MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS
March9,2017
ENGINEER'SAGENDA
SubdivisionReviewStatusChecklist
Next Supervisors Meeting April 9,2017.
Subdivision/Zoning/LDP
No Plans currently.
Projects
Zoning Ordinance
Zoning Ordinance & Zoning Map Final.
Hearing scheduled for Mon. March 27th @ 9a.m.
StormwaterProjects
Walnut Manor Tree Dr.-No bids anticipated; recommended rebid in Jan.2017.
Ina/Rt. 73 - Lindbergh/Adele - on hold.
WestShoreDrive
Meet with inspector for state on Tues.,Aug.23regarding Bridge Inspection.
Report.
Repairs are somewhatextensive; Twp.Involvement ispossible
Three (3) 60" dia.Pipes required as alternative to existing opening. Not
desirable due to maintenance.
Twp.tomakerepairs as schedulepermits.
Street Lighting
Investigation of light intensity ongoing; possible drone camera after leaves are
off the trees.
Ed Kopicki received FAA permit to fly drone at night.
Did a test flight over Spirit Ct.; and Ontelaunee Heights.
2017StreetProject
List of proposed streets with cost estimate, copy attached.
SubdivisionImprovementLOC/EscrowRelease
SewageEnforcementOfficerActivityReport
February Report.
Page1of1
I:\Projects\MaidencreekTownshipl17-0019-0100\Engineer'sAgenda|3.9.17.docx

SYSTEMSDESIGN
SDE
ENGINEERING,INC
Client: Maidencreek Twp.
Date:3-9-2017
ProjectNo.:17-0019-0115
Revised:
Project Name:2017AnnualRoadProject
BUDGETCONSTRUCTIONCOSTESTIMATE
Description
Units
Quantity
Unit Cost
Total.
A.
EVANSVILLEROAD-MAIDENCREEKRD.TO1St90-Deg.TURN-COLD-IN-PLACERECYCLING-2,250L.F.
Cold-in-PlaceRecycledBaseCourse,5"Depth
S.Y.
1.
5,250
8.00
42,000.00
2. E
Emulsified Asphalt (CSS-1h)
GAL
10,500
1.80
18,900.00
9.5mmSuperpaveWearingCourse,11/2"Depth
TONS
480
80.00
38,400.00
Road Coring and Mix Design
4.
L.S.
5,000.00
5,000.00
5.
Y/4"C/LandW/4"EachCartwayEdgePavementMarkings
L.f.
2,230
2,787.50
SUBTOTALOFITEMA.
$107,087.50
B.
W.WESNERROAD-MIDDLEOFS-CURVENEARSTEINERPLACETOCHESTNUTSTREET-2,7OOL.F.
Base Repair, 4" Depth (3%)
1. 
S.Y.
240
40.00
9,600.00
Milling at Inlets and Low Side Driveways
2.
S.Y.
190
8.00
1,520.00
ScratchCourse(90Ib/SYfor50%ofRoad)
TONS
75.00
13,500.00
4.
9.5mmSuperpaveWearingCourse,11/2"Depth
TONS
720
80.00
57,600.00
SUBTOTALOFITEMB.
82,220.00
C.
SPIRITCOURT-CORNERSTONETOCORNERSTONE-2,34OL.F.
Base Repair, 4"Depth (5%)
S.Y.
1. 
400
40.00
12,000.00
2.
Variable Depth Milling Along Curb (6'Wide)
S.Y.
3,280
6.00
19,680.00
9.5mmSuperpaveWearingCourse,11/2"Depth
TONS
720
80.00
57,600.00
4.
DY/4"CenterlinePavement Markings
L.f.
2,200
0.75
1,650.00
SUBTOTALOFITEMC.
90,930.00
D.
ADELEAVENUE-FULLLENGTH-625L.F.
1.
Base Repair, 4"Depth (8%)
S.Y.
190
40.00
7,600.00
2.
ScratchCourse(9oIb/SYforEntireRoad)
TONS
110
75.00
8,250.00
3.9.5mmSuperpaveWearingCourse,11/2"Depth
TONS
220
80.00
17,600.00
SUBTOTALOFITEMD.
33,450.00
E.
INAAVENUE-FULLLENGTH-305L.F.
BaseRepair,4"Depth
S.Y.
120
40.00
4,800.00
2. Scratch Course (90 Ib/SY for 50% of Road)
30
TONS
75.00
2,250.00
3. 9.5 mm Superpave Wearing Course, 1 1/2" Depth
90
TONS
80.00
7,200.00
SUBTOTALOFITEME.
$14,250.00
Page 1 of 2

SYSTEMSDESIGN
SDE
ENGINEERING,INC
Client:MaidencreekTwp
Date: 3-9-2017
ProjectNo.:17-0019-0115
Revised:
Project Name: 2017 Annual Road Project
F.
BLANDONAVENUE-PARKROADTONEAR#112-310L.F.
1. Base Repair, 4" Depth (Approx.)
S.Y.
90
40.00
3,600.00
2. 9.5mm SuperpaveWearingCourse,11/2"Depth
TONS
80
80.00
6,400.00
SUBTOTALOFITEMF
10,000.00
G.
ORCHARDROAD-SNYDERROADTOBEWLEYLANE-91OL.F.(INCL.2'WIDENINGBOTHSIDES)
Base Repair, 4"Depth (Approx.)
240
S.Y.
1.
40.00
9,600.00
Widen3',BothSides (2'+Sawcut&Remove12")
2.
S.Y.
610
140.00
85,400.00
ScratchCourse (90 Ib/SYfor50% of Road)
TONS
40
75.00
3,000.00
4.
9.5mmSuperpaveWearingCourse,11/2"Depth
TONS
220
80.00
17,600.00
5.DY/4"CenterlinePavement Markings
L.f.
880
0.75
660.00
SUBTOTALOFITEMG.
$116,260.00
H.
STOPBARS
EA.
200.00
1,200.00
SUBTOTALOFITEMSA.ANDH.
$455,397.50
10%CONTINGENCY
$45,539.75
TOTALESTIMATEDPROJECTCOST
$500,937.25
NOTE:Unit costs based on 2017 bid prices and 2016bid prices increased by approx.10%.
ALTERNATECONSTRUCTION-COLD-IN-PLACERECYCLING(IFSUFFICIENTEXIST.ASPHALT)
G.
ORCHARD ROAD-SNYDERROADTOBEWLEY LANE-91OL.F.(INCL.2'WIDENINGBOTHSIDES)
Cold-in-PlaceRecycledBaseCourse,5"Depth
S.Y.
2,340
8.00
18,720.00
2.
Emulsified Asphalt (CSS-1h)
GAL
4,680
1.80
8,424.00
3.
Slot Mill 2' Width Both Sides × 12" Depth
S.Y.
410
10.00
4,100.00
4.
Place6"Compacted2ASubbaseinSlots
S.Y.
410
15.00
6,150.00
9.5mmSuperpaveWearingCourse,11/2"Depth
5.
TONS
220
80.00
17,600.00
6. Road Coring and Mix Design
L.S.
$ 5,000.00
5,000.00
7.Y/4"C/LandW/4"EachCartwayEdgePavementMarkings
L.f.
880
0.75
660.00
SUBTOTALOFITEMG.
60,654.00
Page 2 of 2

Cc:
February
SEO Desk
T. Unger 2 copies
Date
17-0019-0300
SDE
App.
SEO report, admin/filing.
MAIDENCREEKTOWNSHIP
SEOACTIVITYREPORT
2/1/17 - 2/28/17
Applicant/Activity
projects/maidencreek/17-0019-0300/seoactivity
Applicant
to Date By
Fee Paid
Billed/Paid
Chk #