MAIDENCREEKTWP.PLANNINGCOMMISSION
P.O.BOX 319,BLANDON,PA 19510
January 4, 2018
Maidencreek Township Board of Supervisors
PO Box 319
Blandon, PA 19510
At their January 3, 2018 meeting, the Maidencreek Township Planning Commission
recommended by formal motion that the Board of Supervisors grant conditional preliminary plan
approval to the Berkshire Building Services Land Development Plan conditioned upon
satisfaction of the January 3, 2018 Systems Design Engineering, Inc. review letter, which is
incorporated by reference and Berks County Conservation District Erosion and Sedimentation
Plan approval.
Previously, at their December 6, 2017 meeting, the Planning Commission recommended
granting of the following waivers for the Berkshire Building Services Land Development Plan:
a waiver to Section 190-36 of the Maidencreek Township Code of Ordinances waiving
the requirement to place monuments. The Developer proposes to place steel pins on all
perimeter corners not marked and one concrete monument on the southern property
line.
a waiver to Section 182.17.C(9) of the Maidencreek Township Code of Ordinances
waiving reinforced concrete pipe for Basin 2 Outlet. The Developer proposes using high
density polyethylene pipe.
If you have any questions, please call me at (610) 926-4920.
Sincerely,
Ocame Dhlleach
Diane Hollenbach
Manager
Maidencreek Township
cc:
Berks Surveying and Engineering Inc.

SYSTEMSDESIGN
SDE
"A Passion for Engineering Excellence"
ENGINEERING,INC
sdei.net
January 3, 2018
Maidencreek Township Planning Commission
PO Box 319
Blandon PA 19510
Re:
Berkshire Building Services Development Plan
Preliminary Plan -- 2nd Review
Maidencreek Township
Berks County
Dear Planning Commission Members:
We are in receipt of a Preliminary Plan entitled Berkshire Building Services (BBS) Overall Site
Plan prepared by Berks Surveying & Engineering, Inc. The present owner of the tract is Jeffrey
and Carol Baum of Fleetwood and the equitable owner is Berkshire Property Management
Company, LLC of reading.
The site consists of 5.29 acres and is located in the "I Industrial District". The site fronts the
Norfolk Southern Rail Road tracks to the north, the Norfolk Southern abandoned rail road
property to the south and is accessed from West Wessner Road to the west. The Preliminary Plan
reflects a proposed warehouse with an office, a macadam parking lot and stone lot area. The site
is presently wooded however many trees have been removed from the site to date.
The plan submittal consists of 6 sheets as follows:
TITLE
SHEETNUMBER
DATE
REV.
BBS Overall Site Plan
LD 101
11-22-17
12-20-17
BBS Layout Plan
LD 102
11-22-17
12-20-17
BBS Grading/Utility Plan
LD 103
11-22-17
12-20-17
BBS Existing Site Plan
LD 104
11-22-17
12-20-17
BBS Detail Sheet
LD 105
11-22-17
12-20-17
BBS Detail Sheet
LD 106
11-22-17
12-20-17
BBS Sewer Detail Sheet
LD 107
12-20-17
We have reviewed the above referenced plan and have the following comments for your
consideration:
1032 James Drive, Leesport, PA 19533.P: 610.916.8500.F: 610.916.8501
Sehulkl rrven, PA  P 570 385 544
Bcvtitwn PA : p: 610 369 1319

Maidencreek Township Planning Commission
Re:
Berkshire Building Services LDP
Preliminary Plan 2nd Review
January 3, 2018
Page 2
Zoning:
1. Additional Regulations for All Districts. 220-55.D. Buildings to have access. Every
principal structure hereafter erected or moved shall be on a lot adjacent to a public street
or approved private street. Every building shall be located on its lot so as to provide safe
access for servicing and maintenance, for fire protection or other emergency vehicles, and
to provide off-street parking areas.
Plans should be submitted and reviewed by the Fire Marshall.
2. Performance Standards. Section 220-63.F.(3)(d). A lighting plan shall be prepared to
comply with the provisions specified within the Township's Subdivision and Land
Development Ordinance.
A Lighting Plan has been submitted with this submittal. The entrance will need to be
illuminated in accordance with the provisions of Section 186-47.A.(1). Building
Entrances to have a maintained Footcandle of 5.0 AvG.
SALDO:
1. Monuments and Markers. Section 190-36. A minimum of two monuments shall be
placed on each side of the development where the lot lines intersect the public right-of
way.
The applicant is requesting a Waiver from this section of the ordinance. The Planning
Commission made a recommendation to the Supervisors at the December 6th 2017
Planning Commission meeting to approve this waiver.
2. Erosion and Sediment Control. Section 190-41. An erosion and sediment control plan
will need to be submitted and approved by the Berks County Conservation District prior
to Final Plan approval.
The site has had extensive tree removal recently. The EsCP should address
stabilization of all disturbed areas.
SDE

Maidencreek Township Planning Commission
Re:
BerkshireBuilding Services LDP
Preliminary Plan 2nd Review
January 3, 2018
Page 3
3. Landscaping. Section 190-44. Although this parcel does not abut directly up against a
residential district, the Planning Commission should discuss additional landscaping
along the frontage of West Wessner Road.
4. Improvement Specifications. Section 190-31. An Improvements agreement will be
required prior to final plan endorsement by the Planning Commission and the Township
Supervisors.
Stormwater:
1. Erosion and Sediment Control Permitting. Section 182-11. The E&S and PCSM
Plans should be submitted with the land development plan for review. Evidence of
approval of the E&S and NPDES/Construction permit shall be provided to the Township
prior to earth disturbance activities.
2: Basin Standards. Section i82-17.C.(1) Emergency spillway stability should be
demonstrated. Calculations indicate stability for grass lining. Temporary linings should
be provided at a minimum, to aid in establishment of the grass. It is possible that this is
addressed on the E&s Plan, which has not yet been submitted to the Township.
3. Basin Standards. Section 182-17.C.(9) The applicant's engineer is requesting a waiver
of this section, to permit the use of high-density polyethylene pipe (HDPE) for the Basin
2 outlet, instead of reinforced concrete (RCP), as specified. This section allows for an
alternative to RCP, if properly installed and maintained privately.
4. Plan Content. Section 182-22.D.(1) Much of the curb formerly proposed has been
eliminated. A segment of curb remains along the driveway's north edge, to convey
driveway runoff into Basin 1. Paving has also been eliminated within the driveway,
leaving curbed gravel, which leads to concerns including rutting and/or ponding along the
curb line. Paving is recommended along the curbed portion of the driveway.
In addition, calculations for the slope into Basin 1 downstream of the end of curb indicate
stability for grass lining, but temporary lining should be provided to aid in establishment
of grass.
5. Operations and Maintenance Agreement. Section 182-32. The property owner shall
sign an O&M agreement with the Township addressing the terms cited in this section,
prior to final plan approval.
6. Stormwater Management Easements. Section 182-33.B. Stormwater easement(s)
shall be provided as specified in this section. Note 29 has been added to LD101,
SDE

Maidencreek Township Planning Commission
Re:
Berkshire Building Services LDP
Preliminary Plan 2nd Review
January 3, 2018
providing a “blanket" easement for access and inspection. The Township Solicitor
should review this proposal for adequacy.
Additional Comments:
1. Public sewer connection and availability are being reviewed by the Maidencreek
approval.
2. Landscaping should be discussed with the Planning Commission for the area fronting
West Wessner Road.
3. The sides of the entrance drive are quite steep and could pose a hazard to cars and trucks
entering and exiting the site. The developer should give some consideration to this
possible hazard.
Sincerely,
SYSTEMS DESIGN ENGINEERING, INC.
el Kgprclt 
Ed Kopicki
Township Planning Consultant
Cc:
Maidencreek Township Supervisors
Diane Hollenbach, Twp. Manager
Eugene Orlando Jr., Twp Solicitor.
Berks Surveying & Engineering
Jeffrey and Carol Baum
Berkshire Property Management Company, LLC
File 17-0024-0707
SDE

County of Berks
Planning Commission
(610)478-6300
BerksCountyServicesCenter
FAX: (610) 478-6316
633CourtStreet,14thFloor
Reading,PA 19601-4309
Lee C. Olsen, AIA, Chairman I Barry L. Schlouch, Vice-Chairman I Thomas C. McKeon, AICP, Secretary
Jodi L. Gauker I Peter F. Giorgi I Glenn R. Knoblauch I Douglas R. Myers I James C. McCarthy I Douglas Paul Rauch
Shannon L.Rossman,AiCP, Executive Director I J.Chadwick Schnee,Esq.,First Asst.County Solicitor
December 15,2017
MaidencreekTownship
Diane Hollenbach
1 Quarry Road
P.O. Box 319
Blandon, PA 19510
Re:
Berkshire Building Services
File #: 37-13207
Plan #: 1615-37-17 (6 Sheets; LD101-LD106)
Dated: 11-22-17
PIN#:5410-11-66-9940
Dear Ms. Hollenbach,
The Berks County Planning Commission staff has reviewed the Preliminary Plan as
submitted for the above captioned land development. The tract is located along the east side of
West Wesner Road and the south side of the Pennsylvania Lines rail line, south of Park Road
(S.R.1010).
This plan is reviewed by the Berks County Planning Commission pursuant to Section
502 of the Pennsylvania Municipalities Planning Code. The Commission staff has not evaluated
the plan for compliance with local ordinances, unless so noted. The municipality must ensure
that the plan meets local zoning, subdivision and land development requirements, and any other
regulations. The following comments are added for consideration:
A.
Conformity of the plan with the Berks County Comprehensive Plan:
The site is located in an Existing Developed area. The proposed office/warehouse is
consistent with the Berks County Comprehensive Plan.
B.
General Planning Comments:
1. The township should make sure that the proposal meets applicable state and federal
MS4 (Municipal Separate Storm Sewer Systems) requirements and applicable
regulations of the approved Maiden Creek Watershed Act 167 Stormwater
Management Plan.
2. The Outlet Basin collects outfall from the Rip Rap area along West Wesner Road
and Storm Basins 1 & 2. The developer should ensure that the outfall from the
Outlet Basin does not erode the off-site area that leads to existing 60" RCP storm
pipe under the railroad tracks.

December15,2017
BerkshireBuilding Services
Page 2
3. The appropriate utility easements should be identified with bearings and distances
for all off-site lateral connections not located in the road right-of way.
4. A temporary construction easement should be provided for the placement of the off-
sitelateralconnections.
5. The proposal should ensure that adequate truck maneuverability has been provided
for internal site truck movements.
6. The developer should ensure that the proposed driveway turn radius is adequate for
truck ingress and egress movements to/from West Wesner Road.
7. Consideration should be given to providing the appropriate end treatment for the
existing guiderail along West Wesner Road at the driveway access.
8. Consideration should be given to providing guiderail along the curved section of the
proposed driveway where the slopes along the sides of the driveway are steep.
9. A clear sight triangle should be provided at the driveway access to ensure that the
proposed plantingswillbeappropriatelyplaced.
10. Erosion and sediment control measures where required under Title 25, Pennsylvania
Code, Chapter 102, Rules and Regulations of the Pennsylvania Department of
Environmental Protection, shall meet standards and specifications of the Berks
County Conservation District. The Berks County Conservation District should
approve the erosion and sediment control plan prior to final plan approval.
11. The local sewer authority should review the proposal relative to public sewer service
needs.
12. The township should be sure that applicable Americans with Disabilities Act
requirements are met.
13. The local fire official(s) and EMS should review the plan relative to fire
protection/emergency issues.
14. If a freestanding sign is to be associated with the proposed use, the plan should
provide its location and details.
15. Items concerning solid waste generated by normal daily activities should be specified
on plan. These should include location of storage area(s), screening type and
frequency of pick-up.
16.The plan notes that waivers have been requested.The note on the final plan should
be completed with the meeting date at whichthewaivers were considered.
C.
Standard Planning Comments -- not applicable.
The Berks County Planning Commission will review any additional submission of this
minimum of two prints should be delivered to the Berks County Planning Commission
for signature. One copy is retained by this office and one copy is forwarded to the
Mapping Office. Any additional copies for the municipality and the Subdivider or Developer will
be stamped. The Berks County Recorder of Deeds Office should be contacted at (610) 478-
3380 relative to any questions regarding recording requirements. The applicant has 90 days to
record the plan after the governing body approves the plan at a public meeting.

December15,2017
Berkshire Building Services
Page 3
PennDEP should consider this review as the Berks County Planning Commission's
review of the Planning Module required under Act 537. Those persons responsible for
preparing the Planning Module submission for PennDEP should include a copy of this review
with the module submission. Municipalities are advised that subdivision and/or land
development plans must be consistent with a DEP-approved planning module or official plan
revisions, or have been granted an exemption from planning by DEP prior to plan recording.
If there are any questions regarding this review, please contact me at (610) 478-6300
ext. 6305.
Sincerely,
miehel
Michelle D.Franklin
PlannerIll
Berks County Planning Commission
CC:
Maidencreek Township Planning Commission
MaidencreekTownship Engineer
Jeffrey B. & Carol A. Baum
Berkshire Property Management Co. LLC
Berks Surveying and Engineering, Inc.
PennDEP
www.countyofberks.com/planning

SYSTEMSDESIGN
SDE
"A Passion for Engineering Excellence"
ENGINEERING,INC
sdei.net
December 15, 2017
Maidencreek Township Authority
PO Box 289
Blandon PA, 19510
Re:
Folino Commercial
Public Sewer and Water Review
Maidencreek Township
Berks County, Pennsylvania
Dear Authority Members:
We are in receipt of the Plans entitled “Berkshire Building Services" prepared by Berks
Surveying & Engineering, Inc.
The site consists of 5.29 acres and situate in the “R-3" - District. The site is located along
West Wesner Road (T-777). The proposed Plan reflects a proposed warehouse with an
office, a macadam parking lot and stone lot area.
The plan submittal consists of 6 sheets as follows:
Sheet Title
Sheet Number
Date
Revision
Overall Site Plan
LD101
11-22-17
 Layout Plan
LD102
11-22-17
Grading/Utility Plan
LD103
11-22-17
Existing Site Plan
LD104
11-22-17
Detail Sheet
LD105
11-22-17
Detail Sheet
LD106
11-22-17
We have reviewed the above referenced plans and have the following comments for your
consideration:
Sewer
1. The Grading/Utility plan submitted shows a sewer lateral of approximately 475 feet
in length connecting the proposed warehouse/office to SSMH-80 on West Wesner
Road. However, the plan and detail sheets do not specify the pipe material, pipe
thickness, pipe diameter, and whether or not it is gravity or low pressure sanitary
sewer. Therefore, the following information should be provided in order to properly
review:
1032 James Drive, Leesport, PA 19533 . P: 610.916.8500. F: 610.916.8501
Schuylkill Haven, PAP: 570.385.5549
Boyertown, PAP: 610.369.1319

Maidencreek Township Authority
Page 2
Folino Commercial Sketch Plan Sewer and Water Review
December 15,2017
A profile shall be provided illustrating the proposed sewer lateral pipe material,
pipe thickness, pipe diameter, slope (if applicable), and length.
The profile shall include the crossing of the sewer lateral with the 60"
HDPE stormsewer pipe. The sewer lateral must meet the minimum
depth requirement of 3'-6" below grade and a minimum separation of
1'-6" between all utility crossings.
. If the proposed lateral_will_be-gravity sewer, .cleanouts (in accordance with
Authority standards) shall be installed and noted on plans every 50 feet and at all
changes in pipe direction. A detail of proposed cleanout shall be provided on the
Detail Sheet.
Provide concrete pad if cleanout/vent is located in paved area (in
accordance with Authority standards).
Cleanout/vent shall be installed /2"' above final grade in paved and
landscaped areas (in accordance with Authority standards).
If the proposed lateral will be low pressure sanitary sewer, the make, model,
location, and a detail of the grinder pump station shall be provided.
There is no information regarding the lateral's tie-in at SSMH-80. Provide a
detail illustrating the tie-in location and invert in respect with existing manhole
conditions (i.e. rim/channel inverts, step location, etc.). Ideally, lateral should tie-
in between 6"-12" above existing channel near the top of manhole bench. Clarify
the method for manhole/pipe adapter installation (Link-Seal, Kor-N-Seal Wedge
Korband Connector Assembly, etc.). All pertinent information shall be noted on
plans.
Provide trench backfilling detail of proposed sewer lateral in W. Wesner Road
Right-of-Way.
2. The proposed flow from the facility should be submitted to the Authority to calculate
the tapping fee. The sewer tapping fee using this flow rate will be $13.77/gpd for
this commercial property. In order for the Authority to bill for the sewer flows, a
meter will need to be installed on the water source. The quarterly sewer bills would
be based on the meter readings.
3. A planning module exemption will be required and should be submitted to the
Authority.
4. A note shall be added to the plan stating the proposed sewage flows for this facility
contain any non-domestic sewage, details will need to be submitted to the Authority
for review and approval.
SDE

Maidencreek Township Authority
Page 3
Folino Commercial Sketch Plan Sewer and Water Review
December 15, 2017
5. The Property Owner will be responsible for all applicable costs (tapping fees, review
fees, permit fees, etc.). The property owner will also be responsible for the cost and
installation of the meter. The meter will be provided by the Authority, but the size of
the meter needs to be determined by the property owner. A note shall be placed on
the plan stating that “"Additional fees may be required based on sewer use reviewed
on a yearly basis complying with all rules and regulations of the Maidencreek
Township Authority for tapping fees".
6. A Maidencreek Township road opening permit will be required for the proposed
sewer connection.
7. The proposed lateral shall be private and the sole responsibility of the Property
Owner.
Water
1. Proposed water line from well to warehouse is not shown. Provide plan view of
water line, including the pipe size and material.
2. Provide detail of proposed wellhead protection cover and concrete leveling pad.
3. A backflow prevention device is recommended to be provided to protect the ground
water source.
Due to the lack of information on this drawing set, this review should be considered
preliminary until more information is provided. The Authority reserves the right to add
additional comments based on further review.
If you should have any questions, please contact our office.
Sincerely,
Systems Design Engineering, Inc.
Pamela J. Stevens, P.E.
Authority Engineer
cc:
Maidencreek Township Supervisors
Maidencreek Township Planning Commission
Dan Becker, Esq.
Folino Construction Co., Inc.
Berks Surveying & Engineering
File 17-0466-0539
SDE