Other Township Records
Road Crew Report — March 2018
- Date
- Date unknown
- Type
- Report
- Year
- 2018
- File
- PDF · 73 KB
Document text
Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 244 words
Road Crew Report March 2018 March 1 - 2 • Crack sealing • Blow cinders off roads • Build form for headwall for Water Street • Assemble tool chest March 5 - 9 • Repair stop sign E Wesner • Troxel Road tree removal • Take Trucks 3, 4 and 6 for inspection • Take Truck 8 to Brinker’s for inspection • Plow and salt (Mar. 7) • Clean sidewalks • Wash trucks • Pour headwall • Replace stop sign Barlet and Hill • Repair shop light • Replace speed limit sign on West Shore • Flagger training March 12 - 16 • Collect trash • Crack sealing • Saw cut Water Street • Work on parking lot lights • Spring maintenance on mowers • Remove arm mower from tractor • Prepare signage for Water Street • Replace exhaust fans in bathrooms • Meeting with Conservation District regarding grant for Evansville Road drainage work • Took tractor to Adamstown for repair • Cleaned up garage bays March 19 - 23 • Leaf collection • Repair leaf vac • Water Street drainage repair • Plow and Salt (Mar. 21 - 22) • Wash trucks • Picked up cinders March 26 - 29 • Pick up ball field dirt • Bruch pick up • Removed blacktop and concrete from fill pile (MS4 audit action item) • Clean out garage bay at Fire Co ballfield • Wash back hoe and loader • Clean and open park restrooms