa.CodeChapters92a
and/or 102 and the Clean Streams Law, the act of June 22, 1937, P.L. 1987, 35 P.S. $691.1 et seq.
Additional informationregarding theseviolations canbefound onthebackof thispage.
Page 2 of 4
Yellow-Responsible Party
Pink -Department
White-Inspector
Goldenrod - Other

3150-FM-BWEW0092
Rev.1/2016
Pink -Department
Yellow-ResponsibleParty
White-Inspector
Goldenrod-Other
conducted an inspection of your earth disturbance activity to determine compliance with Title 25, Chapter
92a, National Pollutant Discharge Elimination System, Title 25, Chapter 102, Erosion and Sediment Control,
and the Pennsylvania Clean Streams Law. This representative may be an employee of the local County
Conservation District, which by delegation agreement with the Department of Environmental Protection, is
authorized to investigate complaints,inspect earth disturbance activities and conduct compliance actions.
Any violations observed by the Department/Conservation District have been noted on this report form and
constitute unlawful conduct as defined in Section 611 of the Clean Streams Law.
There will be no written confirmation of those violations from the Department.Failure to take corrective
actions to resolve the violations may result in administrative, civil and/or criminal penalties being instituted by
the Department of Environmental Protection as defined in Section 6o2 of the Clean Streams Law of
Pennsylvania. The Clean Streams Law provides for up to $10,000 per day in civil penalties, up to $10,000 in
summary criminal penalties, and up to $25,00o in misdemeanor criminal penalties for each violation.
This report does not constitute an Order or appealable action of the Department. Nothing contained herein
shall be deemed to grant or imply immunity from legal action for any violation noted herein.
Forfurtherinformationorassistancepleasecontact:
Eric Hout
Urban Resource Conservationist
BerksCountyConservationDistrict
Phone:610-372-4657extension205
2016/08/02-13:1
ENGINEER
FIELDBOOK
Photoaboveshowsatypical soilprobetakenonsite.