MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS
May11,2017
ENGINEER'SAGENDA
SubdivisionReviewStatusChecklist
Next Supervisors Meeting June 8,2017.
Subdivision/Zoning/LDP
No Plans currently in review.
MelrosePlace-Stormwater/Grading
SDE,Inc.sentItr.ToBCCD,datedMay1,2017
SDE, Inc.sent Itr.ToFolino, dated May5,2017
SDE rec'd phone call May11, 2017 fromAtty.Sal Folino at Brennan Law
Offices; Atty.Sal Folino indicated that Folino would be mobilizing/planning to
do the work per SDE Itr. And that Folino would call to arrange a site meeting
prior to starting of work.
Projects
StormwaterProjects
Walnut Manor Tree Dr.-Bids received on April 3, 2017; bid awarded to
Wexcon,Inc.in the amount of $28,635.00.
Ina/Rt.73- Lindbergh/Adele-on hold.
Preconstruction mtg.held onThurs.May11,2017
WestShoreDrive
Report.
Repairs are somewhat extensive; Twp.Involvement is possible
Three (3) 60" dia. Pipes required as alternative to existing opening. Not
desirable due to maintenance.
Twp.to make repairs as schedule permits.
Street Lighting
Ontelaunee Heights completed.
2017 Street Project
Bids received on May 11,2017; bid tabulation, copy to be provided at mtg.
Page 1of 2
I:\Projects\MaidencreekTownship/17-0019-0100\Engineer'sAgendal5.11.17.docx

MS4
SDE preparingPRP(PollutionReductionPlan)fortheWillowCreek&TMDLfor
LakeOntelaunee.
Must be advertised for a public comment period.
FinalplanmustbesubmittedtoDEPbySeptember18,2017
SubdivisionImprovementLOC/EscrowRelease
SewageEnforcementOfficerActivityReport
NoActivity
Page 2 of 2
I:\Projects\MaidencreekTownship/17-0019-0100\Engineer'sAgenda|5.11.17.docx

SYSTEMSDESIGN
APossicritor Enoineerne Excellcnce
ENGINEERINGINC
sdei.net
May1,2017
Mr.DeanDruckenmiller,DistrictExecutive
Berks CountyConservationDistrict
1238CountyWelfareRoad
Suite200
Leesport,PA19533
RE:
MaidencreekTownship
MelrosePlace Subdivision
DearMr.Druckenmiller:
SystemsDesign Engineering,Inc.(SDE)representsMaidencreekTownship asmunicipal engineer.SDE
has reviewed theCorrectiveActionPlan(CAP)preparedforMelrosePlacebyMcCarthyEngineering.It
appears that the CAP, and the PCSM Plan in general, require a fair amount of monitoring to assure
proper implementation andlong-term benefit.Onbehalf ofMaidencreek Township,pleaseconsiderthe
following questions andcomments:
1.TheTownshipapproved the subdivisionplan withstormwaterBMPsthat weredeemed
adequate at the time of plan approval. Subsequent to that approval, it is our understanding that
the developer needed to renew hisNPDESpermit and in so doing, was responsible for
implementing additional BMPs tobring the PCSM Plan uptocurrentstandards.Apparently,that
obligation was notmet and the resulting CAP requires additional BMPs that also post-date the
Township's approval.
Unfortunately,the Township has no financial means to inspect and enforce the implementation
of BMPs that are not covered underthe original subdivision approval.Normally,these
and there are monies in place to reimburse the Township for activities performedby its
engineer.Is BCCD conducting thenecessaryinspectionsandenforcement as needed to ensure
compliance with the NPDES Permit and CAP?
2.Under the CAp,several of the lots will have seepage beds and rain gardens that are not within
easementsnordepicted onthe approved subdivision plan.Theapproved plangives the
Township the right to enter properties via easements to inspect the covered BMPs,but the
Townshipdoesnothavethatabilityforthepostapproval BMPs.Will BcCDbeinspectingthese
BMPs in perpetuity? Will BCCD be the point of contact for complaints or investigations
pertainingto these BMPs?
3.The CAp limits sheds and patios to certainmaximum sizesper lot,in orderto assure that
sufficient amended soils areas remain undisturbed. Odds are that residents of the affected lots
will approach Township code officials at some future date for permits for sheds or patios. If
these applications are for structures that exceed the CAP limits, but still meet the Township's
1032JamesDrive,Leesport,PA19533.P:610.916.8500.F:610.916.8501

BCCD-DeanDruckenmiller
-2-
May 1, 2017
regulations, it wouldappear that theTownship would have no basis to deny the permit, even
knowing that it violates the CAP terms.Is there a mechanism whereby BCCD could"overrule"
the permit, or otherwise limit the homeowner to the prescribed maximum sizes? What are the
legal implications forthe Township if it issues a permitfor a"legal"structurethatwould violate
theCAPandinturntheNPDESpermit/CleanStreamsLaw?
4.In reviewing theMOUbetween BCCD and Maidencreek Township,wearenot seeing wherethe
Township has agreed to conduct inspections or enforcement actions that are associated with
theNPDESpermit.DoesBCCDseeotherwise?
5.Is it correct that BCCDcontinues tohave regulatoryauthority over the NPDES permit,even after
the Notice of Termination (NOT) is filed?
We bring these items to your attention to make BCCD aware of the Township's limitations in assisting
the Districtwithcompliance andenforcement of post-municipalapproval BMPs.Often,theTownship is
the complainant's first stop when something is perceived as being wrong,and we believe there needs to
be consistencybetween BCCD and theTownship in how wereact and respond to the Township's
residents.
On behalf of Maidencreek Township, weappreciateyour time and considerationofthe foregoing.
Please respond at your earliest convenience, and feelfree to contact me if you have any questions or
comments.
Verytrulyyours,
SYSTEMSDESIGNENGINEERING,INC
MarkA.Kitzmiller
m.kitzmiller@sdei.net
CC:
DianeHollenbach,TownshipManager
File:i:projectslmaidencreektownship/06-0019-0585melroseplacel/trtobccdrecap.docx

SYSTEMSDESIGN
sdei.net
May5,2017
Mr.Mario Folino
CERTIFIED MAIL
340OldRoute22
Return Receipt Requested
Kutztown,PA19530
70162140000109912649
Re:
Melrose Place
Grading&Punchlist Items
Dear Mr.Folino:
On behalf of MaidencreekTownship and inaccordance withthe Melrose Place Subdivision Improvement
agreement Systems Design Engineering, inc.conducted a site inspection of the residential lots within the
Melrose Place Subdivision. Additionally,the Township has received a number of complaints regarding
grading,storm water and topsoil distribution from property owners.The following are the inspection
punchlistitems that requireyour immediate attention:
1.The rear portions of Lots3g through So shall begraded per approved plan to drainto
Swale 4.(Specifically at this time lots 47 through 49 are not graded per plan, there
appears to be a berm between the swale and the back of the house which traps storm
water).
2.Swale 4 is not graded per approved plan. Swale 4 shall be graded to flow west to east
(flow from Lot 47to Lot50).
3.Swale4has otherissuesinadditiontoltem2above:
a.
No defined swale on Lot 50.
b.
DebrisblockingswaleonLot49.
4.
Swale 1 grading shoulid be confirmed that it is in accordance with approved plans.
Landscapeblocksare inswalebetweenLots21/22.
Bird feeder and mounding of ground placed in swale 2 rear of Lot 11.
6.
Streettreesmissingoncompleted lots:
a.
Lot 1-one tree missing
b.
Lot 46--three trees missing
7.Tree/Landscape plantings are missing from center island of the reconstructed pond A1.
1032JamesDrive,Leesport,PA19533.P:610.916.8500.F:610.916.8501

Inadditiontotheabove items,pleasetakenoteof thefollowing:
8.Property owners on Lots 47, 48 and 19have made itknown that they would like amended
soil ortopsoil graded on their lots. This wouldhelpyou with the NPDESpermit
requirementandyoumaybeabletoeliminatesomeotherNPDESrequirements suchas
a rain garden or drainage pit. In addition, it would seem to be appropriate since Lots 47
& 48 need to be regraded and Lot 19 is between Lots18 and 20 which are to have
amended soils.
9.Upon completion of the project"as-built"plans arerequired to show compliance with the
approved plans.
Please contact this office within S days of receipt of this letter to schedule a site meeting to review.
Completion of items1 through7shall becompleted within 30 days of receiptof this letteroranapproved
schedule.
Respectfullysubmitted,
SystemsDesign Engineering,Inc.
ThomasS.Unger,P.E.
TSU/II
Cc:
Maidencreek Township,Diane Hollenbach, Manager
Mr.EugeneOrlando,Esq.
Rudolfo Folino
File06-0019-0585

SYSTEMSDESIGN
SDE
ENGINEERING,INC
PRE-CONSTRUCTIONMEETINGMINUTES
Project:_WalnutManor Storm Sewer RepairProject
Project No.:_16-0019-0248
Municipality:Maidencreek Township
Date:_May 11, 2017
Time: 10:15 AM
Location: Township Building
Contractor:Wexcon,Inc.
1.The sign-in sheet of those in attendance is attached.
2.The meeting generally followed the Pre-Construction Meeting Agenda Items that was
distributed at the meeting. Specific items discussed in depth are summarized below.
3.The overall scope of work for the project was reviewed.TheTownship emphasizeda
condition of one of the easement agreements to provide notification at least 48 hours
before the start of work.TheTownshipwould like at least 72hours'notice sothey have
timeto notifythe propertyowners.
4. The overall project schedule and timeframe was discussed, and the following schedule
and timeframewere agreedto:
A.Wexconwill startsometimetheweekofMay22nd.
B. Wexcon expects the work to take less than a week to complete.
C. Work will begin on Lot 73 (337 W.Walnut Tree Drive).
5. The Notice to Proceed was issued and signed by Paul at the meeting. The official start
date is May 22, 2017 and the substantial completion date is June 12, 2017 (21 days).
6. The requirement that the Contractor is responsible for damages to the existing fence,
trees, shrubs, driveways, etc. was discussed. Also discussed in detail is the requirement
to reconnect the existing downspout pipes for Lot 73 to the replacement storm sewer if
the downspout pipe currently ties into the section of pipe being replaced.
7.
The safety items in the agenda were discussed and agreed to.
8.
QuestionsraisedbyWexcon:
A. May 2A aggregate be used for the storm sewer pipe envelope instead of AASHTO
No.57 (2B)?
Yes, 2A may be substituted.

MaidencreekTownship
WalnutManorStormSewerRepairProject
Pre-BidMeetingMinutes
B.Whois responsibleforthetopsoiland seeding/mulching of theeasementareas at
thecloseof construction?
TheTownshipwill performthetopsoil preparationandseeding/mulchingafter
the topsoil stockpile is respread by Wexcon.
9.SDEwill staketheconstructioneasement limits.
10. SDE gave Wexcon, Inc. two compiled contract manuals (includes the executed contract
documents, bonds, insurance, etc.). Two copies of the Notice to Proceed were retained
by Paul, and four were returned to SDE.
Themeetingwasadjournedatapproximately1o:45A.M.
Respectfullysubmitted,
SYSTEMSDESIGNENGINEERING,INC.
Craig Momose, P.E.
Attachments:
Sign-In Sheet
Pre-Construction Meeting Agenda Items
Page 2of 2

Page 1
(Bid Items #6.A. thru #7.B.)
Evansville Rd
#q6,904. 75
TOTALBASEBID
CONTRACT B
# 374,256. 75
ALT BID ITEMS #A.1.&#A.2.)
(Bid items #1,#2,#5 and
w/5piri+ Ct. 4
92,595.00
Orchard Rd.
CONTRACT'A'
TOTALBID
Mercle
(Bid Items#1,#2,#3,#5and
Cold -in -place
# 302, 006. 92
w/Orchard Rd
Contrac+ "B"
ALT BID ITEM #A.2.)
书297.218. 75
Contrac "A'
CONTRACT'A'
TOTAL
recycle
TOTAL BID
CONTRACT'B'-COLD-IN-PLACE RECYCLING
CONTRACT'A'-ROADIMPROVEMENTS
PIa ON
BERKSCOUNTY,PENNSYLVANIA
2017ANNUALROADPROJECT
MAIDENCREEKTOWNSHIP
SPECIFICATIONSFOR
BID OPENING
MAY 11, 2017
and ALT BID ITEM #A.1.)
(Bid Items#1,#2,#4,#5
Cold -in-plve
w/Spiri+ C.
CONTRACT'A'
TOTALBID
Landis C. DecK
I:\Projects\MaidencreekTownshipl17-0019-01152017Annual Road Project/Admin\BIDOPENING LIST
(Bid Items #1.A. thru #5.C.)
# 289. 393.92
# 281,661. 75
TOTALBASEBID
CONTRACT A
spi9
NewEnterpriseStone&LimeCo.
Division of H&K Group, Inc.
New Enterprise,PA16664
301
Asphalt Paving Systems
3912 Brumbaugh Road
Lehighton, PA 18235
Landis C.Deck & Sons
BIDDERS
Skippack, PA 19474
Site Contractors
595 Mill Road
P.O. Box 196
POBox77

Tom Unger
From:
MarkKitzmiller
Sent:
Thursday,May11,201710:04AM
To:
TomUngerKeithShowalter
Subject:
MS4Info
Tom&Keith:
ForMaidencreek andLaureldale'sMS4requirementsthat includeTMDLandPRPPlansfortheirimpaired streams (these
areSDE'sonly2withthisobligation):
meeting,respectively,sothatthepubliccanshowupandaskquestionsifneeded.
ThatmeansImusthavetheplanscompletedbyJuly21.
--Mark

SUMMARY
IMPROVEMENTAGREEMENTSINVOICES
APPROVEDFORPAYMENT
MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS
MAY 11,2017
INVOICENO.
DATEOFINVOICE/PAYEE
AMOUNT
1.MelrosePlace
87748
04/30/17MaidencreekTwp.-Re:SDE,Inc.
$724.24
AMOUNTDUE
$724.24
TOTALAMOUNTDUE
$724.24
I:/Projects/Maidencreek TownshiplImprovement Agreement Summaries/201715.11.17.doc