Other Township Records
Road Crew Report — February 9, 2017
- Date
- February 9, 2017
- Type
- Report
- Year
- 2017
- File
- PDF · 126 KB
Document text
Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 134 words
Road Crew Report February 2017 February 1-3 • Install bollards in garage driveway • Wash trucks • Crackseal February 6-9 • Dig outfalls open at Well #3 and railroad (E Wesner Rd.), place R4 & R5 • Take down swings at Blandon Fire Co. • Install new swings, mulch • 2/9/17 – Plow snow, 2/10/17 open drifts • Wash trucks February 13-17 • Check for downed trees • Mulch Blandon Fire Co playlot • Washed trucks • Cold patch behind lake • Community Park Parking Lot – stake out, haul fill, spread stone February 20-24 • Collect trash • Continued with Community Park Parking Lot February 27-28 • Screen topsoil • Collect trash • Take laser level for repair • Continue work on C.P. Parking Lot • Haul soil to Ontelaunee Heights open space