Board of Supervisors
Agenda — March 9, 2017
- Date
- March 9, 2017
- Type
- Agenda
- Year
- 2017
- File
- PDF · 924 KB
Document text
Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 521 words
MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS March9,2017 ENGINEER'SAGENDA SubdivisionReviewStatusChecklist Next Supervisors Meeting April 9,2017. Subdivision/Zoning/LDP No Plans currently. Projects Zoning Ordinance Zoning Ordinance & Zoning Map Final. Hearing scheduled for Mon. March 27th @ 9a.m. StormwaterProjects Walnut Manor Tree Dr.-No bids anticipated; recommended rebid in Jan.2017. Ina/Rt. 73 - Lindbergh/Adele - on hold. WestShoreDrive Meet with inspector for state on Tues.,Aug.23regarding Bridge Inspection. Report. Repairs are somewhatextensive; Twp.Involvement ispossible Three (3) 60" dia.Pipes required as alternative to existing opening. Not desirable due to maintenance. Twp.tomakerepairs as schedulepermits. Street Lighting Investigation of light intensity ongoing; possible drone camera after leaves are off the trees. Ed Kopicki received FAA permit to fly drone at night. Did a test flight over Spirit Ct.; and Ontelaunee Heights. 2017StreetProject List of proposed streets with cost estimate, copy attached. SubdivisionImprovementLOC/EscrowRelease SewageEnforcementOfficerActivityReport February Report. Page1of1 I:\Projects\MaidencreekTownshipl17-0019-0100\Engineer'sAgenda|3.9.17.docx SYSTEMSDESIGN SDE ENGINEERING,INC Client: Maidencreek Twp. Date:3-9-2017 ProjectNo.:17-0019-0115 Revised: Project Name:2017AnnualRoadProject BUDGETCONSTRUCTIONCOSTESTIMATE Description Units Quantity Unit Cost Total. A. EVANSVILLEROAD-MAIDENCREEKRD.TO1St90-Deg.TURN-COLD-IN-PLACERECYCLING-2,250L.F. Cold-in-PlaceRecycledBaseCourse,5"Depth S.Y. 1. 5,250 8.00 42,000.00 2. E Emulsified Asphalt (CSS-1h) GAL 10,500 1.80 18,900.00 9.5mmSuperpaveWearingCourse,11/2"Depth TONS 480 80.00 38,400.00 Road Coring and Mix Design 4. L.S. 5,000.00 5,000.00 5. Y/4"C/LandW/4"EachCartwayEdgePavementMarkings L.f. 2,230 2,787.50 SUBTOTALOFITEMA. $107,087.50 B. W.WESNERROAD-MIDDLEOFS-CURVENEARSTEINERPLACETOCHESTNUTSTREET-2,7OOL.F. Base Repair, 4" Depth (3%) 1. S.Y. 240 40.00 9,600.00 Milling at Inlets and Low Side Driveways 2. S.Y. 190 8.00 1,520.00 ScratchCourse(90Ib/SYfor50%ofRoad) TONS 75.00 13,500.00 4. 9.5mmSuperpaveWearingCourse,11/2"Depth TONS 720 80.00 57,600.00 SUBTOTALOFITEMB. 82,220.00 C. SPIRITCOURT-CORNERSTONETOCORNERSTONE-2,34OL.F. Base Repair, 4"Depth (5%) S.Y. 1. 400 40.00 12,000.00 2. Variable Depth Milling Along Curb (6'Wide) S.Y. 3,280 6.00 19,680.00 9.5mmSuperpaveWearingCourse,11/2"Depth TONS 720 80.00 57,600.00 4. DY/4"CenterlinePavement Markings L.f. 2,200 0.75 1,650.00 SUBTOTALOFITEMC. 90,930.00 D. ADELEAVENUE-FULLLENGTH-625L.F. 1. Base Repair, 4"Depth (8%) S.Y. 190 40.00 7,600.00 2. ScratchCourse(9oIb/SYforEntireRoad) TONS 110 75.00 8,250.00 3.9.5mmSuperpaveWearingCourse,11/2"Depth TONS 220 80.00 17,600.00 SUBTOTALOFITEMD. 33,450.00 E. INAAVENUE-FULLLENGTH-305L.F. BaseRepair,4"Depth S.Y. 120 40.00 4,800.00 2. Scratch Course (90 Ib/SY for 50% of Road) 30 TONS 75.00 2,250.00 3. 9.5 mm Superpave Wearing Course, 1 1/2" Depth 90 TONS 80.00 7,200.00 SUBTOTALOFITEME. $14,250.00 Page 1 of 2 SYSTEMSDESIGN SDE ENGINEERING,INC Client:MaidencreekTwp Date: 3-9-2017 ProjectNo.:17-0019-0115 Revised: Project Name: 2017 Annual Road Project F. BLANDONAVENUE-PARKROADTONEAR#112-310L.F. 1. Base Repair, 4" Depth (Approx.) S.Y. 90 40.00 3,600.00 2. 9.5mm SuperpaveWearingCourse,11/2"Depth TONS 80 80.00 6,400.00 SUBTOTALOFITEMF 10,000.00 G. ORCHARDROAD-SNYDERROADTOBEWLEYLANE-91OL.F.(INCL.2'WIDENINGBOTHSIDES) Base Repair, 4"Depth (Approx.) 240 S.Y. 1. 40.00 9,600.00 Widen3',BothSides (2'+Sawcut&Remove12") 2. S.Y. 610 140.00 85,400.00 ScratchCourse (90 Ib/SYfor50% of Road) TONS 40 75.00 3,000.00 4. 9.5mmSuperpaveWearingCourse,11/2"Depth TONS 220 80.00 17,600.00 5.DY/4"CenterlinePavement Markings L.f. 880 0.75 660.00 SUBTOTALOFITEMG. $116,260.00 H. STOPBARS EA. 200.00 1,200.00 SUBTOTALOFITEMSA.ANDH. $455,397.50 10%CONTINGENCY $45,539.75 TOTALESTIMATEDPROJECTCOST $500,937.25 NOTE:Unit costs based on 2017 bid prices and 2016bid prices increased by approx.10%. ALTERNATECONSTRUCTION-COLD-IN-PLACERECYCLING(IFSUFFICIENTEXIST.ASPHALT) G. ORCHARD ROAD-SNYDERROADTOBEWLEY LANE-91OL.F.(INCL.2'WIDENINGBOTHSIDES) Cold-in-PlaceRecycledBaseCourse,5"Depth S.Y. 2,340 8.00 18,720.00 2. Emulsified Asphalt (CSS-1h) GAL 4,680 1.80 8,424.00 3. Slot Mill 2' Width Both Sides × 12" Depth S.Y. 410 10.00 4,100.00 4. Place6"Compacted2ASubbaseinSlots S.Y. 410 15.00 6,150.00 9.5mmSuperpaveWearingCourse,11/2"Depth 5. TONS 220 80.00 17,600.00 6. Road Coring and Mix Design L.S. $ 5,000.00 5,000.00 7.Y/4"C/LandW/4"EachCartwayEdgePavementMarkings L.f. 880 0.75 660.00 SUBTOTALOFITEMG. 60,654.00 Page 2 of 2 Cc: February SEO Desk T. Unger 2 copies Date 17-0019-0300 SDE App. SEO report, admin/filing. MAIDENCREEKTOWNSHIP SEOACTIVITYREPORT 2/1/17 - 2/28/17 Applicant/Activity projects/maidencreek/17-0019-0300/seoactivity Applicant to Date By Fee Paid Billed/Paid Chk #