Patrick Donovan
Maidencreek Township Authority
1 Quarry Road
Blandon, PA 19510
Re:
2015 Annual Wasteload Management (Chapter 94) Report
Maidencreek Township STP
NPDES Permit No. PA0070271
Maidencreek Township, Berks County
Dear Mr. Donovan:
The Department of Environmental Protection (DEP) has completed its review of additional
information furnished by your consultant on October 12, 2016 in regards to the July 2015
organic overload at your treatment plant.
In consideration of the clarification regarding the cleaning at the James Hardie Plant, the
Department is rescinding its letter dated September 13, 2016 that requested a Corrective Action
Plan (CAP).
DEP appreciates your cooperation in meeting the Chapter 94 reporting requirements.
If you have any questions concerning this notice, please Aaron Baar at (717) 705-4791 or by
email at abaar@pa.gov.
Sincerely,
Timothy K. Wagner
Environmental Group Manager
Clean Water Program
cc:
Ontelaunee Township Municipal Authority
RECEVED
Systems Design Engineering, Inc.
OCT 2 1 2016
Systems Design Engineering
Southcentral RegionalOffice
909ElmertonAvenue|Harrisburg,PA 17110-8200|717.705.4800|Fax717.705.4760
www.dep.pa.gov

SYSTEMS DESIGN
SDE
"A Passion for Engineering Excellence"
ENGINEERING,INC
sdei.net
October 12, 2016
Commonwealth of Pennsylvania
Department of Environmental Protection
CERTIFIEDMAIL
South Central Region
RETURNRECEIPTREQUESTED
909 Elmerton Avenue
70143490000035829432
Harrisburg, PA 17110
Attention:
Ms. Maria D. Bebenek, P.E.
Program Manager
Clean Water Program
Re:
Maidencreek Township Authority
Chapter 94 Report for 2015
Responses to PA DEP
Dear Ms. Bebenek:
On behalf of Maidencreek Township Authority (MTA), we offer the following responses to
the Department's September 13, 2016 letter concerning the review of the 2015 Chapter 94 Report.
We respectfully request the reconsideration of the requirement that MTA submit a written
corrective action plan and the restriction of new connections for the following reasons:
1. As noted in the e-mail dated March 22, 2016, the Authority Manager and the Plant
Manager identified potential sampling issues due to the influent line being extremely
flat with a slope of the minimum allowed by DEP design criteria. Grease buildup at the
flowline is known to occur. The Authority plans to increase periodic cleaning of the
influent line to eliminate the potential for an artificially inflated influent BOD sample
which does not represent the true influent waste stream characteristic.
2. During July 2015, the exact month that the high reading occurred, the Owner of the
James Hardie plant was in the process of selling their property and cleaned their
warehouse floors and walls. The wash water was discharged to the sanitary sewer
system via the floor drains. The user. contacted the Authority and permission was given
for minor discharge per day. The wash water was high in TSP and more than likely
stripped the sewer lines and additional BOD entered the plant during the several days
that the James Hardie building was cleaned. WWTP staff tested daily for Phosphorus
during this event. Phosphorus is an analysis which can be performed in house with
daily results. BODs on the other hand, is a test that is handled outside the WWTP lab
and results are not known for 2 weeks due to the nature of the test and reporting. The
high levels of BODs could not be detected in a timely manner.
3. The one month in 2016 that resulted in a one-month maximum of 1,645 lbs./day was a
result of PA DEP asking the Authority to take the Giorgio flows during February until
the WWTP at the Giorgio facility was approved by PA DEP to be placed back into
operation. The Authority worked with PADEP and Giorgio to accept their waste
stream to prevent ecological damage to the Willow Creek. The Authority staff provided
a large effort to this avail and we believe it was successful.
1032 James Drive, Leesport, PA 19533.P: 610.916.8500.F: 610.916.8501
SchuylkillHaven,PAP:570.385.5549
Boyenown,PA eP:610.369.1319

MTA 2015 Ch 94 Report
PA DEP CAP Letter Response
October 12, 2016
4.  The 2015 Chapter 94 report clearly shows that the one month of July 2015 is an extreme
outlier of the statistical average. As such, the 5 year one-month organic ratio is a better
indication of overload. Going back to 2005, there has been only one month where the
maximum one-month exceeded the organic limit of 1,834 lbs/day and the next highest
maximum was 1,497 lbs/day in 2011 (exception being the Giorgio event discussed
above). The average of the past 10 years' average monthly organic load is 735 lbs/day
and the average of the maximum monthly organic load is 1,215 lbs/day. The average of
the peaking factor for the past 10 years is 1.65. The projected one-month organic load as
reported in the 2015 Chapter 94 Report for year 2020 is 1,410 lbs/day with an average
of 770.4 1bs/day.
5. The WWTP normally runs with the outer ring offline because the organic load into the
plant is so low. The F:M ratio of the facility with all rings on line does not allow a
sludge age of normal standards. CBODs and NH, levels through this plant are normally
below detection levels and non-detect. These treatment values do not occur on an
organically overloaded plant.
From an engineering perspective the five (5) points identified above clearly explain that there are no
defects, inadequacies or other issues with the WWTP that that indicate that future BOD overloads
are imminent or even likely. In fact there is no evidence of a problem with the WWTP that suggests
that the Plant is approaching a projected overload. Rather, based upon the facts reported above it is
apparent that the high month influent BOD was due to sampling issues as well as discharges that are
not typical of the domestic waste that the WWTP receives. Accordingly, a corrective action plan or
connection restriction is overly restrictive and not warranted. Consequently, the Maidencreek
Township Authority respectfully requests that this matter be discontinued and that MTA be
permitted to continue with its normal monitoring as required by Chapter 94.
If you have any questions, please feel free to contact this office at (610) 916-8500.
Respectfully Submitted,
SYSTEMS DESIGN ENGINEERING, INC.
egoT Vigy
Gregory T. Unger, P.E.
President
Cc:
Maidencreek Township Authority
Maidencreek Township
Ontelaunee Township
Dan Becker, Esq
File: 16-0466-0222