MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS
September14,2017
ENGINEER'SAGENDA
SubdivisionReviewStatusChecklist
NextSupervisorsMeetingOctober12,2017.
Subdivision/Zoning/ LDP
Plans currently in review.
Folino Warehouse LDP-SketchPlan reviewed August mtg.
Maidencreek TV &Appliance-Sketch Plan reviewed August mtg.
MelrosePlace-Stormwater/Grading
Revised gradingplanprepared byBerks Surveying.
Met with Folino and three (3) property owners.
Folinoto continuemeetingw/propertyowners.
Projects
StormwaterProjects
Ina/Rt.73-Lindbergh/Adele-onhold.
West Shore Drive
Meet with inspector for state on Tues.,Aug.23 regarding Bridge Inspection.
Report.
Repairs are somewhat extensive; Twp.Involvement is possible
Three (3) 60" dia.Pipes required as alternative to existing opening.Not
desirable due to maintenance.
Twp.to make repairs as schedule permits.
Street Lighting
Investigation of light intensity ongoing; drone camera pictures of Spirit Ct.&
Ontelaunee Heights completed.
Page 1 of 2
I:\Projects/MaidencreekTownship|17-0019-0100\Engineer'sAgendal9.14.17.docx
2017StreetProject
Contract"A"and“B";Awarded to H&K Group for total base bid of
$374,256.75.Notice to Proceedissued.
Application for Payment#1 in theamountof $213,985.15recommended for
BoSapproval.
Paving complete for Contract“A"and"B".
Application forPayment #2 inthe amount of $105,847.62 recommended for
B0Sapproval.(10%retainage,$35,536.99held)
MS4
SDEpreparingPRP(PollutionReductionPlan)fortheWillowCreek,TMDLfor
Lake Ontelaunee, and NOl (Notice of Intent).
Final plan submittedtoDEPpriorto September16,2017deadline bytheTwp.
ChestnutSt.Crosswalk
Coordinating traffic study counts/speed with police department.
Traffic speed posted @25MPH;85th percentile from N.Berks Regional Police
is 26 MPH.
Reviewing site distance, lighting requirement & no parking restrictions.
SubdivisionImprovementLOC/EscrowRelease
SewageEnforcementOfficerActivityReport
Page 2 of 2
I:\Projects\MaidencreekTownship|17-0019-0100\Engineer'sAgenda\9.14.17.docx
WATKINSARCHITECTLTD
PRESIDENT:JOHNC.WATKINS
WATKINS
POSTOFFICEBOX412
FLEETWOOD,PA19522
RWISYNERGETICS
PHONE:(610)944-5536
FAX:(610)944-5539
ARCHITECT
WWW.WATKINSARCHITECT.COM
WWW.SYNERGETICS-ARCHITECTS.COM
Tuesday, September 12, 2017
Maidencreek Township
Attn:DianeHollenbach
1 Quarry Road, P.0. Box 319
Blandon, Pa 19510
RE:
MAIDENCREEKTV&APPLIANCE
PLANNINGCOMMISSIONFOLLOW UPQUESTIONRESPONSE
Dear Board of Supervisors,
We met with the Planning Commission last week and believe that the following Zoning Ordinance
Sections may apply to the above referenced project, eliminating the requirement to go through a full
land development process. This proposed process would allow the owner to give clear direction to
PennDOT, moving ahead with architectural drawings and be able to stay in business during construction
within the township. The italic text below is the text from your Ordinance Requirements, followed by
our responses:
At the discretion of the applicant, a subdivision proposal may be initially submitted to the Township as a final
plan provided that:
I) Not More than three parcels, lots or tracts of land are to be created from the original tract;
WAresponse: Complies, property is oneparcel
2) No development is proposed other than a single-family dwelling and uses customarily accessory to such a
dwelling;
WA response: Complies, No subdivision of property is proposed
3) All proposed lots will have frontage upon and access to an existing public road; and [1]
[1] Editor's Note: amended at time of adoption of code (See Ch. I General Provisions, Art. II).
WA response: Complies, property has lot frontage and access to roads
4) No public improvements are to be constructed;
WA response: No public improvements proposed, work would be by PennDot
B) The plan shall contain all details and information required by 190-17 of this chapter, specifically including the
results of soil percolation tests.
WAresponse:Will beProvided
C) When a sketch plan or a preliminary plan as submitted contains all of the data and information required by
this chapter for a final plan and meets all the other requirements of a final plan, the Board of Supervisors may,
upon advisement of the Township Planning Commission, review and consider such sketch plan or preliminary
plan as a final plan and approve the same plan as a final plan and endorse such plan to become a record plan.
WA response: This would be our proposed approach
D) Nothing in this section shall be interpreted to compel the Board of Supervisors to accept an initial submission
as a final plan, nor to deem a sketch plan or preliminary plan a final plan submission, regardless of completeness
of data provided therewith.
WA response: We will request to Board of Supervisors
E) The Board of Supervisors may entertain a waiver of full compliance with all of the plan review and approval
provisions of Article IV of this chapter for submissions that meet all of the following provisions and conditions:
[Added 7-15-2009 by Ord. No. 218]
WA response: We will request to Board of Supervisors
(l) Criteria for exemption. A plan for which the purpose is to provide a change in use on an existing
developed tract of land.
WA response: N/A, no proposed change of use to existing developed tract of land.
(a) The proposed use must have been permitted in that zoning district, or approved by prior
variance or court order. No use that requires a special exception or conditional use will qualify
for this exemption.
WA response: No proposed change of use to existing developed tract of land.
(b) There is no subdivision of land or annexation of land proposed.
WA response: No subdivision or annexation proposed
(c) There will be no public improvements constructed.
WA response: Public improvements provided by PennDot
(d) There will be no change to the building footprint or increase to impervious area.
WA response: Proposed changes to building footprint and impervious area shall
comply. Existing building foot print to decrease by +/- 1,500 s.f. and total existing
impervious area to decrease by +/-5,860 s.f.
(e) There are no documented or known public health or safety issues with the existing tract of
land.
WA response: Complies, No known public health or safety issues.
() There will be no change to the method, direction or increase in rate of stormwater leaving the
property.
WA response: Shall comply, engineered drawings will be provided for site
modifications to document no change to the method, direction or increase in rate of
stormwater leaving the property.
(g) Any increase in traffic mush be documented and such impact on existing streets and
neighboring properties mitigated.
WA response: Complies, No traffic increase, existing use to remain.
(h) The proposed use cannot cause public safety issues: vibration, air quality, electromagnetic,
fire and explosive, radioactive material, glare and heat, nonradioactive liquid and solid waste.
WA response: Complies, No change in existing use
(2) Submission and review procedures.
WA response: Shall Comply
(a) A complete plan and zoning application shall be submitted to the Township along with fees as
set forth in the Township Fee Schedule. [2]
[2] Editor's Note: The current Fee Schedule is on file in the Township offices.
WA response: Completed plan & zoning application along with fee will be provided
(b) The plan shall be reviewed and commented on by the following agencies:
WAresponse: We will submit forreview
1 1) Maidencreek Township Planning Commission and Zoning Officer
[2) Maidencreek Township Authority (if in the public water and sewer area of the
Township); and
[3] Maidencreek Township Fire Marshal
(c) The plan shall be reviewed by the Board of Supervisors.
WA response: We will submit for review
(d) A zoning permit, which lists any conditions imposed by the Board of Supervisors when
granting plan approval, shall be issued to the applicant by the Zoning Officer. The approved plan
will not be recorded but will be attached to the zoning permit and kept on file in the Township
Office.
WA response: We will submit for review
(e) When the applicant has completed any and all conditions imposed by the Board of
Supervisors for plan approval and all proposed work set forth in any zoning and building
permits, the Zoning Officer will do a final inspection of the property. Upon passing the final
inspection, a certificate of Occupancy will be issued by the Zoning Officer to the property owner
for the new use.
WA response: OK
(3) Plans shall at a minimum provide information to show compliance with the following Zoning
Ordinance regulations:
WA response: Engineered drawings will be provided to comply with the items listed below:
(a) Area and bulk regulations.
WA response: Min. lot area per unit of use = 20,000 s.f.; provided +/-74,000 s.f.
Min. lot width at street line = 100 ft; provided +/-280 ft
Min lot width at building line = 100 ft; provided +/-310 ft
Min front, side, rear yard = comply/following ex. non-conforming
Max. extent of impervious surface = 65%; Provided +/-60%
Max. building size = 25,000 ft; Provided +/-15,360 ft
(b) Parking and truck loading requirements per 220-60
WA response: Complies, 5 spaces per 1000 s.f. GFA, sales floor area of
+/-7,500 s.f = 38 requred spaces (46 spaces proposed) Truck loading space also
proposed
(c) Performance standards per 220-62
WA response: Will be provided to comply
(d) Additional regulations per specific use per 220-64 thru 220-76
WA response: Will be provided to comply
(4) In addition to showing compliance with all the above provisions, the plan shall also shown the
following information:
WA response: Engineered drawings will be provided to comply with the items listed below:
(a) Name and address of recorded owner and developer.
(b) State the existing use and the proposed use of the property including all accessory uses.
(c) Total tract boundary with bearing and distances
(d) Existing features including but not limited to: [NOTE: An existing “as-built" land
development plan may be used to satisfy the requirements of subsection E(4)(d).J
WA response: Engineered drawings will be provided to comply with the items listed
below:
{ 1 Streets, Driveways, parking areas, sidewalks.
[2) Utilities (electric, water, sewer, gas) public and private.
[3] Stormwater facilities
[4) Buildings and all impervious surfaces
[5] Lighting
[6} Screening and buffering
{7) Solid Waste Disposal/pick-up
(e) Proposed features which are a modification from the existing features.
WA response: Engineered drawings will be provided to shall comply
(fThe change in traffic from the existing use to the proposed use may be shown using the Trip
Generation Manual published by the Institute of Transportation Engineers or a similar
publication.
WA response: No change in existing use
(g) Name and Address of the person preparing the plan.
WA response: Will be provided
(h) Calculations and/or additional information shall be submitted with the plan as required to
satisfy the above listed items.
WA response: Engineered drawings will be provided to comply
(5) Nothing in this section shall exempt the applicant from securing any and all required local, state and
federal permits and approvals, including but not limited to planning modules, erosion and sediment
control permits, driveway highway occupancy permit, prior to issuance of plan approval or zoning permit
issuance.
WA response: PennDot has driveway on their construction plans. No change/increase to
sewer.We will submit & secure E &S and Zoningpermits
Please feel free to call if you have any questions on this response.
Sincerely,
John C. Watkins
Watkins Architect LTD
cc.File
SYSTEMSDESIGN
SDE
"A Possion for Engineering Excellence"
ENGINEERING,INC
sdei.net
September12,2017
MaidencreekTownship
P.O.Box319
Blandon,PA19510
Attn:
TownshipBoardof Supervisors
Re:
2017AnnualRoadProject-ContractsAandB
PaymentApplication#2
DearSupervisors:
We reviewed Payment Application#2 submitted by H&K Group, Inc.for the above referenced
project. Based on our review, the work performed to date is satisfactory, and we recommend
payment toH&K Group,inc.foran amount of$105,847.62,whichiscomprised of$104,164.62for
ContractAands1,683.ooforContractB.Enclosedaretwocopiesofthepaymentapplicationform
for execution by the Board.
The original contract price awarded for Contracts Aand B is s$374,256.75.The actual total cost for
thecompletedprojectis$355,369.75.The requestedpaymentisforpavingworkcompleted after
Payment Application #1 on W.Wesner Road and Blandon Avenue (Contract A). In addition,
remaining contract balance is $35,536.98, which is the 10% retainage for the completed work.
Ifyouhaveanyquestions,pleasedo nothesitateto contactus.
Sincerely,
SystemsDesign Engineering, inc.
Craig Momose, P.E.
Director of Civil Engineering
Enclosures
Cc:
TomUnger,P.E.-TownshipEngineer
SDEOffice/ConstructionObservationFile
I:/Projects\MaidencreekTownshipl17-0019-01152017AnnualRoadProject/PaymentApplicationslPayAppl#2Letter-ContractsA&B.docx
1032JamesDrive,Leesport,PA19533.P:610.916.8500.F:610.916.8501
Schuylkill Haven,PAe5.570.385.5549
Boyertown,PA.P:610.369.1319
Fystems Design Engineering
2Pages
Page 1 of 2
5/26/2017
$374,256.75
$374,256.75
$0.00
$355369.75
$319,832.78
$213,985.15
$105,847.62
$35,536.98
Application is madeforpayment,as shown below,in connection with the Contract.
.2017
8-31-2017
qM-041A
9/12/17
APPLICATION NO:002
Maidencreek Township
PERIODENDING:8
CONTRACT DATE:
$35,536.98
00'0$
$35,536.98
September
PROJECT NO:
H&K GroupInc
PROJECT NO:
COMMONWEALTHOF PENNSLVANIA
JENNIFER S.KRATZ,Notary Public
SkippackTwp.,MontgomeryCounty
Montgomery
day of
NOTARIALSEAL
TOTALCOMPLETED&STOREDTODATE
PROJECT: Maidencreek Twp.2017 Contract Aand B
BALANCETOFINISH,PLUSRETAINAGE
CONTRACT SUM TO DATE (LINE 1+2)
NETCHANGEBYCHANGEORDERS
10.00%of CompletedWork
of Stored Material
6.TOTALEARNEDLESSRETAINAGE
County of:
5th
(Line6from prior Certificates)
Total Retainage (Line 5a +5bor
1.ORIGINALCONTRACT SUM
Total in coiumn Iof Page 2)
APPLICATIONANDCERTIFICATEFORPAYMENT
Continuation Sheet is attached.
(Line 4 less Line5Total)
CURRENTPAYMENTDUE
Subscribed and sworn to before me this
(Column G on Page 2)
RECEIVED
(Line 3 less Line 6)
PENNSYLVANIA
SEP - 7 2017
My Commission expires:
RETANAGE
Notary Public:
State of:
0.00
0.00
$0.00
DEDUCTIONS
Date:09/05/2017
contractor's knowledge, information and belief the work covered
0.00
0.00
ADDITIONS
H. Christian Budenz, Vice-Pres,/Asst.Sect.
Maidencreek Township
H& Grodp Inc
Blandon,PA,19510
Skippack,PA19474
Paving
CHANGEORDERSUMMARY
H&K GroupInc
DateApproved
Net Change by Change Orders
P.0.Box 196
P.O. Box 319
Total
Change Orders approved
ApprovedThis Month
CONTRACT FOR:
inpreviousmonths
H&K Group Inc
CONTRACfOR:
herein is now due.
Totals
FROM:
Number
TO:
BY:
Balance To Finish
Amount
Page 2 of 2 Pages
Quantity
12822.6
14234.27
62401.25
39702.6
2280
3645
13865.35
12066.6
4830
45270.48
790
20751.9
14284.6
18689
870
2745
17126.6
30924
36200.5
1870
355,369.75
ToDate
Amount
OWNER:Maidencreek Township
CONTRACTOR: H&K Group Inc
Complete
426.000
Quantity
195.660
785.910
1.000
136.470
50.000
2.028.000
40.000
1,449.000
558.550
1.000
442.000
473.000
220.000
1.000
122.000
5,154.000
9,014.000
478.210
1.000
12822.6
14234.27
62401.25
2280
3645
4830
13865.35
790
870
1870
117,608.47
Amount
This Application
426
195.66
Quantity
785.91
136.47
Amount
45270.48
39702.6
12066.6
20751.9
14284.6
18689
2745
17126.6
30924
36200.5
237.761.28
08/23/2017
qM-041A
Previous Applications
JOB NO.:
1449
2028
558.55
442
Quantity
220
122
5154
9014
DATE:
478.21
$12.943.00
$20,370.00
$1,860.25
$2.280.00
$61,932.00
$5,103.00
$4,830.00
$12.192.00
$39.730.00
$12.673.50
$42.146.00
$790.00
$22.536.00
$15.704.00
$870.00
$18.689.00
$4.160.00
$19.684.00
$378.00
$2.475.00
$4.004.00
$31.080.00
$35,579.00
$378.00
$374,256.75
Total Amount
430
280
780
120
2130
520
1450
480
520
Quantity
220
110
5180
10360
470
Widen Shoulder3"Depth@
Remove&Replace Soft&Y
EmulsifiedAsgphaltCss-1h
Base Repair 4"25mm 0-
BaseRepair4"25mm0-.
Remove&Replace Soft&Y
Description
Scratch Wearing9.50-3
Base Repair 4"25mm0-
Road Widening 10"6"2A
25mm0
Cold in Place Recycling 5"
Class 4Type BGeotexti
Maidencreek Twp.2017Contract AandB
Variable Depth Miling 6'
9.5"Wearing11/2"0-.
7B Class 4Type B Geotexti
Wearing11/2"0-.
9.5"Wearing11/2"0-
Wearing 11/2"0-.
9.5"Wearing11/2"0
Pavement Markings
Markings
Pavement Markings
Pavement Markings
Shoulder Backup
Paving Geotextile
Base Repair 4"
PROJECTTOTAL:
Pavement
9.5"
Bond
1A
Item No.
0800-0010
0800-0020
0800-0030
0800-0040
0800-0050
0800-0100
0800-0110
0800-0080
0600-0080
0800-0120
0800-0130
0800-0140
0800-0060
0800-0150
0800-0160
0800-0220
0800-0170
0800-0180
0800-0190
0800-0200
0800-0210
0800-0230
0800-0240
0800-0250
0800-0260
002
NAMEOFPROJECT:
APPNUMBER
30.10
72.75
79.40
53.15
2,280.00
72.90
120.75
101.60
27.40
5.95
790.00
Unit Price
81.05
46.95
30.20
84.95
22.50
6.00
870.00
104.00
4.20
75.70
1.90
1.870.00
100.10
4.20
SUMMARY
IMPROVEMENTAGREEMENTSINVOICES
APPROVEDFORPAYMENT
MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS
SEPTEMBER14,2017
INVOICE NO.
DATEOFINVOICE/PAYEE
AMOUNT
1.MelrosePlace
8/31/17 Maidencreek Twp.-Re: SDE, Inc.
89163
$588.41
AMOUNTDUE
$588.41
TOTALAMOUNTDUE
$588.41
I:/ProjectsiMaidencreekTownshiplmprovementAgreement Summaries/2017/8.10.17-Copy.doc
projects/maidencreek/17-0019-0300/seoactivity
Chk #
Billed/Paid
Paid in June
to Date By
Fee Paid
Applicant
$1,225.00
Applicant/Activity
MAIDENCREEKTOWNSHIP
SEOACTIVITYREPORT
8/1/17-8/31/17
replacementseptic system.
t, admin/fling.
requirements.
SEO report,
App.#
Z193211
17-0019-0300
17-0019-0473
SDE
17-0019-0300
T. Unger 2 copies
8/22/2017
SEO Desk
8/1/2017
Date
Cc: