MAIDENCREEKTWP.PLANNINGCOMMISSION
P.O.BOX 319,BLANDON, PA 19510
October 6, 2016
Maidencreek Township
Maidencreek Township
Board of Supervisors
Zoning Hearing Board
PO Box 319
PO Box 319
Blandon, PA 19510
Blandon, PA 19510
Gentlemen,
The Maidencreek Township Planning Commission reviewed the Cellco Partnership
conditional use and variance application at their meeting on October 5th. The Commission
recommends the granting of the conditional use subject to the requested zoning relief being
granted and satisfaction of the items brought forth in the Great Valley Consultants review letter
dated September 30, 2016, which is attached. The Commission also had no objection to the
additional variance is needed to Zoning section 220-48A.(16) to allow more than one tower on a
site. They had no objection to this variance if requested.
Sincerely,
dhelmach
Diane Hollenbach
Manager
Maidencreek Township
CC:
Kate Durso, Fitzpatrick, Lentz & Bubba P.C.
Eugene Orlando, Orlando Law Office
Joan London, Kozloff Stoudt P.C.
Thomas Unger, Systems Design Engineering, Inc.

PHONE:(610)375-8822
GREATVALLEY CONSULTANTS
1-800-733-4821
FAX:(610) 375-8977
75COMMERCEDR/VEWYOMISSING,PA19610-3323
September 30, 2016
Diane Hollenbach, Township Manager
Maidencreek Township
P. O. Box 319
Blandon, PA 19510
Re:
Cellco Partnership d/b/a Verizon Wireless
1 Quarry Road Cell Tower
Conditional Use and Variances Request
GVC File No. 4026-008
Dear Mrs. Hollenbach:
We received for review Plans from Cellco Partnership d/b/a Verizon Wireless titled, "RDG
Blandon" submitted by Maser Consulting P.A. The Plans propose the construction of a wireless
communications facility/tower on the Maidencreek Township property located at 1 Quarry Road.
The location of monopole and related improvements is along the south end of the existing
Township building.
These Plans were reviewed per the Applicant's request for conditional use approval per the
Zoning Ordinance Section 220-48, and for variances from the setback and landscape
requirements of Section 220-48(6) and 220-48(16). Please note comments in bold typeface
require action by or consideration from the Planning Commission and/or the Board of
Supervisors. The remaining comments should be addressed by the applicant or his consultant
directly with Township staff or our office. We offer the following comments for your
consideration:
SUBMISSION INFORMATION
1.
Plans for Cellco Partnership d/b/a Verizon Wireless, titled “RDG Blandon", prepared by
Maser Consulting P.A., consisting of seven (7) plan sheets as listed:
Date
Plan No.
Description
Originated
Revised
T-1
8/26/16
Title Sheet
z-1
8/26/16
Zoning Information
Z-2
8/26/16
Compound Layout and Elevation View
Z-3
8/26/16
Partial Site Plan
A-1
8/26/16
Construction Details
A-2
8/26/16
Construction Details
A-3
8/26/16
Construction Details
2.
Copy of the letter from Fitzpatrick Lentz & Bubba, P.C. dated September 1, 2016 to
Maidencreek Township for the Zoning Hearing Board regarding the conditional use and
variance requests.
3.
Copy of the Supplemental Statement submitted with the September 1, 2016 letter.
→ Planners → Consultants
Engineers
Architects
surveyors
printed on recycled paper

GREAT V/ALLEY CONSULTANTS
Maidencreek Township
September 30, 2016
Planning Commission
4.
Copy of the Zoning Hearing Board Notice of Appeal dated September 1, 2016.
ZONING ORDINANCE (CODE OF THE TOWNSHIP OF MAIDENCREEK,
CHAPTER 220)
1.
The communications tower, and associated facilities, is a use permitted by conditional
use in the Industrial Zoning District. (Section 220-48.A)
2.
The Supplemental Statement affirms the tower will be designed and constructed in
accordance with the industry's structural design standards as certified by the registered
professional engineer whom sealed the Plans. However, a similar note must be added to
the Plans to certify the communication tower's structural capacity and overall safety.
(Section 220-48.A(4)
3.
Sheet Z-3 indicates a fence seven feet (7') in height will surround the communications
tower and associated facilities. The fence must be eight feet (8') in height. (Section 220-
48.A(5))
4.
Landscaping is not proposed to screen the ground-level support structures including
the fence. The location of the tower and support structures utilize the south end of
the existing Township building so landscaping would not be necessary at that
location. Also, the existing communications tower on the property does not have a
landscaping screen surrounding the perimeter fence currently.
The applicant has requested a variance of the landscape screen of Section 220-
48.A(6).
5.
The Supplemental Statement indicates that the design of the tower includes collocation
accommodations. It is recommended the Applicant formally acknowledges on the plan
that space for Township communication systems shall be made available at no cost to the
Township. (Section 220-48.A(9)
6.
The tower is only forty-two feet (42') from the southern property line. The setback
requirement of the tower from all property lines and existing street right-of-way
lines shall be no less than the height of the tower which is one hundred thirty feet
(130'). The tower is in compliance with the setback at all other property lines and
existing street right-of-way. The proposed setback of this new pole is eight feet (8)
further from the southern property line than the existing communications tower.
Also included in the setback requirement is the statement of no more than one tower
shall be permitted on a site. Provided a communications tower is aiready located on
this site, a variance would be necessary for this requirement as well.

GREAT VALLEY CONSULTANTS
Maidencreek Township
September 30, 2016
Planning Commission
The applicant has requested a yariance of the setback no less than the height of the
tower of Section 220-48.A(16), but must also include in the variance request a
second tower be permitted on the site.
7.
The Plans must also be prepared in accordance with all applicable sections of the
Subdivision and Land Development Ordinance. (Section 220-48.A(18)
8.
The existing easement along the access drive is fifteen feet (15') in width. This easement
shall be a minimum of twenty feet (20') in width. (Section 220-48.A(20)
GENERAL COMMENTS
1.
The Plans do not indicate whether the communications tower will be setback no less than
the height of the tower, specifically one hundred thirty feet (130'), from the existing
Redner building. We recommend that this measurement is shown on the plan and the
setback is satisfied.
Also, the Planning Commission should note that if the communications tower satisfies
the one hundred thirty feet (130') setback from the Redner facility building, it would
appear that this setback would extend beyond the side yard setback of the Redner
Development Company at this property line. The proposed tower setback may impact
future development on the Redner Development Company property. We recommend the
Planning Commission Solicitor review this concern.
2.
There is a "Gravel Driveway Surfacing" detail on Sheet A-3. It appears the only
driveway needed for the proposed tower and facilities will be the paved driveway that
services the existing tower. If so, then the gravel driveway detail is unnecessary and can
be removed. If not, the detail shall clarify the location on the Plans the detail is
applicable.
Please do not hesitate to call our office with any questions regarding the above review.
Sincerely,
SCOTT@. ANDERSON
Project Manager
SCA:bjc
cc:
Maidencreek Township Board of Supervisors
Eugene Orlando, Esquire
Cellco Partnership d/b/a Verizon Wireless
Maser Consulting P.A.
Catherine E. N. Durso, Fitzpatrick Lentz & Bubba, P.C.