MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS
May 10, 2018
ENGINEER'SAGENDA
SubdivisionReview Status Checklist
Next Supervisors Meeting June 14,2018
Berkshire Building Services-Time Ext.request to July 13,2018; copy attached
Subdivision/Zoning/LDP
Plans currently in review.
GSPPropertiesFinalLDP-SeeSDEItr.dated4/30/18;NoAction
BerkshireBuilding ServicesFinal LDP-SeeSDEItr.dated3/5/18;NoAction
MaidencreekTV&Appliance-SeeSDEItr.Dated4/25/18
MelrosePlace-Stormwater/Grading
Work ongrading swale&properties is proceeding.
Projects
StormwaterProjects
Ina/Rt.73-Lindbergh/Adele-onhold
West ShoreDrive
Meet with inspector for state regarding Bridge Inspection.Report.
Repairs are somewhatextensive; Twp.Involvement ispossible
Three (3) 60" dia. Pipes required as alternative to existing opening. Not
desirable due to maintenance.
Twp. to make repairs as schedule permits.
Dog Park
BoS awarded contract to Fehl's in the amountof s32,537; contracts executed
&NoticetoProceed sent.
Stakeout completed; contractortostart work &becompleted byMay29.
2018 Road Projects
Contract"A" road paving contract Awarded to H&K Group in the amount of
$199,825.14 (Includes both parking lot areas on Quarry Rd.)
Contract“B"cold-in-place recycling Evansville Rd.contract awarded to H&K
Group in the amount of $103,990.86.
SubdivisionImprovementLoC/EscrowRelease
SewageEnforcementOfficerActivityReport
Page1of1
I:/Projects\MaidencreekTownship/18-0019-0100\Engineer'sAgendal|5.10.18.docx

Most Recent
Letter Date
3/6/2018
2/8/2018
Review
3/5/2018
See SDE Itr.3/6/18and MTPC Itr.
1/3/18&2/8/18
See SDE Itr.Dated 4/30/18
See SDE Itr.Dated 3/5/18
Comments
P.C. Action Itr. 1/4/18
Dated 4/5/18
See SDE Itr.
Approved
BY BOS
04/12/18
02/08/18
MAIDENCREEKTOWNSHIP,BERKSCOUNTY
(may reflect more
than one extension)
Extension
06/05/18
07/13/18
SUBDIVISION STATUS
5/10/2018
Period Ends
03/06/18
03/06/18
06/05/18
90-Day
Review
07/31/18
Review Period
I:/ProjectsMaidencreek Townshipl18-0019-01001Subdivision Status15.10.18
12/06/17
12/06/17
03/07/18
Begins
90-Day
05/02/18
Plan Stage
Prel.
Final
LDP
Prel.
Final
LDP
LDP
LDP
APPROVED/PENDINGPLANS:
GSPProperties -Business Park
GSPProperties-BusinessPark
Berkshire Building Services
Berkshire Building Services
CURRENT PLANS:
Project Name
No.

MAIDENCREEKTWP.PLANNINGCOMMISSION
P.O.BOX319,BLANDON,PA19510
May 3, 2018
MaidencreekTownshipBoardof Supervisors
POBox 319
Blandon,PA 19510
Gentlemen,
At their May 2, 2018 meeting, the Maidencreek Township Planning Commission
recommended by formal motion that the Board of Supervisors accept the extension of time for
the review period until July 13, 2018 which was offered by the developer's agent for the Berkshire
Building Services Land Development Plan.
Sincerely,
OranoLlllenbach
Diane Hollenbach
Manager
MaidencreekTownship
cC:
Berks Surveying and Engineering Inc.

BERKSSURVEYING&ENGINEERING,InC.
Land Surveying and Engineering Services
311EastMainStreetFleetwood,PA19522
BERKS
Phone:610-944-8528
Fax:610-944-6123
www.berks-surveving.com
e-mail: info@berks-surveying.com
Member
April 30,2018
To:
Maidencreek Township
Board of Supervisors
P.O. Box 319
1QuarryRoad
Blandon,PA19510
E:
d.hollenbach@maidencreek.net (DianeHollenbach)
Re:
BerkshireBuildingServices,WestWesnerRoad
ToWhomitMayConcern:
We grant an extension of time for review by the Maidencreek Township Board of
Supervisorsofthepreviouslysubmittedproposed“Berkshire BuildingServices,FinalPlan"
until July13th,2018.
Thank you.
Sincerely,
Robert D.Hain, PLS, Project Manager
Berks Surveying &Engineering, Inc.
ForBerkshirePropertyManagementCompany,LLC

SYSTEMSDESIGN
SDE
"A Passion for Engineering Excellence"
ENGINEERING,INC
sdei.net
April 30, 2018
MaidencreekTownshipPlanningCommission
POBox319
BlandonPA19510
Re:
BusinessPark atMaidencreekLandDevelopmentPlan
FinalPlanReview#1
Maidencreek Township
Berks County
Dear Planning Commission Members:
We are in receipt of a Preliminary Plan entitled Business Park at Maidencreek prepared by
Stackhouse Bensinger Inc. (SBI) of Sinking Spring PA. The owner of the tract is GSP
Properties-NorthBethlehem,LLCofAllentownPA.
The site consists of 9.4 acres and is located in the “CR-Commercial Residential District". The
site is located along the south west side of Rt. 222, has 260 feet of frontage and is approximately
925 feet deep being rectangular in shape. A single access private drive/parking lot is being
proposed through the center of the tract terminating in a cul-de-sac. There are 22 - 1,479 square
foot office buildings being proposed in 11 duplexes with perpendicular parking provided fronting
the units.
The SBI plan submittal consists of 20 sheets as follows:
TITLE
PLAN NUMBER
DATE
REV.
Cover Sheet
C-1.1
11-27-17
4-18-18
Ex. Cond. Site Analysis
C-2.1
11-27-17
4-18-18
Demolition
C-3.1
11-27-17
4-18-18
Land Development
C-4.1
11-27-17
4-18-18
Grading and Utility
C-5.1
11-27-17
4-18-18
Landscaping
C-6.1
11-27-17
4-18-18
Lighting
C-6.2
11-27-17
4-18-18
Driveway, Storm, Sanitary Profiles
C-7.1
11-27-17
4-18-18
Site Construction Details
C-8.1
11-27-17
4-18-18
Site Construction Details
C-8.2
11-27-17
4-18-18
Site Construction Details
C-8.3
11-27-17
4-18-18
Site Construction Details
C-8.4
11-27-17
4-18-18
Pre-Construction Cond. Plan
C-PCC
11-27-17
4-03-18
PCSMandO&MPlan
C-PCSM1
11-27-17
4-03-18
PCSMand O&MPlanDetails
C-PCSM2
11-27-17
4-03-18
PCSMandO&MPlanDetails
C-PCSM3
11-27-17
4-03-18
1032JamesDrive,Leesport,PA19533.P:610.916.8500.F:610.916.8501
Schuylkill Haven,PAP:570.385.5549
Boyertown,PAP:610.369.1319

MaidencreekTownshipPlanningCommission
Re:
Business ParkatMaidencreek LDP
FinalPlanReview#1
April 30,2018
Page 2
PCSMandO&MPlanDetails
C-PCSM4
11-27-17
4-03-18
Erosion Sediment Control Plan
C-ESC1
03-09-18
E&SCDetails
C-ESC2
03-09-18
E&SCPlanNotes
C-ESC3
03-09-18
We have reviewed the above referenced plan and have the following comments for your
consideration:
Zoning: No Comments
SALDO:
1. Erosion and Sediment Control. Section 190-41. An erosion and sediment control plan
approval.
2. Improvement Specifications. Section 190-25.D(6)(b), Section 190-27 and Section
Township. Construction cost estimates have been submitted by the applicant and are
presently under review by our office
3. Sanitary Sewer. Section 190-38. Maidencreek Township Authority approval for the
proposed sewerage system will be required prior to Final plan approval by the Township
See attached Sewer review letter from SDE to the Authority dated April 24, 2018.
4. Water. Section 190-40.Maidencreek Township Authority approval will be required for
the proposed water system prior to Final Plan approval by the Township. See attached
Water review letter from SDE to the Authority dated April 24, 2018.
SDE

MaidencreekTownshipPlanningCommission
Re:Business Park at Maidencreek LDP
FinalPlanReview#1
April 30, 2018
Stormwater Comments (Chapter 182 Stormwater Management):
1. PennDOT Approval, Section 182-9.H. This project will need to be coordinated with
PennDOT's S.R. 222 improvements. We will defer to PennDOT for authorization of
work in and adjacent to their right-of-way.
2. Erosion and Sediment Control/NPDES Permit, Section 182-11. Evidence of approval
of the E&S and NPDES permit applications by Berks County Conservation District shall
be provided to the Township, prior to plan approval. A copy of the plan should be
provided to the Township.
3. BMP Operations and Maintenance, Section 182-32. An O&M agreement is required
to be executed prior to plan approval.
Sincerely,
SYSTEMSDESIGNENGINEERING,INC
Kgpucha
Ed Kopicki
Township Planning Consultant
Cc:
Maidencreek Township Supervisors
Diane Hollenbach, Twp. Manager
Eugene Orlando Jr., Twp Solicitor.
GSPProperties-NorthBethlehem LLC
StackhouseBensingerInc
File17-0024-0708
SDE

SYSTEMS DESIGN
sdei.net
April 24.2018
MaidencreekTownshipAuthority
POBox 289
BlandonPA,19510
Re:
GsPProperties--“Business Park at Maidencreek
PublicSewerandWaterReview--Revised2/21/2018
Maidencreek Township
Berks County,Pennsylvania
Dear Authority Members:
We are in receipt of the revised (2/21/2018) Plans entitled “Business Park at Maidencreek
preparedby Stackhouse Bensinger Inc.
The plan submittal SDE reviewed consisted of 12 sheets as follows:
Plan
Sheet Title
Sheet Number
Number
Date
Revised
Cover Sheet
C-1.1
Sheet 1 of 12
11/27/2017
2/21/2018
Existing Conditions
C-2.1
Sheet 2 of 12
& Site Analysis
11/27/2017
2/21/2018
Demolition
C-3.1
Sheet 3 of 12
11/27/2017
2/21/2018
Land Development
C-4.1
Sheet 4 of12
11/27/2017
2/21/2018
Grading & Utility
C-5.1
Sheet 5 of 12
11/27/2017
2/21/2018
Landscaping
C-6.1
Sheet 6 of 12
11/27/2017
2/21/2018
Lighting (Reserved)
C-6.2
Sheet 7of 12
11/27/2017
2/21/2018
Driveway, Storm &
C-7.1
Sanitary Sewer Profiles
Sheet 8of 12
11/27/2017
2/21/2018
Site Construction Details
C-8.1
Sheet 9 of 12
11/27/2017
2/21/2018
Site Construction Details
C-8.2
Sheet 10of 12
11/27/2017
2/21/2018
Site Construction Details
C-8.3
Sheet 11 of 12
11/27/2017
2/21/2018
Site Construction Details
C-8.4
Sheet 12of 12
11/27/2017
2/21/2018
We have reviewed the above referenced plans (revised 2/21/2018) and have the following
comments foryour consideration:
Site Description
The tract is located on south side of Allentown Pike (S.R. 222) adjacent to Independence
Court located within Maidencreek Township. The area is currently zoned as a Commercial-
1032JamesDrive,Leesport,PA19533P:610.916.8500eF:610.916.8501

Maidencreek TownshipAuthority
"Business Park at Maidencreek"Plan Sewer and Water Review
April24,2018
Residential District (C-R) and consists of 2 cxisting parcels totaling 4.58 acres.The intended
use is for 11 semi-detached office buildings, totaling 22 office units that are 1,479 S.F. each.
Sanitary Sewer
1.The Developer and/or the Developer's Agent should provide the Authority with the
estimated sewage flow in gallons per day for the proposed facility. Depending on
the estimated sewage flow, a DEP Planning Module Application Mailer/Postcard
mayhavetobe completed and submitted to DEP.
According to the attached PA DEP Letter (dated February 1, 2018),it is projected
that 88 employees will work at the proposed commercial/business park and generate
flows of 880 gallons per day tribuiary to MTA's sewers and wastewater treatment
plant. Com ment satisfactorily addressed. See attached letter from PA DEP.
2.A note should be added to the plan that states "No floor drains shall be connected to
the Maidencreek Township Authority sanitary sewer system."
Comment satisfactorily addressed.
3. A note should be added to the plan which states the proposed sewage flows for this
facility will contain domestic sewage only. If the proposed wastewater discharge
will contain any non-domestic sewage, details will need to be submitted to the
Authority for review and approval.
Comment satisfactorily addressed.
4.The Developer will be responsible for the payment of all applicable tapping fees
permit fees, and review fees. The sewer tapping fee will be calculated from the flow
$13.77/gpd for this commercial property. Permitting may be required from the PA
Department of Environmental Protection and other associated Agencies to
install/connect new utilities within the 100-year floodplain if they so encroach.
Comnient acknowledged by Stackhouse Bensinger Inc.
5. The ownership and ultimate maintenance of the sewer extension needs to be
clarified, as it is to remain private. An Improvements Agreement for the proposed
sewer improvements will need to be established. A sewer easement agreement with
the appropriate legal description will need to be recorded with the final plan to allow
the Authority the right to access the property in an emergency situation.

MaidencreekTownshipAuthority
"Business Park atMaidencreek"Plan Sewer and Water Review
April 24,2018
The revised plans state the following:"Sanitary Sewer and Water Line Blankel
Easement: The property owner hereby grants to the Maidencreek Tounship
Authority and/or its agent the right to enter upon the property from time to time for
the purpose of inspection and maintenance of the sanitary sewer and water
facilities." SDE recommends thar the statement be reviewed by Authority Solicitor.
6. The proposed driveway profile"(Sheet C-7.1) shows the proposed 8-inch sanitary
sewer main as smooth lined corrugated plastic pipe (SLCPP).The label shall be
changed to SDR-35, which is consistent with the utility plan (Sheet C-5.1).
Comnment renains.
Due to proposed manholes MH-1 and MH-4 being relatively shallow, SDE
recommends both manholes be fiat-top manholes. A flat-top manhole detail shall
be provided.
7. The proposed utility plan (Sheet C-5.1) shows an 8-inch SDR-35 PVC sanitary sewer
main on the southwest side of the property and connecting to the Authority's existing
sanitary sewer system with a new doghouse manhole (MH-3). The sewer main
extension has laterals which collect flow from units 15-22 and also cross below
proposed Infiltration Basin 1 to collect from units 3-12. All proposed office units
have their own separate sanitary sewer lateral. However, units 3-12 join together
before crossing Infiltration Basin 1 (for a total of 4 crossings) and units 1, 2, 13 and
14 connect directly to the Authority's existing sanitary sewer main.
SDE has multiple issues with the proposed utility plan described above, including:
The proposed office units (1, 2, 13 & 14) shall not connect directly to the
Authority's interceptor sewer line. This line receives a large amount of flow,
making a backup to the office buildings potentially catastrophic.
Per the Authority's Rules and Regulations, multiple sanitary sewer laterals
shall not be combined before reaching a sewer main. Therefore, units 3-12
shall be served by their own laterals that individually connect to the proposed
main(s).
Due to potential maintenance and basin integrity issues, utilities (both water
and sewer) shall not cross under proposed stormwater Infiltration Basin 1.
Therefore, it is SDE's recommendaion that two sanitary sewer mains be installed,
one on each side of proposed Infiltration Basin 1 before connecting to the
Authority's existing sanitary sewer system with new doghouse manholes. The
proposed office units on the north side of the existing system (Units 1, 2, 13 & 14)
would then connect to these new doghouse manholes, rather than connecting to the
existinginterceptor.
A detail shall be provided for proposed doghouse manholes (MH-3 and MH-6),
providing inverts of proposed laterals 1, 2, 13 & 14.

MaidencreekTownshipAuthority
Page4
Business Park atMaidencreek"Plan Sewerand WaterReview'
April24,2018
The locations of the proposed laterals'vents/cleanouts shall be provided on Sheet
C-5.1.
8.Due to proximity of the sanitary sewer main(s)to Infiltration Basin 1 and its
surrounding geology, utility trenches shall not be backfilled with clean stone (as
shown on Sheet C-8.3).Revise the "Typical Trench for Sewer Lines and Laterals"
detail as necessary using 2A aggregate or 2RC aggregate.
Revise detail to state:"Place 2A aggregate at 95% dry proctor density."
9. Shift proposed River Birch Tree outside the Sanitary sewer easement between Units
14 and 15.
10. Sheet C-6.1 shows a thornless honey locust tree between Units 16 and 17, which is
located directly above the proposed sanitary sewer main. SDE recommends the tree
be moved and planted behind the community mailboxes.
11. Sheet C-6.2 proposes a light post be constructed between Units 2 and 3 in the
Authority's sanitary sewer easement. The light post shall be moved outside of the
easement
I2. Revise labels on all sheets referring to sanitary sewer easement as "20'Alley."
13. Due to concerns from vehicular and lydrostatic loads, SDE recommends that all
sanitary sewer mains and laterals be constructed of SDR-26 pipe.
l4. Remove "Saddle for Lateral Connection to Existing Sanitary Sewer Main on
SheetC-8.3.
Water
1. Due to proximity of the water main(s) to Infiltration Basin 1 and its surrounding
geology, utility trenches shall not be backfilled with clean stone (as shown on Sheet
C-8.2).Revisedetails as necessary.
Revise detail to state:"Place 2A aggregate at 95% dry proctor density"
2.All proposed water lines and valves shall be clearly labeled with its respective size
and type.
Comment satisfactorily addressed

Maidencreek TownshipAuthority
Page5
"Business Park atMaidencreekPlan SewerandWaterReview
April24.2018
3. As stated in theSanitary Sewer"section above.SDE has multiple issues with the
proposed utility plan (Sheet C-5.1). Therefore. it is SDE's recommendation that the
Developer utilize the existing 20' walerline easement at the southeast cormer of the
tract to tie into the Authority's existing water system near Independence Court,
upgrading the existing service to a 6-inch or 8-inch line. Afer connecting to the
proposed fire hydrant, the water line shall tee into two separate water mains on each
side of Infiltration Basin l. Afer all proposed office unit water services, the two
water mains shall reconnect (outside of Infiltration Basin J) to create a loop to
prevent excess stagnant water. The proposed water loop can be constructed of either
C-900PVCorDIP.
SDE recommends that the Developer obtain a new agreement or modify the
original agreement for the aforenentioned 20-foot waterline easement to allow for
proposed 6-inch or 8-inch water extension. Comment renains.
4. Due to timing of the PennDOT S.R. 222 Widening Project, the Developer may have
significant problems in obtaining a Highway Occupancy Permit to connect to the
Authority's existing12-inchwatermain.
SDE recommends that the Developer tie into the Authority's existing water system
near Independence Court rather than connect to existing 12-inch main on SR 222.
An 8-inch gate valve shall be placed on the water main between the proposed water
main loop and connection point for increased operator control Comment remains.
5. The ownership and ultimate maintenance of the water main extension needs to be
clarified, as it is to remain private. An Improvements Agreement for the proposed
water improvements will need to be established. A water easement agreement with
the appropriate legal description will need to be recorded with the final plan to allow
the Authority the right to access the property in an emergency situation.
The revised plans state the following: "Sanitary Sewer and Water Line Blanket
Easement: The property owner hereby grants to the Maidencreek Township
Authority and/or its agent the right to enter upon the property from time to time for
the purpose of inspection and maintenance of the sanitary sewer and water
facilities." SDE recommends that the statement be reviewed by Authority Solicitor.
Maidencreek Township Authority requests dedication of the water line extension
from the connection near Independence Court to the proposed fire hydrant The
Authority will also need access to all water service meters for billing purposes.
6.The Property Owner will be responsible for all applicable costs (tapping fees,review
fees, permit fees, etc.). The property owner will also be responsible for the cost and
installation of the meters. Each unit will require a separate meter, so 22 meters will

MaidencreekTownshipAuthority
Page 6
"Business Park at Maidencreek"Plan Sewer and Water Review
April24,2018
be required.A tapping fee is $7.98/gpd.Themeters will be provided by the
Authority.A note shall be placed on the plan stating thatAdditional fees may be
reguired based on water and sewer use reviewed on a yearly basis complying with all
rules and regulations of the Maidencreek Township Authority for tapping fees.
Note was not added to plans. Comment remains.
7. The Authority will provide hydrant testing for flow and pressure on the 8" water
main in Independence Court to assist the developer in determining if there is
sufficient flow and pressure to serve the development in lieu of the connection to the
12"main in SR 222.
Comment acknowledged by Stackhouse Bensinger Inc.
8. The locations of all proposed curb stops at each unit shall be provided on Sheet C.
5.1.
9. Revise the "Service Connections" detail shown on Sheer C-8.2 to State that all
proposed water services be 3/4-inch pipe.
General
1. The Maidencreek Township Authority reserves the right for additional comments.
If you should have any questions, please contact our office.
Sincerely,
Systems Design Engineering, Inc.
Pamela J. Stevens, P.E.
AuthorityEngineer
CC:
Maidencreek Township Supervisors
MaidencreekTownshipPlanningCommission
Dan Becker, Esq.
Stackhouse Bensinger, Inc.
GSP Properties-North Bethlehem, LLC
17-0466-0541GSPPlanReview

SYSTEMSDESIGN
SDE
"APassion for Engineering Excellence
ENGINEERING,INC
sdei.net
April 25,2018
Maidencreek Township
PO Box 319
BlandonPA19510
Re:
MaidencreekTV andAppliancePlanReview
Maidencreek Township
Berks County
DearTownship Officials:
We are in receipt of a Plan entitled Maidencreek TV and Appliance Proposed Layout Plan
prepared by Berks Surveying & Engineering, Inc.
The site is the existing site of the Maidencreek TV and Appliance store located along the north
side of Rt 222 approximately 400 feet from the intersection of Rt 222 and Lake Shore Drive. The
site is 1.9 acres in size and zoned C-1 Local Commercial. The plan reflects a proposed change of
building location due to PennDOT taking of right-of-way.
The plan submittal consists of 7 sheet as follows:
TITLE
SHEETNUMBER
DATE
REV.
Proposed Layout Plan
C101
4.12.18
Grading/Utility Plan
C102
4.12.18
Existing Site Plan
C103
4.12.18
Detail Sheet
C104
4.12.18
Photometric Plan
PH101
4.12.18
E&SPCPlan
ES101
4.12.18
E&SPCDetails
ES102
4.12.18
We have reviewed the above referenced plans and have the following comments for your
consideration:
Zoning:
1. Permitted Use. Section 220-41. The proposed use of a retail store is a use permitted by
right in the C-1 Local Commercial District.
1032James Drive, Leesport,PA19533.P:610.916.8500.F:610.916.8501
Schuylkill Haven,PAeP:570.385.5549
Boyertown,PA P:610.369.1319

Maidencreek TownshipPlanning Commission
Re:
MaidencreekTVandAppliance LDP
LayoutPlanReview
April25,2018
Page 2
2. Maximum Impervious Cover. Section 220-42. The maximum impervious cover
allowed is 65%. The proposed impervious cover is 72%(same as existing). In addition, it
appears that the total square footage of the new structure will be less than the previous
PennDOT was not at the applicants asking. A Zoning Variance will be required.
3. Front Yard Set Back. Section 220-42. The plan correctly has located the front yard set
back as 50 feet for the present Zone, however Section 220-75 indicates that a Front Yard
set back is to be 100 feet from the centerline of Rt. 222. There is no proposed violation
however the plan should reflect this and the owner should be aware of this highway set
back.
4. Rear Yard Set Back. Section 220-42. The proposed building encroaches into the
required 25 foot rear yard. A Zoning Variance will be required.
5. Nonconforming Uses of Land. Section 220-105. Any existing nonconforming use of
land such as lot coverage and setbacks, should be given consideration for this land
development. Most violations have been lessened with this proposal.
SALDO:
1. Landscaping. Section 190-44G.5. Landscaped areas shall be protected from the
encroachment of vehicles by use of curbing, wheel stops, bollards, or other approved
barriers.
2. Lighting. Section 186-47. A Lighting plan has been submitted. I would suggest either
reducing the lumens on the building entrance light or provide a shield on the front of the
light. The entrance light is noted to be twice the lumens required by this section of the
ordinance. In addition, back shielding should be provided for the parking lot lights along
SR 222.
SDE

Maidencreek Township Planning Commission
Re:
Maidencreek TV andAppliance LDP
Layout Plan Review
April25,2018
Stormwater Comments:
1. Stormwater Permit Required. Section 182-8. A stormwater permit will be required,
based on the definition of“regulated activities."The application can be obtained from the
Township or this office.
2. Erosion and Sediment Control. Section 182-11.A. Evidence of E&S Plan approval by
Berks County Conservation District must be provided to the Township, prior to issuance
ofaStormwaterPermit.
3. Swale Design. Section182-17.D.(21) The swale proposed between the front parking lot
and the PennDOT right-of-way should be designed and lined as needed for stability.
4. Swale Design. Section182-17.D.(21)(d) Flow in the swale crosses the southern driveway
on its way to a stone trench. Additional spot elevations are recommended on and
adjacent to the driveway, to ensure flow across the driveway is uninterrupted and
concentrated so that ponding and icing do not occur. Depending on the upstream
drainage area, this applies to a lesser extent to the northern driveway, which similarly
dips toallowrunofftocross.
5. Landowner Statement. Section 182-22.B.(22) A statement should be added to the plan,
signed by the landowner, acknowledging that any revisions to the approved drainage plan
must be approved by the Township of Maidencreek and the Conservation District.
6. Design Engineer's Certification. Section 182-22.B.(23) The signature block shall be
added and executed.
7. Stormwater Facilities. Section 182-22.D.(1) Roof drains, leaders, etc. should be shown.
SDE

MaidencreekTownshipPlanningCommission
Re:
Maidencreek TV and Appliance LDP
Layout Plan Review
April 25, 2018
8. Stormwater Calculations. Section 182-22.D.(3) The design basis and maintenance
requirements for the stone trenches should be provided; e.g.; design storm, overflow
provisions, etc.
9. Operation and Maintenance Agreement. Section 182-32. An O&M Agreement is
required for the stormwater BMPs. A “mini" agreement should be acceptable and a
blank canbe obtained from the Township or this office.
General Comments:
1. Public sewer and public water is available for this parcel. Approval by the Maidencreek
Township Authority for the proposed sewer and water design will be required prior to
construction. See attached review letter dated April 24, 2018 from SDE to the Authority.
2. PennDot issues regarding access and/or construction easements will need to be resolved
prior to construction.
3. I suggest a few shade trees be planted in those portions of the parking lot that would allow
such plantings.
Sincerely,
SYSTEMSDESIGNENGINEERING,INC.
Ed Kopicki
Township Planning Consultant
Cc:
MaidencreekTownship Supervisors
Diane Hollenbach, Twp. Manager
Eugene Orlando Jr., Twp Solicitor.
DKB Realty, LLC
Berks Surveying & Engineering
SDE

SYSTEMSDESIGN
NGNRNCN
sdei.net
April24,2018
Maidencreek Township Authority
POBox289
BlandonPA,19510
Re:
MaidencreekTV&Appliance
Public Sewer and Water Review
MaidencreekTownship
Berks County,Pennsylvania
Dear Authority Members:
We are in receipt of the Plans entitled Maidencreek TV & Appliance"prepared by Berks Surveying
& Engineering, Inc.
Theplan submittal SDEreviewed consisted of7sheetsas follows:
Plan
Sheet Title
Sheet Number
Date
Number
Proposed Layout Plan
C101
Sheet 1 of 7
04/12/2018
Grading/UtilityPlan
C102
Sheet 2of7
04/12/2018
Existing SitePlan
C103
Sheet 3of 7
04/12/2018
Detail Sheet
C104
Sheet 4 of7
04/12/2018
Photometric Plan
PH101
Sheet 5of7
04/12/2018
E&SPCPlan
ES101
Sheet 6of7
04/12/2018
E&SPCDetails
ES102
Sheet 7of7
04/12/2018
We have reviewed the above referenced plans and have the following comments for your
consideration:
Site Description
The site consists of 5.29 acres and situated in the "C-j"-Local Commercial District. The site is
located along SR 0222 in the Penn DOT Improvements Project Section 22S.The Sketch plan reflects
the relocation of the business to the rear of the property including a proposed new building and a
new macadam parking lot.
Sanitary Sewer
1. Due to concems from vehicular loads, SDE recommends that all sanitary sewer be
constructed of SDR-26pipe.
2.
Construction of the sanitary sewer lateral shall be in compliance with the Authority's
StandardRulesandRegulations,
1032JamesDrive,Leesport,PA19533P:610.916.8500eF:610.916.8501

MaidencreekTownship Authority
Maidencreek TV&Appliance"Plan SewerandWaterReview
April24,2018
3. The proposed sanitary sewer lateral shall be privale and be the sole responsibility of the
Property Owner.
Water
1.Due to timing of the PennDOT S.R.222 Widening Project, the Property Owner may have
significant problems in obtaining a Highway Occupancy Permit to connect to the Authority's
existing water main on S.R.222.The new water service proposed by the Authority on SR
222, may notbe available for connection until late 2019 to well into 2020.Another option
could be to look at connecting to the Authority's existing 6-inch water main on Quarry Road
and obtain the appropriate utility easement from Redner's Development Company and/or
Maidencreek Township. The connection to Quarry Road could then provide a permanent
connection and avoid the potential issues obtaining a HOP or potential conflicts during the
construction of the SR 222 Project.
2.
Construction of the water service connection shall be in compliance with the Authority's
Standard Rules and Regulations.
3.The proposed water service connection shall be private and be the sole responsibility of the
Property Owner.
Ifyou should haveanyquestions,pleasecontactouroffice.
Sincerely,
Systems Design Engineering, Inc.
Pamela J. Stevens, P.E.
AuthorityEngineer
cC:
Maidencreek Township Supervisors
MaidencreekTownshipPlanningCommission
Dan Becker, Esq.
Berks Surveying&Engineering,Inc.
MaidencreekTV&Appliance
File#17-0466-0539

Chk
Billed/Paid
to Date By
Fee Paid
Applicant
KTOWNSHIP
SEOACTIVITYREPORT
4/1/18-4/30/18
Applicant/Activity
MAIDENCREEK
, admin/filing.
SEO report,
App. #
18-0019-0300
SDE#
T. Unger 2 copies
SEO Desk
Cc: