Other Township Records
Document — April 12, 2017
- Date
- April 12, 2017
- Type
- Document
- Year
- 2017
- File
- PDF · 2.5 MB
Document text
Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 316 words
Motions - Park and Rec April 12, 2017 Meeting Paving of Upper Loop at Community Park - Kevin Dunn made a motion to recommend to the Board of Supervisors to accept the quote from Ronnie C. Folk Paving, Inc. for the amount of $14,275.00 to pave the upper loop parking lot at the Community Park, seconded by Susie Carbaugh. Hearing no questions, all voted in favor. The motion passed. Eagle Scout Project - Kevin Dunn made a motion to recommend to the Board of Supervisors to approve Avery Millisock's Eagle Scout Project of installing a flagpole at the Community Park, at a cost not to exceed s2,707.36, seconded by Jeremy Breidenstein. Hearing no questions, all voted in favor. The motion passed. Paving of Upper Loop Ronnie Folk $ 14,275.00 Arlan Wessner $ 16,400.00 Landis C Deck $ 17,956.00 Costs 25FootIHAluminumFlagpole=$1,941 American &PAflags=$71.85 Flagpole installation costs: 1. Concrete = $3.69 *4 bags needed* 2. Sonotube = $7.42 3. Clear Silicone Caulk = $7.83 4. Duct Tape = $3.49 5. Sand = $4.15 *2 bags needed* 6. Black Electrical Tape = $1.99 7. 5 Gallon Bucket = $2.98 8. Galvanized Steel Foundation Sleeve = $75.29 Platform: 1. Flagstone Retaining Wall Blocks = $2.28 *50 blocks needed* 2. Top Soil = $1.69 *5 bags needed* Memorial Bench: 1。 ??Mulch = $3.33 *10 bags needed* 2. Perennial Plants = will be donated *no cost* Total Cost: $2,740.66 Light #1 - $1046.04 *disadyantage- possible vandalism; weather dependent* Light #2 - $1050.05 *disadvantage- rnounted at top -of flagpole; weather dependent* With mulch& blocks = $2740.66 Withoutmulch=$2707.36 #yso liqhts -Without-rnulch.&.blocks---$2,593.36- mi llisock Possible location for flagpole installation: closer to baseball fields HBLED10 HSLED13 Floodand Spot TightSpot Options Finish White,Bronze,BlackorVerdeGreenchipand MARKER AO5.277VAC werFactor9696 LFLEDSalsoavailableinBrassdesignedfor marine use peratures-40°C(-40"F Color Consistencyand Stability tothenghtRABLEDColorStablityis spuebunsai0e-wnuopasegpainsealu LEDflood lights (RAM)- 2 Preferred location of lights: on utilitypole nearpavilion Alternate location of lights: mounted on either side of pavilion roof