3800-FM-BPNPSM0491 Rev. 4/2014 COMMONWEALTH OF PENNSYLVANIA

MS4 Annual/Progress Report DEPARTMENT OF ENVIRONMENTAL PROTECTION

BUREAU OF POINT AND NON-POINT SOURCE MANAGEMENT

MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4)
ANNUAL/PROGRESS REPORT

For the Reporting Period: May 10,2016 to May 9, 2017

Annual Report Progress Report Due Date: May 17, 2017
New Permittee Renewal Permittee

GENERAL INFORMATION

Permittee Name: Maidencreek Township NPDES Permit No.: PA133521
11/21/2003
Mailing Address: PO Box 319 Effective Date: 03/09/2008

City, State, Zip: Blandon, PA 19510 Expiration Date:

MS4 Contact Person: Diane Hollenbach Renewal Due Date:

Title: Manager/Secretary/Treasurer Admin. Extended? Yes No

Phone: 610-926-4920 Municipality: Maidencreek Township

Email: maidentwp@gmail.com County: Berks

Co-Permittees (if applicable):

WATER QUALITY INFORMATION

Are there any discharges to waters within the Chesapeake Bay Watershed? Yes No

Identify all surface waters that receive stormwater discharges from storm sewers within the MS4 urbanized area and provide the
requested information (see instructions).

Receiving Water Name Ch. 93 Class. Impaired? Cause(s) TMDL? WLA?

sediment

Nutrients, Suspended 26.6 metric
Solids
Lake Ontelaunee WWF, MF Yes Yes ton/yr

phosphorus

5.98 kg/yr

Willow Creek and unnamed CWF, MF No Pathogens, Nutrients No
tributaries

Maiden Creek WWF, MF No Pathogens No

Identify any Wasteload Allocations (WLAs) identified in TMDLs for the MS4, if applicable. Identify the pollutant(s) and mass
load(s)):

-1-

3800-PM-BPNPSM0XXX 4/2013 COMMONWEALTH OF PENNSYLVANIA
MS4 Annual/Progress Report DEPARTMENT OF ENVIRONMENTAL PROTECTION
BUREAU OF POINT AND NON-POINT SOURCE MANAGEMENT

-2-

3800-FM-BPNPSM0491 Rev. 4/2014
MS4 Annual/Progress Report

GENERAL MINIMUM CONTROL MEASURE (MCM) INFORMATION

Have you completed all MCM activities required by the permit for this reporting period? Yes No

Provide current contact name and phone number information for the required MCMs (if same as page 1, leave blank):

MCM Contact Name Phone

#1 Public Education and Outreach on Storm Water Impacts Diane Hollenbach 610-926-4920

#2 Public Involvement/Participation Diane Hollenbach 610-926-4920

#3 Illicit Discharge Detection and Elimination (IDD&E) Greg Wolfe 610-926-4920

#4 Construction Site Storm Water Runoff Control Berks County Cons. 610-372-4657
District

#5 Post-Construction Storm Water Management in New Development Diane Hollenbach 610-926-4920
and Redevelopment

#6 Pollution Prevention / Good Housekeeping Keith Shuman 610-926-4920

MCM #1 – PUBLIC EDUCATION AND OUTREACH ON STORM WATER IMPACTS

BMP #1: Develop, implement and maintain a written Public Education and Outreach Program

Measurable Goal: For new permittees a Public Education and Outreach Program (PEOP) shall be developed and implemented
during the first year of permit coverage and shall be re-evaluated each permit year thereafter and revised as needed. For renewal
permittees, the existing PEOP shall be reviewed and revised as necessary. The permittee’s PEOP shall be designed to achieve
measurable improvements in the target audience’s understanding of the causes and impacts of stormwater pollution and the
steps they can take to prevent it.

1. For new permittees only, attach the written PEOP or a summary thereof to the first report submitted to DEP.

2. If you are not a new permittee, did you complete and submit your written PEOP to DEP? Yes No
If Yes, provide the latest submission date: May 17, 2017

3. Date of last evaluation of or revision to the PEOP: February 9, 2017

4. What were the plans and goals for public education and outreach for the reporting period?

Educate the public on the impacts of polluntants discharged in storm water runoff and discourage dumping and
encourage reporting of illicit discharges.

5. Did the MS4 achieve its goal(s) for the PEOP during the reporting period? Yes No

Explain the rationale for your answer:

Maidencreek Township by itself and through the activities of the Berks County MS4 Steering Committee held
events, published articles and hung posters to meet our MCM 1 goals. We posted an illicit discharge reporting
form on the Township website.

6. Identify specific plans and goals for public education and outreach for the upcoming year:

Our public education goals for 2017 are to educate residents on what to look for and how to report illicit discharge
into the storm sewer system. We will participate in the Berks County Steering Committee education program and
use our newsletter, website, and Facebook page to publicize events, brush collection, household hazardous waste
collections, etc. We will begin to focus efforts on the farm community by sending a special newsletter to farms in
our Ag Security Area.

BMP #2: Develop and maintain lists of target audience groups present within the areas served by your MS4

-3-

3800-FM-BPNPSM0491 Rev. 4/2014
MS4 Annual/Progress Report

Measurable Goal: For new permittees, the lists shall be developed within the first year of coverage under the permit and reviewed
and updated as necessary every year thereafter. For renewal permittees, the lists shall continue to be reviewed and updated
annually.
1. For new permittees only, attach your target audience list(s) to the first report submitted to DEP.

2. If you are not a new permittee, did you complete and submit your target audience list to DEP? Yes No
If Yes, provide the latest submission date: May 17, 2017

3. Date of last review or revision to target audience list(s): February 9, 2017

BMP #3: Annually publish at least one educational item on your Stormwater Management Program

Measurable Goal: For new permittees, stormwater educational and informational items shall be produced and published in print
and/or on the Internet within the first year of permit coverage. In subsequent years (and for renewal permittees), the list of items
published and the content in these items shall be reviewed, updated, and maintained annually. Your publications shall contain
stormwater educational information that addresses one or more of the 6 MCMs.

1. For new permittees only, attach your published stormwater educational or informational materials to the first report submitted
to DEP.

2. If you are not a new permittee, did you complete and submit your published stormwater educational or informational materials
to DEP? Yes No
If Yes, provide the latest submission date: May 17, 2017

3. Do you have a municipal newsletter? Yes No
If Yes, how often was it published during the reporting period and what MS4-related material did it contain?
It was published three times and contained articles titled: "What Do I Do With My Grass Clippings" and "Auto Care
and Water Pollution". We also published in the newsletter and announcements for brush and leaf collection,
household hazardous waste and prescription drug collection.

4. Do you have a municipal website? Yes No (URL: www.maidencreek.net)
If Yes, what MS4-related material does it contain?
Our storm water and source water protection page contain articles on caring for a streamside property, source
water protection, proper disposal of household hazardous waste and prescription drugs, septic care and
maintenance, "When It Rains, It Drains, the PEOP and PIPP, links to local watershed groups and information on the
Willow Creek Restoration Project. We added in February, an illicit discharge citizen reporting form.

5. Describe any other method(s) used during the reporting period to provide information on stormwater to the public:
The Township publishes a calendar yearly which includes information on how to report illicit discharge. We also
held an advertised public meeting to review our PEOP, PIPP and provide education. Posters were posted in the
municipal building on storm water.

6. Date of most recent review and/or update to published stormwater educational materials: February 9, 2017

7. Identify specific plans for the publication of stormwater materials for the upcoming year:
In summer of 2017 we will publish an article, "Facts Every Septic System Owner Should Know"" and in spring 2018,
we will publish an article, "Important Ways to Prevent Storm Water Pollution."

BMP #4: Distribute stormwater educational materials to the target audiences

-4-

3800-FM-BPNPSM0491 Rev. 4/2014
MS4 Annual/Progress Report

Measurable Goal: All permittees shall select and utilize at least two distribution methods in each permit year. These are in
addition to the newsletter and website provisions of BMP #3.
Identify the two additional methods of distributing stormwater educational materials during the previous year (e.g., displays,
posters, signs, pamphlets, booklets, brochures, radio, local cable TV, newspaper articles, other advertisements, bill stuffers,
posters, presentations, conferences, meetings, fact sheets, giveaways, or storm drain stenciling).
The Township held a public meeting in February, giveaway a poster at Community Day and Safe Halloween, and posted
posters in the Municipal Building. We also mailed each resident a calendar with information on reporting illicit
discharge.

-5-

3800-FM-BPNPSM0491 Rev. 4/2014
MS4 Annual/Progress Report

MCM #2 – PUBLIC INVOLVEMENT/PARTICIPATION

BMP #1: Develop, implement and maintain a written Public Involvement and Participation Program (PIPP)

Measurable Goal: A new permittee’s PIPP shall be developed and implemented during the first year of coverage under this
General Permit. All permittees shall re-evaluate the PIPP each permit year and revise as needed. Your PIPP shall include, but
not be limited to:

a. Opportunities for the public to participate in the decision-making processes associated with the development,
implementation, and update of programs and activities related to this General Permit.

b. Methods of routine communication to groups such as watershed associations, environmental advisory committees, and other
environmental organizations that operate within proximity to the permittee’s regulated small MS4s or their receiving waters.

c. Making your periodic reports available to the public on your website, at your municipal offices, or by US Mail upon request.

1. For new permittees only, attach your written PIPP or a summary thereof to the first report submitted to DEP.

2. If you are not a new permittee, did you complete and submit your written PIPP or summary to DEP? Yes No
If Yes, provide the latest submission date: May 17, 2017

3. Date of last review and/or update to the PIPP: February 9, 2017

4. Explain how your PIPP addresses items a, b and c of the Measurable Goal:
a. When decisions are needed on the development, implementation and update of programs, the public will be
given the opportunity to participate in the meeting. The PIPP will be publically reviewed annually.
b. Through Township mailers and website as well as activities of the Berks MS4 Steering Committee, the target
audience and stakeholders will be informed of storm water related topics, municipal efforts and ways to partner
with the Township.
c. Periodic reports are available on the website, in the office and by mail or email upon request.

BMP #2: Prior to adoption of any ordinance (municipal permittees) or SOP (non-municipal permittees) required by the
permit, provide adequate public notice and opportunities for public review, input, and feedback.

Measurable Goal: Advertise any proposed MS4 Stormwater Management Ordinance or SOP, provide opportunities for public
comment, evaluate any public input and feedback, and document the comments received and the municipality’s response.

1. Was an MS4-related ordinance or SOP developed during the reporting period? Yes No

2. If Yes, describe how you advertised the draft ordinance and how you provided opportunities for public review, input and
feedback:

3. If an ordinance or SOP was enacted/developed or amended during the reporting period, provide the following information:

Ordinance No. / SOP Name Date of Public Notice Date of Public Hearing Date Enacted

-6-

3800-FM-BPNPSM0491 Rev. 4/2014
MS4 Annual/Progress Report

BMP #3: Regularly solicit public involvement and participation from the target audience groups. This should include an
effort to solicit public reporting of suspected illicit discharges. Assist the public in their efforts to help implement your
SWMP. Conduct public meetings to discuss the on-going implementation of your SWMP.

Measurable Goals: Conduct at least one public meeting per year to solicit public involvement and participation from target
audience groups. The public should be given reasonable notice through the usual outlets a reasonable period in advance of each
meeting. During the meetings, you should present a summary of your progress, activities, and accomplishments with
implementation of your SWMP, and you should provide opportunities for the public to provide feedback and input. Your
presentation can be made at specific MS4 meetings or during any other public meeting. Under this MCM, you should document
and report instances of cooperation and participation in your activities; presentations you made to local watershed organizations
and conservation organizations; and similar instances of participation or coordination with organizations in your community. You
also should document and report activities in which members of the public assisted or participated in your meetings and in the
implementation of your SWMP, including education activities or organized implementation efforts such as cleanups, monitoring,
storm drain stenciling, or others.

1. Date of the public meeting(s): February 9, 2017

2. How were meeting(s) advertised to the public? In a newspaper of general circulation and on the website.

3. Indicate where the meeting(s) were held and the number of attendees:
The meeting was held at the township building, 1 Quarry Road, Blandon and there were 5 people in attendance.

4. What types of MS4-related activities did you solicit public involvement and participation for?
Updating the PEOP and PIPP and ways to encourage people to report illicit discharge

5. What MS4-related activities did the public participate in?
Most interest was in the illicit discharge.

MCM #3 – ILLICIT DISCHARGE DETECTION AND ELIMINATION (IDD&E)

BMP #1: You shall develop and implement a written program for the detection, elimination, and prevention of illicit
discharges into your regulated MS4s. Your program shall include dry weather field screening of outfalls for non-
stormwater flows, and sampling of dry weather discharges for selected chemical and biological parameters. Test results
shall be used as indicators of possible discharge sources.

Measurable Goal: For new permittees, the IDD&E program shall be developed during the first year of coverage under this
General Permit and shall be implemented and evaluated each year thereafter. For renewal permittees, the existing IDD&E
program shall continue to be implemented and evaluated annually. Records shall be kept of all outfall inspections, flows observed,
results of field screening and testing, and other follow-up investigation and corrective action work performed under this program.

1. For new permittees only, attach your written IDD&E program to the first report.

2. If you are not a new permittee, did you complete and submit your written IDD&E program to DEP? Yes No
If Yes, provide the latest submission date: May 17, 2017

3. Date of last review and/or update to IDD&E program: March 9, 2017

BMP #2: Develop and maintain a map of your regulated small MS4. The map must also show the location of all outfalls
and the locations and names of all surface waters of the Commonwealth (e.g., creek, stream, pond, lake, basin, swale,
channel) that receive discharges from those outfalls.

Measurable Goals: For new permittees, develop the map(s) of your regulated small municipal separate storm sewer systems
and the information on all outfalls from your regulated small MS4 by the end of the fourth (4th) year of permit coverage. For
renewal permittees, the existing map(s) of your regulated small MS4 shall be updated and maintained as necessary during each
year of coverage under the permit.

1. Have you completed a map(s) of all outfalls and receiving waters of your storm sewer system? Yes No

-7-

3800-FM-BPNPSM0491 Rev. 4/2014
MS4 Annual/Progress Report

2. For new permittees only, attach the completed map to the 4th year Annual Report.

3. Date of last update or revision to map(s): March 26, 2015

4. Total number of discharge points in your storm sewer system that:
Discharge directly to surface waters (outfalls): 52
Discharge to storm sewers owned by others: 1

5. Total number of outfalls that are mapped at this time: 53

BMP #3: In conjunction with the map(s) created under BMP #2 (either on the same map or on a different map), new
permittees shall show, and renewal permittees shall update, the entire storm sewer collection system, including roads,
inlets, piping, swales, catch basins, channels, basins, and any other features of the permittee’s storm sewer system
including municipal boundaries and/or watershed boundaries.

Measurable Goals: For new permittees, develop the map(s) by the end of the fourth (4th) year of coverage under the permit
and update and maintain the map(s) as necessary each year of permit coverage thereafter. For renewal permittees, update and
maintain the map(s) as necessary during each year of permit coverage.

1. Have you completed a map(s) that includes roads, inlets, piping, swales, catch basins, channels, basins, municipal
boundaries and watershed boundaries? Yes No

2. If Yes, is the map(s) on the same map(s) as for outfalls and receiving waters? Yes No

3. For new permittees only, attach the completed map to the 4th year Annual Report.

4. If you are not a new permittee, did you complete and submit your map to DEP? Yes No
If Yes, provide the latest submission date: May 17, 2017

5. Date of last update or revision to map: March 26, 2015

BMP #4: Following the IDD&E program created pursuant to BMP #1, the permittee shall conduct outfall field screening,
identify the source of any illicit discharges, and remove or correct any illicit discharges using procedures developed
under BMP #1.

For all permittees, outfall inspections need to be prioritized according to the perceived chance of illicit discharges within the
outfall’s contributing drainage area. Observations of each outfall shall be recorded each time an outfall is screened, regardless
of the presence of dry weather flow. Proper quality assurance and quality control procedures shall be followed when collecting,
transporting or analyzing water samples. All outfall inspection information shall be recorded on the Outfall Reconnaissance
Inventory/Sample Collection field sheet excerpted from the Illicit Discharge Detection and Elimination: A Guidance Manual for
Program Development and Technical Assessments (CWP, October 2004). Adequate written documentation shall be maintained
to justify a determination that an outfall flow is not illicit. If an outfall flow is illicit, the actions taken to identify and eliminate the
illicit flow also shall be documented.

The results of outfall inspections and actions taken to remove or correct illicit discharges shall be summarized in periodic reports.

1. For new permittees only, were at least 40% of all outfalls screened during dry weather? Yes No

If Yes for #1, indicate the number screened and the percent of all outfalls it represents. If No for #1, indicate reason(s) why
this was not completed:

Are you on pace to screen all outfalls twice during the permit term? Yes No

2. For renewal permittees, indicate the percent of outfalls screened during the reporting period: 45%

Are you on pace to screen all outfalls once during the permit term? Yes No

-8-

3800-FM-BPNPSM0491 Rev. 4/2014
MS4 Annual/Progress Report

3. For all permittees, indicate the percent of outfalls screened that revealed dry weather flows: 0%

4. Did any dry weather flows reveal color, turbidity, sheen, odor, floating or submerged solids? Yes No

5. If Yes for #4, attach all sample results to this report with a map identifying the sample location. Explain the corrective action(s)
taken in the attachment.

6. Do you use the “Outfall Reconnaissance Inventory / Sample Collection Field Sheet” provided in the permit?

Yes No

If No, attach a copy of your monitoring form.

BMP #5: Enact a stormwater management ordinance (municipal entities) or develop an SOP (non-municipal entities) to
implement and enforce a stormwater management program that includes prohibition of non-stormwater discharges to
the regulated small MS4.

Measurable Goal: Within the first year of coverage under the permit, new permittees shall enact and implement an ordinance
from an Act 167 Plan approved by the Department in 2005 or later, the MS4 Stormwater Management Ordinance; or an ordinance
that satisfies all applicable requirements in a completed and signed MS4 Stormwater Management Ordinance Checklist. (For
non-municipal permittees, new permittees shall develop and implement a Standard Operating Procedure (SOP) within the first
year of coverage).

Renewal permittees must continue to maintain, update, implement, and enforce a Stormwater Management Ordinance that
satisfies all applicable requirements. (For non-municipal permittees, the SOP satisfies this requirement. If no existing SOP exists,
it should be developed during the first year of coverage).

Measurable Goal: New permittees shall submit a letter signed by a municipal official, municipal engineer, or the municipal
solicitor as an attachment to their first year report certifying the enactment of an ordinance that meets all applicable requirements
of this permit. Renewal permittees shall update their existing ordinance, if necessary, and submit documentation of completion
to the Department. (For non-municipal permittees, submit the SOP to the first report).

1. Do you have an ordinance (municipal) or SOP or other mechanism (non-municipal) that prohibits non-stormwater
discharges? Yes No

If Yes, indicate the date of the ordinance or SOP: June 12, 2008

2. For new permittees only, attach an ordinance (or SOP) and letter from an official, engineer or solicitor that prohibits non-
stormwater discharges to the first report submitted to DEP.

3. If you are not a new permittee, did you complete and submit your ordinance (or SOP) and letter from an official, engineer or
solicitor that prohibits non-stormwater discharges to DEP? Yes No

4. Were there any violations of the ordinance during the reporting period? Yes No

If Yes, describe what enforcement actions were taken for each violation:

Melrose Place Subdivision E & S Inspection - lack of temporary stabilization of areas where earth disturbance had stopped
for more than 4 days, maintenance of rock construction entrances per plan - Berks County Conservation District gave 20
days to comply.
106 Koller Road - stormwater and debris from private driveway washing onto Township Road. First 20 feet of driveway must
be paved.

BMP #6: Provide educational outreach to public employees, business owners and employees, property owners, the
general public and elected officials (i.e., target audiences) about the program to detect and eliminate illicit discharges.

Measurable Goals: During each year of permit coverage, appropriate educational information concerning illicit discharges shall
be distributed to the target audiences using methods outlined under MCM #1. If not already established, set up and promote a
stormwater pollution reporting mechanism (e.g., a complaint line with message recording) by the end of the first year of permit
coverage for the public to use to notify you of illicit discharges, illegal dumping or outfall pollution. Respond to all complaints in a

-9-

3800-FM-BPNPSM0491 Rev. 4/2014
MS4 Annual/Progress Report

timely and appropriate manner. Document all responses, include the action taken, the time required to take the action, whether
the complaint was resolved successfully.

1. Was IDD&E-related information distributed to public employees, businesses, and the general public during the reporting

period? Yes No

If Yes, what was distributed? Newsletters, calendar

2. Is there a well-publicized method for employees, businesses and the public to report stormwater pollution incidents?
Yes No

3. Do you maintain documentation of all responses, action taken, and the time required to take action? Yes No

MCM #4 – CONSTRUCTION SITE STORM WATER RUNOFF CONTROL

Are you relying on PA’s statewide program for stormwater associated with construction activities to satisfy this MCM?

Yes No (If No, complete all remaining questions for this MCM; if Yes, skip to MCM #5).

BMP #1: Develop your program consisting of all procedures necessary to comply with the requirements of this MCM.
Your program shall provide for construction stormwater permitting, construction inspection, and enforcement of
installation and maintenance of the necessary E&S control measures. Your program shall describe clearly how your
program will be coordinated with DEP’s NPDES Construction Stormwater Permitting program.

Measurable Goals: For new permittees, the written program for this MCM shall be developed during the first year of permit
coverage; nevertheless, you are responsible for implementation of this MCM during entire term of this permit, including the time
you are developing your program.

For all permittees, your program shall be reviewed and updated during each year of permit coverage. The purpose of the written
program is to establish clear roles and responsibilities for the implementation of the MCM #4 requirements. An agreement
between the permittee, the CCD, and any other resources to be used by the permittee that clearly defines roles for each entity
is recommended. If an agreement is made, you shall place and keep a written copy in your file, consistent with the Retention of
Records requirements in this Permit. Please note that in accordance with Section A.2.h in Part A of the Authorization to
Discharge, as the permittee you are responsible to ensure that implementation of all requirements under this Permit are fulfilled.

1. For new permittees only, attach the written stormwater associated with construction activities program to the first report
submitted to DEP.

2. If you are not a new permittee, did you complete and submit your written stormwater associated with construction activities
program to DEP? Yes No

If Yes, provide the latest submission date:

3. Date of last update or revision to the stormwater associated with construction activities program:

BMP #2: The permittee shall enact, implement, and enforce an ordinance to require the implementation of erosion and
sediment control BMPs, as well as sanctions to ensure compliance.

Measurable Goal: Within the first year of coverage under the permit, new permittees shall enact and implement an ordinance
that meets all applicable requirements of this permit. (Non-municipal permittees shall develop and implement an SOP).

Measurable Goal: Permittees shall submit a letter signed by a municipal official, municipal engineer or the municipal solicitor as
an attachment to their first periodic report certifying the enactment and implementation of a stormwater management ordinance
that meets all requirements of this permit.

1. For new permittees only, attach an ordinance (or SOP) and letter from an official, engineer or solicitor that addresses
stormwater associated with construction activities to the first report submitted to DEP.

2. If you are not a new permittee, did you complete and submit your ordinance (or SOP) and letter from an official, engineer or
solicitor that addresses stormwater associated with construction activities to DEP? Yes No

- 10 -

3800-FM-BPNPSM0491 Rev. 4/2014
MS4 Annual/Progress Report

If Yes, provide the latest submission date:

- 11 -

3800-FM-BPNPSM0491 Rev. 4/2014
MS4 Annual/Progress Report

BMP #3: Develop and implement requirements for construction site operators to control waste at the construction site
that may cause adverse impacts to water quality. While sediment is the most common pollutant of concern for MCM #4,
there are other types of pollutants that also can be a concern and the intent of this BMP is to address these other types
of pollutants, such as, but not limited to, discarded building materials, washout from concrete trucks, chemicals, litter,
and sanitary waste.

Measurable Goal: New permittees shall establish requirements to address this BMP by the end of the first year of permit
coverage. Renewal permittees shall continue to implement existing requirements and update as necessary. This could be
implemented by written municipal ordinance/code provisions, by standard notes on the site plans, by any other written format
that accomplishes the objectives of this BMP, or by any combination of these measures. The goal of this BMP shall be
communicated to construction site operators during pre-construction meetings. This BMP shall be implemented during each year
of the MS4 permit. Permittees must prepare and maintain records of site inspections, including dates and results and you must
maintain these records in accordance with the Retention of Records requirements in this Permit.

1. Identify the mechanism(s) in place to regulate construction site operators and wastes produced at construction sites:

2. During the reporting period what has been the results of implementing the mechanism(s) described above?

BMP #4: Develop and implement procedures for the receipt and consideration of public inquiries, concerns, and
information submitted by the public (to the permittee) regarding local construction activities. The permittee shall
demonstrate acknowledgement and consideration of the information submitted, whether submitted verbally or in
writing.

Measurable Goal: Permittees shall establish and implement a tracking system to keep a record of any submitted public
information as well as your response, actions, and results. This BMP shall be implemented during each year of coverage under
this General Permit and information should be submitted with the each periodic report.

Describe the tracking system established for documenting public information concerning local construction activities and describe
responses taken during the reporting period:

MCM #5 – POST-CONSTRUCTION STORM WATER MANAGEMENT IN NEW DEVELOPMENT AND REDEVELOPMENT

Are you relying on PA’s statewide program for MCM #5 BMPs #1 - #3? Yes No
(If No, complete all remaining questions for this MCM; if Yes, skip to BMP #4)

BMP #1: Develop a written procedure that describes how the permittee shall address all required components of this
MCM. Guidance can be found in the Pennsylvania Stormwater Best Management Practices Manual.

Measurable Goal: The written procedure shall be developed by the end of the first year of permit coverage and be reviewed and
updated every permit year thereafter, as needed. The intent of BMP #1 is for the permittee to describe how the listed tasks will
be accomplished.

1. For new permittees only, attach your written procedure for post-construction management to the first report.

2. If you are not a new permittee, did you complete and submit your written procedure for post-construction management to
DEP? Yes No

If Yes, provide the latest submission date:

3. Date of last review or update of post-construction management procedure:

- 12 -

3800-FM-BPNPSM0491 Rev. 4/2014
MS4 Annual/Progress Report

BMP #2: Require the implementation of a combination of structural and/or non-structural BMPs that are appropriate to
the local community, that minimize water quality impacts, and that are designed to maintain pre-development runoff
conditions. This requirement can be met by ensuring that the selected BMPs comply with the municipal Stormwater
Management Ordinance that meets the requirements of the permit.

Measurable Goal: All qualifying development or redevelopment projects shall be reviewed to ensure that their post-construction
stormwater management plans and selected BMPs conform to the applicable requirements. A tracking system (e.g., database,
spreadsheet, or written list) shall be maintained to record qualifying projects and their associated BMPs. In your records, you
shall note if there are no qualifying projects in a calendar year.

1. Number of development or redevelopment projects in urbanized area during reporting period:

2. Describe the tracking system in place:

3. Describe the structural and/or non-structural BMPs that were required for these projects:

BMP #3: Ensure that controls are installed that shall prevent or minimize water quality impacts.

Measurable Goal: All qualifying development or redevelopment projects shall be inspected during the construction phase to
ensure proper installation of the approved structural PCSM BMPs. A tracking system (e.g., database, spreadsheet, or written
list) shall be implemented to track the inspections conducted and to track the results of the inspections (e.g., BMPs were, or were
not, installed properly). Permittees not relying on DEP’s statewide QLP to satisfy requirements under this BMP shall summarize
construction inspections and results in periodic reports. See BMP #6 for requirements related to post-construction inspection and
tracking of PCSM BMPs to ensure that the operation and maintenance plan is being implemented.

If there were development or redevelopment projects during the reporting period, attach documentation of inspections of PCSM
BMPs to this report.

BMP #4: The permittee shall enact, implement, and enforce an ordinance (municipal) or SOP or other regulatory
mechanism (non-municipal) to address post-construction stormwater runoff from new development and redevelopment
projects, as well as sanctions and penalties associated with non-compliance, to the extent allowable under State or
local law.

Measurable Goal: Within the first year of coverage under this permit, new permittees shall enact and implement a stormwater
management ordinance (municipal) or SOP (non-municipal) that meets the requirements of this General Permit.

Measurable Goal: All permittees shall submit a letter signed by a municipal official, municipal engineer or the municipal solicitor
as an attachment to their first periodic report certifying the enactment of a stormwater management ordinance that meets the
requirements of this General Permit.

1. Do you have an ordinance (or SOP) to address post-construction stormwater runoff from new and redevelopment projects
and does it include sanctions? Yes No
If Yes, indicate the date of the ordinance or SOP: June 12, 2008
For new permittees only, attach a copy of the ordinance or SOP.

2. If you are not a new permittee, has the ordinance (or SOP) been submitted to DEP with a letter from an official, engineer or
solicitor that certifies the enactment of an ordinance or SOP for PCSM activities? Yes No

3. Do you have authority to take enforcement action for failure to properly operate and maintain stormwater practices/facilities?
Yes No

- 13 -

3800-FM-BPNPSM0491 Rev. 4/2014
MS4 Annual/Progress Report

BMP #5: Develop and implement measures to encourage and expand the use of Low Impact Development (LID) in new
and redevelopment. Measures also should be included to encourage retrofitting LID into existing development. DEP’s
Pennsylvania Stormwater Best Management Practices Manual provides guidance on implementing LID practices.

Measurable Goal: In your inventory of development and redevelopment projects authorized for construction since March 10,
2003, that discharge stormwater to your regulated MS4s, indicate which projects incorporated LID practices and for each project
list and track the BMPs that were used.

Measurable Goal: Enact ordinances consistent with LID practices and repeal sections of ordinances that conflict with LID
practices. Progress with enacting and updating your ordinances to enable the use of LID practices shall be summarized in the
periodic reports.

1. Identify ordinances enacted or updated during the reporting period to ensure consistency with LID practices:

No new ordinances

BMP 6: Ensure adequate operation and maintenance of all post-construction stormwater management BMPs installed
at all qualifying development or redevelopment projects (including those owned or operated by the permittee).

Measurable Goal: Within the first year of coverage under this permit, new permittees shall develop and implement a written
inspection program to ensure that stormwater BMPs are properly operated and maintained. The program shall include sanctions
and penalties for non-compliance. All permittees shall review and update the inspection program annually and shall continue to
implement this BMP.

Measurable Goal: An inventory of PCSM BMPs shall be developed by permittees and shall be continually updated during the
term of coverage under the permit as development projects are reviewed, approved, and constructed. This inventory shall include
all PCSM BMPs installed since March 10, 2003 that discharge directly or indirectly to your regulated small MS4s. The inventory
also should include PCSM BMPs discharging to the regulated small MS4 system that may cause or contribute to violation of
water quality standard. The inventory shall include:
• all PCSM BMPs that were installed to meet requirements in NPDES Permits for Stormwater Discharges Associated with

Construction Activities approved since March 10, 2003;
• the exact location of the PCSM BMP (e.g., street address);
• information (e.g., name, address, phone number(s)) for BMP owner and entity responsible for BMP Operation and

Maintenance (O&M), if different from BMP owner;
• the type of BMP and the year it was installed;
• maintenance required for the BMP type according to the Pennsylvania Stormwater BMP Manual or other manuals and

resources;
• the actual inspection/maintenance activities for each BMP;
• an assessment by the permittee if proper operation and maintenance occurred during the year and if not, what actions the

permittee has taken, or shall take, to address compliance with O&M requirements.

1. For new permittees only, attach the written inspection program to ensure that stormwater BMPs are properly operated and
maintained.

2. If you are not a new permittee, did you complete and submit your written inspection program to ensure that stormwater BMPs
are properly operated and maintained to DEP? Yes No
If Yes, provide the latest submission date: May 17, 2017

3. How do you ensure that stormwater BMPs are properly operated and maintained? Explain if you rely on means other than
municipal inspections to ensure adequate O&M (consistent with your stormwater ordinance).
Inspections

4. Date that inspection program was last reviewed or updated: April 2017

5. Total number of sites with PCSM BMPs installed as of the date of this report: 25

6. Total number of sites inspected during this reporting period: 3

7. Number of sites found to have PCSM BMP deficiencies: 2

8. Number of enforcement actions taken during this reporting period: 0

- 14 -

3800-FM-BPNPSM0491 Rev. 4/2014
MS4 Annual/Progress Report

MCM #6 – POLLUTION PREVENTION / GOOD HOUSEKEEPING

BMP #1: Identify and document all facilities and activities that are owned or operated by the permittee and have the
potential for generating stormwater runoff to the regulated small MS4. This includes activities conducted by contractors
for the permittee. Activities may include the following: street sweeping; snow removal/deicing; inlet/outfall cleaning;
lawn/grounds care; general storm sewer system inspections and maintenance/repairs; park and open space
maintenance; municipal building maintenance; new construction and land disturbances; right-of-way maintenance;
vehicle operation, fueling, washing and maintenance; and material transfer operations, including leaf/yard debris pickup
and disposal procedures. Facilities can include streets; roads; highways; parking lots and other large paved surfaces;
maintenance and storage yards; waste transfer stations; parks; fleet or maintenance shops; wastewater treatment
plants; stormwater conveyances (open and closed pipe); riparian buffers; and stormwater storage or treatment units
(e.g., basins, infiltration/filtering structures, constructed wetlands, etc.).

Measurable Goal: By the end of the first year of permit coverage, new permittees shall identify and document all types of
municipal operations, facilities and activities and land uses that may contribute to stormwater runoff within areas of municipal
operations that discharge to the regulated small MS4. Renewal permittees should have completed this list during the previous
permit term. For all permittees, this information shall be reviewed and updated each year of permit coverage, as needed. Part of
this effort shall include maintaining a basic inventory of various municipal operations and facilities.

1. Have you identified all facilities and activities owned and operated by the permitee that have the potential to generate
stormwater runoff into the MS4? Yes No

2. When was the inventory last reviewed? February 2017

3. When was it last updated? February 28, 2017

4. How many new facilities and/or activities were added to this inventory during this reporting period? 1

BMP #2: Develop, implement and maintain a written operation and maintenance (O&M) program for all municipal
operations and facilities that could contribute to the discharge of pollutants from the regulated small MS4s, as identified
under BMP #1. This program (or programs) shall address municipally owned stormwater collection or conveyance
systems, but could include other areas (as identified under BMP #1). The O&M program(s) should stress pollution
prevention and good housekeeping measures, contain site-specific information, and address the following areas:

• Management practices, policies, procedures, etc. shall be developed and implemented to reduce or prevent the
discharge of pollutants to your regulated small MS4s. You should consider eliminating maintenance-area
discharges from floor drains and other drains if they have the potential to discharge to storm sewers.

• Maintenance activities, maintenance schedules, and inspection procedures to reduce the potential for pollutants to
reach your regulated small MS4s. You also should review your procedures for maintaining your stormwater BMPs.

• Controls for reducing or eliminating the discharge of pollutants from streets, roads, highways, municipal parking
lots, maintenance and storage yards, waste transfer stations, fleet or maintenance shops with outdoor storage
areas, and salt / sand (anti-skid) storage locations and snow disposal areas.

• Procedures for the proper disposal of waste removed from your regulated small MS4s and your municipal
operations, including dredge spoil, accumulated sediments, trash, household hazardous waste, used motor oil, and
other debris.

Measurable Goal: During the first year of permit coverage, new permittees shall develop and implement a written O&M program
that complies with BMPs #1 and #2. Renewal permittees shall continue to implement their existing program. All permittees shall
review the O&M program annually, edit as necessary, and continue to implement during every year of permit coverage.

1. For new permittees only, attach the written O&M program to the first Annual Report.

2. If you are not a new permittee, did you complete and submit your written O&M program to DEP? Yes No
If Yes, provide the latest submission date: May 17, 2017

3. Date of last review or update to O&M program: February 28, 2017

- 15 -

3800-FM-BPNPSM0491 Rev. 4/2014
MS4 Annual/Progress Report

BMP #3: Develop and implement an employee training program that addresses appropriate topics to further the goal of
preventing or reducing the discharge of pollutants from municipal operations to your regulated small MS4s. The
program may be developed and implemented using guidance and training materials that are available from federal, state
or local agencies, or other organizations. Any municipal employee or contractor shall receive training. This could
include public works staff, building / zoning / code enforcement staff, engineering staff (on-site and contracted),
administrative staff, elected officials, police and fire responders, volunteers, and contracted personnel. Training topics
should include operation, inspection, maintenance and repair activities associated with any of the municipal operations
/ facilities identified under BMP #1. Training should cover all relevant parts of the permittee’s overall stormwater
management program that could affect municipal operations, such as illicit discharge detection and elimination,
construction sites, and ordinance requirements.

Measurable Goal: During the first year of permit coverage, new permittees shall develop and implement a training program that
identifies the training topics that will be covered, and what training methods and materials will be used. Renewal permittees shall
continue to operate under their existing program. All permittees shall review the training program annually, edit it as necessary,
and continue to implement it during every year of permit coverage.

Measurable Goal: Your employee training shall occur at least annually (i.e., during each permit coverage year) and shall be fully
documented in writing and reported in your periodic reports. Documentation shall include the date(s) of the training, the names
of attendees, the topics covered, and the training presenter(s).

1. For new permittees only, attach the written training program to the first Annual Report.

2. If you are not a new permittee, did you complete and submit your written training program to DEP? Yes No
If Yes, provide the latest submission date: May 17, 2017

3. Date of last review or update to training program: January 17, 2017

4. Identify the date(s) of employee training, the names of attendees, the topics covered, and the training presenters:
February 8, 2017 at Albright College, Reading, PA
Attending: Katelyn Gruber
Topics covered - Your MS4 Responsibilities by Ashley Showers, Berks County MS4 Committee

June 28, 2016 at Crown Plaza, Reading PA
Attending: Diane Hollenbach
Topics Covered: PA DEP MS4 Workshop - Preparing for Your Next Permit Application by PA DEP

May 26, 2016 at Lower Heidelberg Township Building, Sinking Spring PA
Attending: Greg Wolfe, Keith Shuman, Brian Wise, Tyler Nolt
Topics Covered: Public Works MS4 Audit Preparedness Workshop Pollution Prevention and Good Housekeeping
by Berks County MS4 Steering Committee

May 25, 2016 at Reading Area Water Authority Office, Reading PA 19604
Attending: Diane Hollenbach
Topics Covered: Lake Ontelaunee Source Water Protection Plan updates and strategies for improvements to the
Maiden Creek Watershed. Participants were the RAWA Source Water Protection Committee, Lyn O'Hare ran the
meeting.

February 22, 2017 PSATS Webinar
Attending: Keith Shuman, Gregory Wolfe, Tyler Nolt, Andrew Letsche, Brian Wise
Topics Covered: Stowem Water Control for Municipal Garages

- 16 -

3800-FM-BPNPSM0491 Rev. 4/2014
MS4 Annual/Progress Report

BEST MANAGEMENT PRACTICES (BMPs)

Provide an assessment of the appropriateness of the BMPs implemented to date, and identify any steps that will be taken to
address deficiencies in the BMPs or make changes to BMPs or other aspects of the SWMP developed by the permittee.

MS4 TMDL Plan Chesapeake Bay Pollutant Reduction Plan (CBPRP)

Is the permittee required to develop an MS4 TMDL Plan? Is the permittee required to develop a CBPRP?
Yes No
Yes No

What is the status of the TMDL Design Details What is the status of the CBPRP (if applicable)?

(if applicable)?

Under Development (Due Date: 09/16/2017) Under Development (Due Date: )

Submitted to DEP (Submission Date: December 31, Submitted to DEP (Submission Date: )
2015)
Approved by DEP (Approval Date: )

Approved by DEP (Approval Date: )

For permittees with DEP-approved MS4 TMDL Plans and/or CBPRPs, describe progress with implementing BMPs and other
activities identified in those plans:

For permittees with DEP-approved MS4 TMDL Plans and/or CBPRPs, complete the section below. Identify the required pollutant
reductions (for those with MS4 TMDL Plans) or pollutant reductions committed to by the permittee (for those with CBPRPs) and
the cumulative reductions achieved through implementing the BMPs, as of the end of the reporting period:

- 17 -

3800-FM-BPNPSM0491 Rev. 4/2014
MS4 Annual/Progress Report

BMP INVENTORY

List all new structural BMPs installed and ongoing non-structural BMPs implemented in the urbanized area during the reporting period that are being used toward
achieving load reductions in the permittee's MS4 TMDL Plan and/or CBPRP. Provide a name or description for each BMP, the area, in square feet (sf) that drains to
each BMP (drainage area (DA)) (if applicable), the location of the BMP (latitude and longitude), the name of the water body that receives discharges from the BMP (if
applicable), the date the BMP was installed or implemented, and whether the BMP was completed pursuant to an NPDES permit for stormwater associated with
construction activities or other NPDES permit (check box if done under an NPDES permit).

BMP Name / Description DA (sf) Latitude Longitude Receiving Waters Date Installed or NPDES
Implemented Permit?

°’” °’”

°’” °’”

°’” °’”

°’” °’”

°’” °’”

°’” °’”

°’” °’”

°’” °’”

°’” °’”

°’” °’”

°’” °’”

°’” °’”

°’” °’”

°’” °’”

°’” °’”

°’” °’”

- 18 -

3800-FM-BPNPSM0491 Rev. 4/2014
MS4 Annual/Progress Report

OTHER REQUIRED REPORT ELEMENTS

Identify the progress towards achieving the statutory requirements of reducing the discharge of pollutants to the Maximum Extent
Practicable (MEP) and complying with water quality standards.
The Township's TMDL Plan has not been approved but we have begun the first step of the plan which involves compiling
information about the ownership and uses of the properties in the drainage area and information of existing private and
public storm sewer facilities has been compiled into a comprehensive view of the subshed draining to Outfall Number
050 on Lake Ontelaunee. The Township Manager and Engineer met with Scott Arwood to discuss the unique nature of
the TMDL area.

Provide a summary of stormwater activities planned during the next reporting cycle (not identified previously in this report):
Inspect outlets
Inspect drains and rehab drains in Limestone Village and Shadow Ridge Developments
Replace W Walnut Tree Drive storm water pipe that is crushed
Vacuum leaves from streets in November
Sweep streets of salt and cinder in April
Attend training
Continue public education
Apply for new permit
Provide a summary of notices, intergovernmental agreements and other relevant documents if the permittee is relying on another
governmental entity to satisfy any of its permit obligations
Maidencreek Township participates in the Berks County MS4 Steering Committee which is authorized by
intergovernmental agreement. There is also a Memorandum of Understanding with the Berks County Conservation
District to provide the service of MCM#4 which was revised and adopted on February 9, 2017.

- 19 -

3800-FM-BPNPSM0491 Rev. 4/2014
MS4 Annual/Progress Report

CERTIFICATION

I certify under penalty of law that this document and all attachments were prepared under my direction or supervision
in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the
information submitted. Based on my inquiry of the person or persons who manage the system or those persons
directly responsible for gathering the information, the information submitted is, to the best of my knowledge and
belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fine and imprisonment for knowledge of violations. See 18 Pa. C.S. § 4904 (relating to
unsworn falsification).

Diane Hollenbach Signature
Name of Responsible Official Date

610-926-4920
Telephone No.

- 20 -