Board of Supervisors

Resolution 14 — February 9, 2017

Date
February 9, 2017
Type
Resolution
Year
2017
File
PDF · 3.1 MB

Download original Open in browser

Document text

Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 1,061 words

Resolution # 14-Q017
ARESOLUTION OFTHEBOARD OF SUPERVISORS OFTHE
TOWNSHIP OF MAIDENCREEK, BERKS COUNTY,
PENNSYLVANIA ENTERINGINTO A MEMORANDUMOF
UNDERSTANDING WITHTHE BERKS COUNTY
CONSERVATIONDISTRICT.
WHEREAS, the Berks County Conservation District (BCCD) administers the Erosion and
Sediment Control Program for the Pennsylvania Department of Environmental Protection; and
WHEREAS, the Township desires to control accelerated erosion and to prevent sediment
pollution to the Waters of the Commonwealth from earth disturbance activities; and
WHEREAS, the Township of Maidencreek (Township) previously had a Memorandum of
Understanding with the BCCD dated December 2002, and August 9, 2012; and
WHEREAS, new Federal and State regulations require the revision of the existing Memorandum
of Understanding.
NOW, THEREFORE, be it RESOLVED by the Board of Supervisors of the TowWnship of
Maidencreek, Berks County, Pennsylvania and it is hereby resolved by the authority of the same
to enter into a Memorandum of Understanding with the Berks County Conservation District and
adopt the agreement attached as Exhibit A.
All other resolutions or parts of resolutions inconsistent with this Resolution are hereby repealed
insofar, but only insofar as the same are inconsistent herewith.
RESOLVED AND ADOPTED by the Board of Supervisors of the Township of Maidencreek,
Berks County, Pennsylvania, in lawful session duly assembled this 9th day of February, 2017.
Board of Supervisors
Maidenereek Township
Berks Coyinty, Pennsylvania
6seph E Rudderow III
Attest:
David Franke
Diane Hollenbach
Claude Beaver

EXHIBIT A

MEMORANDUMOFUNDERSTANDING
Between the
BERKSCOUNTYCONSERVATIONDISTRICT
and
Maidencreek Townshie
This Memorandum has been prepared jointly and agreed upon by each party for the following purposes:
To serve as a joint commitment by the signatory parties to control accelerated erosion and to prevent sediment
pollution to the Waters of the Commonwealth which may result from the conduct of earth disturbance activities in
maidencreekTewnshie
("Municipality").
I. In carrying out the intent of this Memorandum, the Berks County Conservation District ("District") shall:
1.
Provide the Municipality with District project application packets and promptly notify Municipality of any
changesintheplanreviewfee schedule.
2.
Receive and review all Erosion and Sedimentation Control Plans ("E&S Plan" or "Plan") for earth
disturbance activities 5,oo0 square feet or greater, which are required to be written in accordance with
Chapter 102.4 of the PA Code.
3.
Within ten (10) working days of completion of review, notify the consultant, the applicant, the
Municipality, and the municipal engineer of all E&s Plan/NPDEs Permit approvals, deficiencies, and all
determinations including all project inspection reports and valid complaint inspection reports. Providing
this information supports the Municipality with respect to Municipality's MS4 reporting requirements as
required to satisfy Minimum Control Measure #4 related to services provided under this Memorandum.
4.
Notify the consultant, the applicant, and the Municipality that a Plan submission has been returned
based on either the lack of response within the specified time period or the lack of the development of a
complete Plan in compliance with PA Department of Environmental Protection (PA DEP) Chapter 102
ErosionandSedimentControlRulesandRegulations.
5.
Upon request, provide all applicants with the PA DEP Erosion and Sediment Pollution Control Program
Manual and related forms, worksheets, checklists, etc., necessary to successfully prepare a Plan.
6.
Upon the filing of a complaint by the Municipality and/or a third party, the following will occur:
a. The District will inspect the complaint within (1o)ten calendar days of its receipt.
b. If warranted, the District will provide documentation of the associated findings. The source of the complaint
shall remain anonymous in accordance with PA DEP policy.
7.
Serve as the repository for all Plans, complaints, Earth Disturbance Inspection Reports, correspondence,
etc., within the limitations stated by PA DEP, that involve earth disturbance activities within the said
Municipality. All such information, except the complaint forms, shall be contained in a filing system
which shall be available for inspection by Municipal officials upon receipt of a formal written request.
8.
When requested by the landowner, provide technical assistance in the development of needed
AgriculturalE&S PlansandManureManagementPlans.09/7/2016
ISbs2k11)shared\ADMIN\MOUs.Agreements,Contracts\MOU's\MOUsforMunicipalities\MEMORANDUM OFUNDERSTANDING9-7-16.docx

In carrying out the intent of this Memorandum, the Municipality shall:
1.
Retain a sufficient quantity of the District's project application packets and provide such packets to all
parties for projects that require a review. The Municipality shall provide instructions to have the Plans
(residential, commercial, industrial, timber harvest, agricultural expansion construction, etc.) for earth
disturbance activities greater than or equal to 5,ooo square feet, which are required to be written in
accordance with Chapter 102.4 of the PA Code, submitted to the District for review per Chapter 102 of
the PA Code.
2.
Notify the District within (5) five days of receipt of an application for a project disturbing greater than or
equal to (1)oneacre, pursuant to Chapter102.42.
3.
Pursuant to Chapter 102.43, the Municipality shall not issue building or other permit or approval to
those proposing or conducting earth disturbance activities requiring a PA DEP permit until the PA DEP or
District has issued the E&S or individual NPDES Permit or approved coverage under the general NPDES
Permit for Stormwater Discharges Associated with Construction Activities under Chapter 102.5.
4.
Forward all questions pertaining to the preparation of Plans and applications to the District.
5.
Forward all third party complaints about ongoing earth disturbance activities to the District for its
inspection.
6.
Not issue final close-out, or grant final release of improvement/E&S escrow until the applicant has
correspondencefromtheDistrict.
7.
Forward to the District, any third party agricultural complaint relating to: nutrient pollution and sediment
pollution.
8.
The District highly recommends that the Municipality necessitate the development of written
activities and animal heavy use areas disturbing 5,oo0 square feet or greater of land, as well as
necessitate the development of Manure Management Plans, before building permits for agricultural
for all farming operations that land apply manure or agricultural process wastewater, whether they
generate the manure or import it from another operation. All farming operations that include an Animal
Concentration Area (ACA) or pasture must also have a written Manure Management Plan. In addition,
the Municipality should not issue a building permit, or other permit or approval, to those proposing to
construct a liquid or semi-solid waste storage facility unless they have a design that has been approved
andstampedbyaprofessionalengineer.
This Memorandum of Understanding shall become effective immediately.It shall be reviewed as the need
arises by either or both parties, and may be amended by mutual consent of both parties. This Memorandum of
party.
Ll-b-
By:.
DATE
Oan N debach
Attest:
FORTH
COUNX
CONSERVAJIONDISTRICT
CHAIR
DATE
ISbs2kYsharedADMIN\MOUs,Agreements,Contracts\MOU's\MOUsforMunicipalities\MEMORANDUMOFUNDERSTANDING9-7-16.docx

Archived from the Maidencreek Township website. Reproduced unaltered; not an official records repository.