Board of Supervisors
Agenda — April 12, 2018
- Date
- April 12, 2018
- Type
- Agenda
- Year
- 2018
- File
- PDF · 2.9 MB
Document text
Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 2,073 words
MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS April 12, 2018 ENGINEER'SAGENDA SubdivisionReviewStatusChecklist Next SupervisorsMeetingMay10,2018 Subdivision/Zoning/LDP Plans currently in review. GSPPropertiesPreliminaryLDP-SeeMaidencreekTwp.PC4/5/18Itr.andSDE Itr.dated 3/6/18. BerkshireBuildingServicesFinal LDP-SeeSDEItr.dated3/5/18. Melrose Place-Stormwater/Grading Work on grading swale &properties is onhold due to weather Projects StormwaterProjects Ina/Rt. 73 - Lindbergh/Adele - on hold. Investigating storm Water control for QuarryRd.&Municipal Bldg.parking lot. Discuss plansandoptions-see attached parking requirements. WestShoreDrive Meet with inspector for state regarding Bridge Inspection. Report. Repairs are somewhat extensive;Twp.Involvement is possible Three (3) 60" dia. Pipes required as alternative to existing opening. Not desirable due to maintenance. Twp.to make repairs as schedulepermits. Dog Park Bids received and opened on March 1, 2018; Bid Tabulation,reviewed w/Bos. BOS awarded contract to Fehl's in the amount of $32,537. Intent to Award sent to Fehl's getting bonds & contracts together. 2018RoadProjects Advertised to receive bids and open bids on April 11 @ 10:00am: bids to be presented at the April 12 BOS meeting. MunicipalBldg.HVACSystem SDE did cursory inspection; will have report for BOS mtg. SubdivisionImprovementLOC/EscrowRelease Sewage EnforcementOfficerActivity Report-NoActivity Page 1of 1 I:\Projects\MaidencreekTownship|18-0019-0100\Engineer'sAgenda\4.12.18.docx Most Recent Letter Date 3/6/2018 2/8/2018 Review 3/5/2018 See SDE ltr.3/6/18 and MTPC ltr. 1/3/18&2/8/18 See SDE Itr. Dated 3/5/18 Comments P.C. Action Itr. 1/4/18 Dated 4/5/18 See SDE Itr. Approved BY BOS 02/08/18 BERKSCOUNTY (may reflect more than one extension) Extension 8I/S0/90 SUBDIVISIONSTATUS MAIDENCREEKTOWNSHIP, 4/12/2018 Period Ends 03/06/18 03/06/18 Review 90-Day 06/05/18 Review Period I:IProjectsIMaidencreek Townshipl18-0019-01001Subdivision Status14.12.18 12/06/17 12/06/17 90-Day Begins 03/07/18 Plan Stage Final Prel. LDP Prel. LDP LDP APPROVED/PENDINGPLANS: BerkshireBuilding Services Berkshire Building Services CURRENT PLANS: Project Name GSPProperties No. SYSTEMSDESIGN SDE "A Passion forEngineering Excellence" ENGINEERING,INC sdei.net March 6, 2018 Maidencreek Township Planning Commission POBox319 Blandon PA 19510 Re: Business Park at Maidencreek Land Development Plan Preliminary Plan Review #2 Maidencreek Township Berks County Dear Planning Commission Members: We are in receipt of a Preliminary Plan entitled Business Park at Maidencreek prepared by Stackhouse Bensinger Inc. (SBI) of Sinking Spring PA. The owner of the tract is GSP Properties-North Bethlehem, LLC of Allentown PA. The site consists of 9.4 acres and is located in the “CR-Commercial Residential District". The site is located along the south west side of Rt. 222, has 260 feet of frontage and is approximately 925 feet deep being rectangular in shape. A single access private drive/parking lot is being proposed through the center of the tract terminating in a cul-de-sac. There are 22 - 1,479 square foot office buildings being proposed in 11 duplexes with perpendicular parking provided fronting the units. The SBI plan submittal consists of 17 sheets as follows: TITLE PLAN NUMBER DATE REV. Cover Sheet C-1.1 11-27-17 2-21-18 Ex. Cond. Site Analysis C-2.1 11-27-17 2-21-18 Demolition C-3.1 11-27-17 2-21-18 Land Development C-4.1 11-27-17 2-21-18 Grading and Utility C-5.1 11-27-17 2-21-18 Landscaping C-6.1 11-27-17 2-21-18 Lighting C-6.2 11-27-17 2-21-18 Driveway, Storm, Sanitary Profiles C-7.1 11-27-17 2-21-18 Site Construction Details C-8.1 11-27-17 2-21-18 Site Construction Details C-8.2 11-27-17 2-21-18 Site Construction Details C-8.3 11-27-17 2-21-18 Site Construction Details C-8.4 11-27-17 2-21-18 Pre-Construction Cond. Plan C-PCC 11-27-17 2-21-18 PCSM and O&M Plan C-PCSM1 11-27-17 2-21-18 PCSMandO&MPlanDetails C-PCSM2 11-27-17 2-21-18 PCSM and O&MPlan Details C-PCSM3 11-27-17 2-21-18 1032JamesDrive, Leesport,PA19533。P:610.916.8500。F:610.916.8501 SchuylkillHaven,PAP:570.385.5549 Boyertown,PAP:610.369.1319 Maidencreek Township Planning Commission Re: Business Park at Maidencreek LDP PreliminaryPlanReview#2 March 6, 2018 Page 2 PCSM andO&M Plan Notes and Details C-PCSM4 11-27-17 2-21-18 Additional plans submitted is a set of PennDOT Highway Occupancy Permit (HOP) drawings, by Dimmerling Consulting, Inc., consisting of three (3) sheets as follows: TITLE PLAN NUMBER DATE REV. General Notes 17011 2of 4 Feb.2018 Typical Sections/Details 17011 3 of 4 Feb.2018 Construction Plan 17011 4 of 4 Feb. 2018 Also submitted and reviewed was a “Post-Construction Stormwater Management Plan Narrative, prepared by Stackhouse Bensinger Inc., dated February 21, 2018. We have reviewed the above referenced plan and have the following comments for your consideration: Zoning: 1. Additional Regulations for Commercial Use. Section 220-39-A. Where any property abuts a property the principal use of which is residential, regardless of whether the property is vacant or not, the owner of such property shall provide a screen planting in conformance with Section 220-64 along all property lines which abut the property used or zoned for residential purposes. Although the boundary of this tract presently contains many trees which screen the adjoining properties, the applicant should assure the Township that after the site is built, all areas on this tract adjacent to residential use shall remain screened or screening must be provided. A Note has been placed on the plan addressing this and should be reviewed by the Planning Commission. SALDO: 1. Erosion and Sediment Control. Section 190-41. An erosion and sediment control plan will need to be submitted and approved by the Berks County Conservation District prior to Final Plan approval. 2. Improvement Specifications. Section 190-31. An Improvements agreement will be required prior to final plan endorsement by the Planning Commission and the Township Supervisors. Stormwater Comments (Chapter 182 Stormwater Management): SDE Maidencreek Township Planning Commission Re: Business Park atMaidencreek LDP Preliminary Plan Review #2 March 6, 2018 Page 3 1. PennDOT Approval, Section 182-9.H. This project will need to be coordinated with PennDOT's S.R. 222 improvements. We will defer to PennDOT for authorization of work in and adjacent to their right-of-way. 2. Erosion and Sediment Control/NPDES Permit, Section 182-11. Evidence of approval of the E&S and NPDES permit applications by Berks County Conservation District shall be provided to the Township, prior to plan approval. A copy of the plan should be provided to the Township. 3. Storm Sewers, Section 182-17.D.(16) Rain water conductor outfalls into forebays should be evaluated for erosion protection (i.e., riprap aprons, etc.). We understand this will be provided with the erosion control plans. 4. Plan Detail, Section 182-22.D.(1) A detail of the flapgate should be provided. 5. BMP Operations and Maintenance, Section 182-32. An O&M agreement is required to be executed prior to plan approval. 6. Stormwater Easements, Section 182-33.B. Note 62 on plan sheet C-1.1 offers a “blanket" stormwater easement in favor of Maidencreek Township for inspection of the privately-owned stormwater BMPs. We have no objection to the blanket easement approach, but this should be approved by the Solicitor and Board of Supervisors. Additional Comments: 1. Landscaping should be discussed with the Planning Commission. Sincerely, SYSTEMS DESIGN ENGINEERING, INC Ed Kopicki Township Planning Consultant Cc: MaidencreekTownship Supervisors Diane Hollenbach, Twp. Manager Eugene Orlando Jr., Twp Solicitor. GSP Properties-North Bethlehem LLC Stackhouse Bensinger Inc. File17-0024-0708 SDE MAIDENCREEKTWP.PLANNINGCOMMISSION P.O.BOX319,BLANDON,PA19510 April 5, 2018 Maidencreek Township Board of Supervisors PO Box 319 Blandon,PA 19510 Dear Board, At their April 4, 2018 meeting, the Maidencreek Township Planning Commission recommended by formal motion that the Board of Supervisors grant preliminary plan approval the Business Park at Maidencreek Land Development Plan conditional upon compliance with the comments in the March 6, 2018 Systems Design Engineering, Inc. review letter which is incorporated by reference. Some item in the review letter are final plan items. If you have any questions, please call me at (610) 926-4920. Sincerely, DianeHollenbach Manager MaidencreekTownship cc: StackhouseBensinger SYSTEMSDESIGN SDE "A Passion for Engineering Excellence" ENGINEERING,INC sdei.net March 5, 2018 Maidencreek Township Planning Commission PO Box 319 Blandon PA 19510 Re: Berkshire Building Services Development Plan Final Plan--1st Review Maidencreek Township Berks County Dear Planning Commission Members: We are in receipt of a Final Plan entitled Berkshire Building Services (BBS) Overall Site Plan prepared by Berks Surveying & Engineering, Inc. The present owner of the tract is Jeffrey and Carol Baum of Fleetwood and the equitable owner is Berkshire Property Management Company, LLC of reading. The site consists of 5.29 acres and is located in the “I Industrial District". The site fronts the Norfolk Southern Rail Road tracks to the north, the Norfolk Southern abandoned rail road property to the south and is accessed from West Wessner Road to the west. The Final Plan reflects a proposed warehouse with an office, a macadam parking lot and stone lot area. The site is presently wooded however many trees have been removed from the site to date. The plan submittal consists of 7 sheets as follows: TITLE SHEETNUMBER DATE BBS Overall Site Plan REV. LD 101 11-22-17 BBS Layout Plan 02-09-18 LD 102 11-22-17 BBS Grading/Utility Plan 02-09-18 LD 103 11-22-17 BBS Existing Site Plan 02-09-18 LD 104 11-22-17 BBS Detail Sheet 02-09-18 LD 105 11-22-17 BBS Detail Sheet 02-09-18 LD 106 11-22-17 BBS SewerDetail Sheet 02-09-18 LD 107 12-20-17 BBS Lighting Plan PH 101 02-09-18 We have reviewed the above referenced plans and have the following comments for your consideration: 1032JamesDrive,Leesport,PA19533.P:610.916.8500.F:610.916.8501 SchuyikillHaven,PAeP:570.385.5549 Boyertown, PA P:610.369.1319 MaidencreekTownship Planning Commission Re: Berkshire Building Services LDP FinalPlan1stReview March 5,2018 Page 2 Zoning: No Comments. SALDO: 1. Erosion and Sediment Control. Section 190-41. An erosion and sediment control plan will need to be approved by the Berks County Conservation District prior to Final Plan approval. The site has had extensive tree removal recently. The ESCP should address stabilization of all disturbed areas. 2. Improvement Specifications. Section 190-31. An Improvements agreement will be required prior to final plan endorsement by the Planning Commission and the Township Supervisors. 3. Financial Security. Improvements Guarantee. Section 190-27.B.4. The Final Plan shall not be signed until the improvements guarantee has been executed. 4. Maintenance Guarantee. Section 190-27.E.(1). When Maintenance of stormwater retention facilities is to be the responsibility of the individual lot owner, the Board shall require that the maintenance responsibilities be set forth in perpetual covenants or deed restrictions binding on the land owners' successors in interest, and may further require that an initial maintenance fund be established in a reasonable manner. Stormwater: 1. Erosion and Sediment Control Permitting. Section 182-11. The E&S and PCSM Plans should be submitted with the land development plan for review. Evidence of approval of the E&S and NPDES/Construction permit shall be provided to the Township prior to earth disturbance activities. 2. Basin Standards. Section 182-17.C.(1) Emergency spillway stability should be demonstrated. Calculations indicate stability for grass lining. Temporary linings should be provided at a minimum, to aid in establishment of the grass. We understand this will be addressed on the E&S Plan, which has not yet been submitted to the Township. 3. Plan Content. Section 182-22.D.(1) Much of the curb formerly proposed has been driveway runoff into Basin 1. Paving has also been eliminated within the driveway, leaving curbed gravel, which leads to concerns including rutting and/or ponding along the curb line. Paving is recommended along the curbed portion of the driveway. SDE MaidencreekTownshipPlanningCommission Re: Berkshire Building Services LDP Final Plan 1st Review March 5, 2018 Page 3 In addition, calculations for the slope into Basin 1 downstream of the end of curb indicate stability for grass lining, but temporary lining should be provided to aid in establishment of grass. As above, we understand this will be addressed on the E&s Plan. The applicant's engineer indicated (at the Planning Commission Meeting held on January 3, 2018) that some narrow paving would be provided (on the Final Plan) in the area of curbing along the northern driveway to prevent erosion in this area. The Final Plan does not specify paving; rather, it includes a note on Sheet LD103 stating, “"Driveway surface along curb shall be resistant to possible erosion from gutter flow. This is a private driveway and it is incumbent upon the landowner to provide safe passage for employees and visitors to the property, as well as to abide by the approved stormwater management plan. If any future issues arise due to neglect or lapse in maintenance, they can be addressed at that time via the code enforcement process. 4. Operations and Maintenance Agreement. Section 182-32. The property owner shall sign an O&M agreement with the Township addressing the terms cited in this section, prior to final plan approval. 5. Stormwater Management Easements. Section 182-33.B. Stormwater easement(s) shall be provided as specified in this section. Note 29 has been added to LD101, should review this proposal for adequacy. Sincerely, SYSTEMSDESIGNENGINEERING,INC. Ed Kopicki Township Planning Consultant Cc: Maidencreek Township Supervisors Diane Hollenbach, Twp. Manager Eugene Orlando Jr., Twp Solicitor. Berks Surveying & Engineering Jeffrey and CarolBaum Berkshire Property Management Company, LLC File 17-0024-0707 SDE Maid.Municipal Bldg ParKing JOB Systems Design Engineering,Jnc. SHEET NO. Engineers·Surveyors·Planners·Construction Managers 1032JamesDriveLeesport,PA19533 CALCULATEDBY (610)916-8500 DATE FAX (610) 916-8501 CHECKEDBY DATE SCALE mTAfhce maidTwpofice Z 730 5940 39x38' 148z..F maid.twp.mtaRm 19×38 Mard,Garage 1231×38 467459P4 Ooffice 3.5...paces assemblyhal/withoutfixedseats /spaceper5o s9.ft.ofFloorarea inmtg.cm.olus/spacefor eyeryzoos9..ftof otherlfloorarea municipat Garage Hof employeesroadcreu max. 2730 f47/1000f+3) x 3.5 9.56 722F+3/50f+? 14.4 15 max...employaroadlcrew TOTAL. 34 Plan Z6+8+ZADA 36 PRODUCT 204-1 (Single Sheets) 205-1 (Padded)