Keith Shuman would like spending approval for the following work orders:
#1
Replacing roof decking at Community Park Pavilion
$1,187.50
#2
Curb repair 233 Spirit Court
245.56
#3
Stain Community Park Pavilion
467.00
#4
Patch Hoch Road
826.20
#5
Repair drain at 128 Cornerstone Dr
721.55
#6
Grade Ridge Road to correct drainage
670.00
#7
Grade and add millings to correct drainage on Ridge Rd
310.00
#8
Grade Koller Road to correct drainage
620.00
#11
Repair drainage WWesner Rd
$1,711.30
#12
Repair drainage Schaeffer Rd
$1,286.80
#13
Repair inlet W Walnut Tree Drive
600.40
#14
Repairtravel lane Buena Vista Road
$2,780.00
#15
Repair drainage issues Evansville Road
$1,690.30
$13,116.61

WORKORDER-MAIDENCREEKTOWNSHIP
WORKORDER#
PO Box 319
1 Quarry Road
Blandon,PA19510
Problem
Root
fak
Pasttiun
Conmun.t
needs
dekins
Replci~s
Se
StatementofWork Needed
Deekns
i Reshinsle
Gnk
cap
Start Date:
End Date:
Budget Category:
Quantity
Unit Cost
MaterialsNeeded
Total
 300.
Shias)
Feit Drio edec et
732
Reatai
50
Toois t Faseato)
MANAGERAPPROVALOFEXPENDITURE

WORKORDER-MAIDENCREEKTOWNSHIP
WORKORDER#
PO Box 319
1 Quarry Road
Blandon, PA19510
Problem
CT
Q33
SPin,t
* Sec
StatementofWorkNeeded
Start Date:
End Date:
Budget Category:
Quantity
Materials Needed
Unit Cost
Total
80 /55
3995
Sakrete
48
$440.56
3. 97
110.56
lf"x 6'x1of.borexpns.on
5.00
MALAda
$ Q45. 56
PUBLICWORKSDIRECTORSIGNATUREWHENCOMPLETE
MANAGERAPPROVALOFEXPENDITURE

WORKORDER-MAIDENCREEKTOWNSHIP
WORKORDER#
POBox319
1 Quarry Road
Blandon, PA 19510
Problem
hald
omm
StaninJ
Statement ofWorkNeeded
STain)
Comple te
Start Date:
End Date:
Budget Category:
Quantity
MaterialsNeeded
Unit Cost
Total
Sta
332.
10
135.00
467.00
PUBLICWORKSDIRECTOR SIGNATUREWHENCOMPLETE
MANAGERAPPROVALOFEXPENDITURE

WORKORDER-MAIDENCREEKTOWNSHIP
WORKORDER#
PO Box 319
1 Quarry Road
Blandon, PA 19510
Problem
Hech f
R人
etiemc+
StatementofWorkNeeded
E+ ca Uate
Rad
食.
mAcAdam
and
Start Date:
End Date:
Budget Category:
Quantity
MaterialsNeeded
Unit Cost
Total
MAcadan
S 396.20
R.llc
Reta!
TAcK
50.
Rerd Suu
Ren tai
136
$ 326.20
PUBLICWORKSDIRECTORSIGNATUREWHENCOMPLETE
MANAGERAPPROVALOFEXPENDITURE

WORKORDER-MAIDENCREEKTOWNSHIP
WORKORDER#
POBox319
1 Quarry Road
Blandon,PA19510
Problem
Fa(lins
ornerstine
StatementofWorkNeeded
Repair
Macn dem
Start Date:
End Date:
Budget Category:
Quantity
Materials Needed
Unit Cost
Total
Rollec
Pavin5
S 230,00
AsokeI+
# 1α7.40
Rodd
8745:00
San
solhsbogs Sokrete
35
3.97
138.5
QuiKreteMertr M.x
G0 15s
5.10
10.do
PUBLICWORKSDIRECTORSIGNATUREWHENCOMPLETE
MANAGERAPPROVALOFEXPENDITURE

WORKORDER-MAIDENCREEKTOWNSHIP
WORKORDER#
PO Box 319
1 Quarry Road
Blandon,PA 19510
Problem
i>s
Hlcwins
Wate-
Dran
a +
Rase
StatementofWorkNeeded
Grade
remve
Shocid er
640
Start Date:
End Date:
Budget Category:
Quantity
Materials Needed
Unit Cost
Total
SKiclcaaecRental
Q Days
680
StrAwandSeed
50
$ Co10
PUBLICWORKSDIRECTORSIGNATUREWHENCOMPLETE
MANAGERAPPROVALOFEXPENDITURE

100
Google Maps
Kemmerer
Google
KemmererRd
Ridge
Ridge F
Kemmerer
Rd
Ridge
Ridge!
GoogleMaps
Ridge Rd
Ridge Rd
4/3/2018

WORKORDER-MAIDENCREEKTOWNSHIP
WORKORDER#
POBox319
1 Quarry Road
Blandon,PA19510
Problem
Standins
ecdse
* Se
StatementofWorkNeeded
Re -GrAde
ald
millinss
and
edse
300
Start Date:
End Date:
Budget Category:
Quantity
MaterialsNeeded
Unit Cost
Total
1l Skid /eade
Rente!
I day
310
$ 310
PUBLICWORKSDIRECTORSIGNATUREWHENCOMPLETE
MANAGERAPPROVALOFEXPENDITURE

20ft
Google Maps
shoreD
WShore
RidlsRei
https://www.go0gle.com/maps/@40.4701752,-75.9206513,58m/data=!3m1!1e3
GoogleMaps
4/3/2018

WORKORDER-MAIDENCREEKTOWNSHIP
WORKORDER#
POBox319
1 Quarry Road
Blandon, PA 19510
Problem
fiwvns
sheuider
Kolles
R人.
See
StatementofWorkNeeded
Re
o sef
'grade
Shovider
1043
Start Date:
End Date:
Budget Category:
Quantity
Unit Cost
Materials Needed
Total
Q days
1SKidlcad-
$(20
PUBLICWORKSDIRECTORSIGNATUREWHENCOMPLETE
MANAGERAPPROVALOFEXPENDITURE

https://www.google.com/maps/@40.4810738,-75.9297704,18z
4/3/2018
KollerRd
GoogleMaps
Ridge Rd
KollerRd
Ridge Rd
Ridge Rd
Waldo @DreamWorks Distribution Limited. All rights reserved. Map data @2018 Google
Google
Google Maps
Koller Rd
100ft

WORKORDER-MAIDENCREEKTOWNSHIP
WORKORDER#
POBox319
1 Quarry Road
Blandon,PA19510
Problem
W.Wesn(n
1+33
StatementofWorkNeeded
E+caunte
Shelde
Sco teyt.)c
Install
Stune
Tasal!
23
Geo sri
Plan+ GRAss
Start Date:
End Date:
Budget Category:
Quantity
MaterialsNeeded
Unit Cost
Total
6 
STonc
± 23  Shac
G-6o tevtl.
$ 171),30
PUBLICWORKSDIRECTORSIGNATUREWHENCOMPLETE
MANAGERAPPROVALOFEXPENDITURE

WORKORDER-MAIDENCREEKTOWNSHIP
WORKORDER#
12
POBox319
1 Quarry Road
Blandon,PA19510
Problem
StatementofWorkNeeded
Excauate
shscidn
Gce fe y l.lc
TAslal
Gecsr id
Ta stal!
Start Date:
End Date:
Budget Category:
Quantity
MaterialsNeeded
Unit Cost
Total
Stone
33
50
20
2 tn
25
Gea icdl
128
I58. 80
Seil Seed
PUBLICWORKSDIRECTORSIGNATUREWHENCOMPLETE
MANAGERAPPROVALOFEXPENDITURE

WORKORDER-MAIDENCREEKTOWNSHIP
WORKORDER#
13
PO Box319
1 Quarry Road
Blandon,PA19510
Problem
Ea+ching
w.th plow
inlet stiuchure
becquse sinking csphalt
br.dgeon
Rond
dowa flow side ot
above
Wolnud+iee
Wes+
Cfee k.
Statementof WorkNeeded
Remove + replace
Gspha l+ 。 pateh structurc w'th plantifop
Start Date:
End Date:
Budget Category:
Quantity
MaterialsNeeded
Unit Cost
Total
Rocd Sow
195.00
Pavin5
Roller
$d50.00
Asphg'i+
E1a7.40
Plonitoo X
$ 600, 40
PUBLICWORKSDIRECTORSIGNATUREWHENCOMPLETE
MANAGERAPPROVALOFEXPENDITURE

WORKORDER-MAIDENCREEKTOWNSHIP
WORKORDER#
-4
POBox319
1 Quarry Road
Blandon,PA19510
Problem
Road
Uista
StatementofWorkNeeded
Sectim of
eplace
Exc Aate
cspha/t
Sebasc
Com pac+
Insta l
mm
Isfu l!
88
Start Date:
End Date:
Budget Category:
Quantity
MaterialsNeeded
Unit Cost
Total
i0320
1246.00
R.ll
 250.02
Read
Su ind
19S.00
PUBLICWORKSDIRECTORSIGNATUREWHENCOMPLETE
MANAGERAPPROVALOFEXPENDITURE

50 ft
Waldo @DreamWorks Distribution Limited. All rights reserved. Imagery 2018 Google, Map data @2018 Google
Google Maps
Google
https:/www.g00gle.com/maps/@40.4799836,-75.8851539,124m/data=!3m1!1e3
Google Maps
4/3/2018

WORKORDER-MAIDENCREEKTOWNSHIP
WORKORDER#
POBox319
1 Quarry Road
Blandon,PA 19510
Problem
Drainase
Eunnsurlle
StatementofWorkNeeded
Instell
matftre sses
Bef-c
Pavtrs
Endt-
Drain
Start Date:
End Date:
Budget Category:
Quantity
Materials Needed
Unit Cost
Total
1AASHT0 # 3 Stone
$ id.50
300: 00
10 to1s
AASHTO #57 Stone
1d,50
1a5, 00
Nonwoven geotextle for tobric
# 333, 30
a"Corrugated Perforated pipe
13354.06
Pavinn oller
4 ±50,00
1gMm Asohalt
5 tons
430,60
 d53, 00
ZdA mdd
6 tons
98.75
$i.690.30
PUBLICWORKSDIRECTORSIGNATUREWHENCOMPLETE
MANAGERAPPROVALOFEXPENDITURE

Archived from the Maidencreek Township website. Reproduced unaltered; not an official records repository.