Other Township Records

Document — April 12, 2017

Date
April 12, 2017
Type
Document
Year
2017
File
PDF · 2.5 MB

Download original Open in browser

Document text

Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 316 words

Motions - Park and Rec April 12, 2017 Meeting
Paving of Upper Loop at Community Park -
Kevin Dunn made a motion to recommend to the Board of Supervisors to accept the quote from
Ronnie C. Folk Paving, Inc. for the amount of $14,275.00 to pave the upper loop parking lot at
the Community Park, seconded by Susie Carbaugh. Hearing no questions, all voted in favor. The
motion passed.
Eagle Scout Project -
Kevin Dunn made a motion to recommend to the Board of Supervisors to approve Avery
Millisock's Eagle Scout Project of installing a flagpole at the Community Park, at a cost not to
exceed s2,707.36, seconded by Jeremy Breidenstein. Hearing no questions, all voted in favor.
The motion passed.

Paving of Upper Loop
Ronnie Folk
$ 14,275.00
Arlan Wessner
$ 16,400.00
Landis C Deck
$ 17,956.00

Costs
25FootIHAluminumFlagpole=$1,941
American &PAflags=$71.85
Flagpole installation costs:
1. Concrete = $3.69 *4 bags needed*
2. Sonotube = $7.42
3. Clear Silicone Caulk = $7.83
4. Duct Tape = $3.49
5. Sand = $4.15 *2 bags needed*
6. Black Electrical Tape = $1.99
7. 5 Gallon Bucket = $2.98
8. Galvanized Steel Foundation Sleeve = $75.29
Platform:
1. Flagstone Retaining Wall Blocks = $2.28 *50 blocks needed*
2. Top Soil = $1.69 *5 bags needed*
Memorial Bench:
1。 ??Mulch = $3.33 *10 bags needed*
2. Perennial Plants = will be donated *no cost*
Total Cost: $2,740.66
Light #1 - $1046.04
*disadyantage- possible vandalism; weather dependent*
Light #2 - $1050.05
*disadvantage- rnounted at top -of flagpole; weather dependent*
With mulch& blocks = $2740.66
Withoutmulch=$2707.36
#yso liqhts
-Without-rnulch.&.blocks---$2,593.36-
mi llisock

Possible location for flagpole installation: closer to baseball fields
HBLED10
HSLED13
Floodand Spot
TightSpot
Options
Finish
White,Bronze,BlackorVerdeGreenchipand
MARKER
AO5.277VAC
werFactor9696
LFLEDSalsoavailableinBrassdesignedfor
marine use
peratures-40°C(-40"F
Color Consistencyand Stability
tothenghtRABLEDColorStablityis
spuebunsai0e-wnuopasegpainsealu
LEDflood lights (RAM)- 2

Preferred location of lights: on utilitypole nearpavilion
Alternate location of lights: mounted on either side of pavilion roof

Archived from the Maidencreek Township website. Reproduced unaltered; not an official records repository.