Board of Supervisors

Minutes — September 14, 2017

Date
September 14, 2017
Type
Minutes
Year
2017
File
PDF · 164 KB

Download original Open in browser

Document text

Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 2,163 words

Maidencreek Township Board of Supervisor Meeting
September 14, 2017

Present: David Franke, Joseph Rudderow III, Tom Unger – Systems Design Engineering, Inc.,
Eugene Orlando, Jr. – Orlando Law Offices, Diane Hollenbach – Township Manager

Absent: Claude Beaver,

John Watkins, Dan Sutton, Brian Sutton, Kim Seidel, David Boulin, Victoria Solberg, Francis
Scott, Heidi Fiedler, Jim Schoellkopf, Kerry Eckert, Angie Jakebauski – Adult and Teen
Challenge

Joseph Rudderow III called the September 14, 2017 regular meeting of the Maidencreek
Township Board of Supervisors to order at 7:15 pm in the Maidencreek Township Municipal
Building and asked everyone to rise for the Pledge to the Flag.

MINUTES &
FINANCES
Approval of the Meeting Minutes
A motion was made by David Franke to waive the reading of the minutes and approve the
minutes for the August 10, 2017 regular meeting adding Victoria Solberg’s name to guests
attending. Joseph Rudderow III seconded the motion and it passed unanimously.

Treasurer’s Report and Bill List
A motion was made by David Franke to approve the August 2017 Treasurer’s Report

and Bill List. Joseph Rudderow III seconded the motion and hearing no questions on the
motion, it passed unanimously.

2018 Minimum Municipal Obligation
A motion was made by David Franke to approve Resolution 16-2017 for the 2018

Minimum Municipal Obligation for the nonuniformed employee pension in the amount of
$20,000. Joseph Rudderow III seconded the motion and hearing no questions on the motion, it
passed unanimously.

PUBLIC COMMENT
Dennis Fink, 325 W Walnut Tree Drive, Blandon questioned the completion of the W Walnut Tree
Drive project and the final property restoration. The Public Works foreman will be in contact.

David Boulin stated he had a comment and a question about the ongoing issue at 317 Sofia Blvd.
with the swale and topology. The issue may be coming to a close one way or another. Mr. Boulin
gave a synopsis of the issue from July 2016 to date, outlined the items requested from the developer
(arborvitaes, regrading of the lot, changes to the swale slope/need for a retaining wall) and stated
that Mrs. Solberg has still not had a response from the Folinos on her issues. Mr. Boulin asked how
the Board planned to proceed. Chairman Rudderow stated that the Township cannot be responsible
for how someone choses to run their business. The swale is on private property and drains to a basin.
Mr. Unger stated that there will be no dedication of a storm water easement to the Township. There
is an operation and maintenance note on the plan. Chairman Rudderow stated the Township
Engineer would reach out and ask for the remedy of the grading of the swale but the other issues are
private property issues and the Township has no position on them. Mr. Boulin asked for a timeline
for the developer to come into compliance. Mr. Orlando stated that he thought the developer is
waiting for the residents to agree to the plan for the swale. Mr. Boulin asked for a Memorandum of

1

Maidencreek Township Board of Supervisor Meeting
September 14, 2017

Understanding. He wanted a response in writing to the Solberg proposal to the developer. Chairman
Rudderow stated that the Board could not do this as that is a private property issue. Mr. Boulin
asked that it be put into the record that they have substantiated to the tune of a thousand dollars that
the contours of the property do not match the subdivision plan. They will henceforth require
something in writing from the developer. The question again was asked how the Township will
respond about the swale. Mr. Unger stated that the best outcome is for the developer to cooperate
with the Township and proceed with the work per the plan and not for the Township to do the work.
Mr. Unger will reach out to Stephano Folino to get a date and will report back to the Board on the
response. Mr. Boulin asked if Mr. Folino does not respond how will the Township proceed. Mr.
Unger said the Township is not in the position to make that decision yet.

Angie Jakebauski, Pennsylvania Adult and Teen Challenge introduced herself and the PA Adult and
Teen Challenge Program, which has a donor supported non-faith based drug and alcohol detox center
and short term clinical program as well as 24/7 transportation. Literature was left with the Township
on new programming for residents.

Heidi Fiedler, 432 E Wesner Road, Blandon stated the Township has enforcement over the swale on
Solberg’s property that is not built according to plan and questioned the Township’s enforcement of
the Notice of Violation (NOV) to the Melrose Place Developer. Mr. Unger, Township Engineer
responded that he sent a letter to the developer outlining deficiencies and it was not a NOV. Mr.
Rudderow pointed out that the letter did get the developer to a meeting and started dialog. Ms.
Fiedler stated that the developer was given thirty (30) day and that had passed. The Township should
follow up and take stronger action.

REPORTS
ENGINEER’S REPORT
Maidencreek TV and Appliance – John Watkins from Watkins Architect presented a site plan
proposal for the relocation of the Maidencreek TV and Appliance showroom as an addition to the
existing warehouse. The new building will be smaller than the existing square footage. There
will be some green space. The zoning officer, Terry Naugle reviewed the proposal and was not
concerned with the setbacks. When the new building is constructed, the existing showroom will
be demolished and that area will be Penn DOT right of way and parking. Mr. Watkins asked to
proceed through the modified land development planning process as allowed in the Township
Zoning Ordinance. Chairman Rudderow stated that he realized the Route 222 road project
brought challenges to the land owners through no fault of their own. Maidencreek Township is
excited and glad Maidencreek TV and Appliance has decided to stay in the Township. Jim
Schoellkopf, Jr., Planning Commission Chairman stated that Planning Commission was concerned
with the timing of the road construction and the parking lot for the building. Chairman Rudderow
asked what the timeline is to complete the project. Mr. Sutton stated that Penn DOT has given the
deadline of August 2018. Mr. Unger asked who is handling the Highway Occupancy Permit. Mr.
Watkins stated that Penn DOT will obtain the HOP for two access points to Route 222.

Chairman Rudderow stated the Township has a business and employer that wants to stay in the
Township. The Township should be as open as we can to make this move along. The Board
realized that there would be unique challenges that would have to be taken on a case by case basis
due to the Route 222 project. David Franke agreed that the Township would do everything we
can to make this move along. Mr. Unger will arrange a meeting with the owner, Berks Surveying
and Watkins Architects to discuss the process moving forward.

Chestnut Street Crosswalk – Mr. Unger reported the speed data has been received. The lighting

2

Maidencreek Township Board of Supervisor Meeting
September 14, 2017

issue and a no parking issue needs to be reviewed. There will be a full report in October.

Route 73 and Route 222 Traffic Signal Plan – Mr. Unger reviewed the plans and reported that
there are turn lanes and arrows in all directions. The Board agreed to proceed with the resolution
and signing of the mylar plans.

2017 Street Project – Mr. Unger recommended the Supervisors approve for payment application
#2 in the amount of $105,847.62. This includes a 10% retainage.

A motion was made by David Franke to approve application #2 for payment to H & K for
$105,847.62. Joseph Rudderow III seconded the motion and hearing no questions on the motion,
it passed unanimously.

Letter of Credit Release Letters
A motion was made by David Franke to authorize the chairman to sign the Letter of Credit

release letters in the amount of $588.41. Joseph Rudderow III seconded the motion and hearing
no questions on the motion, it passed unanimously.

SOLICITOR’S REPORT
Agricultural Security Hearing – Mr. Orlando stated the hearing was completed at 7 p.m. for
the 7-year review of the Agricultural Security Area. Two additions to the area are proposed.
Mr. Orlando will have the meeting transcribed.

A motion was made by David Franke to adopt Resolution 17-2017 completing the 7-
year review of the Agricultural Security Area with additions and corrections. Joseph Rudderow
III seconded the motion and hearing no questions on the motion, it passed unanimously.

Penn DOT Round About Maintenance Agreement – The Board reviewed the Round About
Agreement. Paragraph 4b on page 3 was stricken. This paragraph required the Township to
clear the splitter island and sidewalks of snow and ice. The Board authorized the Manager to
send the agreement to Penn DOT and ask how they thought the Township would be able to
clear splitter islands in the busy intersection that could be loaded with frozen slush from Penn
DOT plows.

MANAGERS REPORT
Diane Hollenbach reported that she is working with Met Ed on the Melrose Place street light
resolution.

Blandon Avenue – The Board reviewed the letter and asked that the police be advised of the
speeding situation and asked for more enforcement and use of the speed sign. The engineer and
manger were asked to research signage that might help the situation such as one way during
certain times of day.

Zoning - Mrs. Hollenbach reported that 115 Grove is scheduled to settle on October 26th. The
Berks County Redevelopment Authority is the purchaser.

Emergency Services
A motion was made by David Franke to approve and sign the Emergency Notification

and Resource Manual. Joseph Rudderow III seconded the motion and hearing no questions on
the motion, it passed unanimously.

3

Maidencreek Township Board of Supervisor Meeting
September 14, 2017

The staff continues to work on joint workers compensation insurance with Leesport Borough.

Chairman Rudderow commented that the Northern Berks Regional Police Department had an
audit performed due to the change in leadership. The audit went well and the accounts are in
good order. There were minor recommendations. Also, a budget meeting is scheduled for
September 19th.

David Franke reported that he attended the ambulance meeting. Everything is moving forward
quite well. The police department parking lot is being used for standby. Mr. Franke asked if
there is a possibility of space at the Maidencreek Township municipal building.

Park & Recreation
Cameras – tabled.

BUSINESS
NPDES Permit Application

A motion was made by David Franke to authorize the manager to sign and submit the
NPDES permit application. Joseph Rudderow III seconded the motion and hearing no questions
on the motion, it passed unanimously.

Animal Rescue League Contract 2018
A motion was made by David Franke to authorize the chairman to sign the 2018 Animal

Rescue League Contract. Joseph Rudderow III seconded the motion and hearing no questions
on the motion, it passed unanimously.

Trick or Treat Night
A motion was made by David Franke to designate October 31 from 5p.m. to 9p.m. as

Trick or Treat night. Joseph Rudderow III seconded the motion and hearing no questions on the
motion, it passed unanimously.

Schaeffer Road Bridge
A motion was made by David Franke to authorize the manager to sign the Schaeffer

Road Bridge Temporary Easement Agreement. Joseph Rudderow III seconded the motion and
hearing no questions on the motion, it passed unanimously.

Union Contract
A motion was made by David Franke to authorize the Board of Supervisors to sign the

Nonuniformed Employee Collective Bargaining Agreement. Joseph Rudderow III seconded the
motion and hearing no questions on the motion, it passed unanimously.

Verizon Vehicle Monitoring
A motion was made by David Franke to authorize the manager to sign the quote for the

purchase of eight vehicle monitoring devices at a cost not to exceed $1,500 through Verizon
Netfleet. Joseph Rudderow III seconded the motion and hearing no questions on the motion, it
passed unanimously.

Christmas Closure
A motion was made by David Franke to authorize the Township office to be closed

4

Maidencreek Township Board of Supervisor Meeting
September 14, 2017

between December 25 to January 1st subject to call out for weather related incidences. Joseph
Rudderow III seconded the motion and hearing no questions on the motion, it passed
unanimously.

A motion was made by David Franke, seconded by Joseph Rudderow III, to adjourn the
September 14, 2017 meeting of the Maidencreek Township Board of Supervisors. Hearing no
questions on the motion, all members voted “Aye”. Motion carried. Meeting adjourned at 9:35
p.m.

Township Secretary,

Cc: Board of Supervisors
Eugene Orlando, Solicitor
Thomas Unger, Township Engineer
Planning Commission
Park & Recreation Board
Zoning Hearing Board and Alternates
Joan London, Zoning Hearing Board Solicitor
Maidencreek Township Authority
Patrick Donovan, Maidencreek Township Authority General Manager
Meagan Dompkowski, Maidencreek Township Authority Secretary
Daniel Becker, Authority Solicitor
Greg Unger, Authority Engineer
Barbara Hassler, Tax Collector
Daniel Miller, Blandon Fire Company Chief
Chief Brian Horner, Northern Berks Regional Police

5

Archived from the Maidencreek Township website. Reproduced unaltered; not an official records repository.