MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS May 10, 2018 ENGINEER'SAGENDA SubdivisionReview Status Checklist Next Supervisors Meeting June 14,2018 Berkshire Building Services-Time Ext.request to July 13,2018; copy attached Subdivision/Zoning/LDP Plans currently in review. GSPPropertiesFinalLDP-SeeSDEItr.dated4/30/18;NoAction BerkshireBuilding ServicesFinal LDP-SeeSDEItr.dated3/5/18;NoAction MaidencreekTV&Appliance-SeeSDEItr.Dated4/25/18 MelrosePlace-Stormwater/Grading Work ongrading swale&properties is proceeding. Projects StormwaterProjects Ina/Rt.73-Lindbergh/Adele-onhold West ShoreDrive Meet with inspector for state regarding Bridge Inspection.Report. Repairs are somewhatextensive; Twp.Involvement ispossible Three (3) 60" dia. Pipes required as alternative to existing opening. Not desirable due to maintenance. Twp. to make repairs as schedule permits. Dog Park BoS awarded contract to Fehl's in the amountof s32,537; contracts executed &NoticetoProceed sent. Stakeout completed; contractortostart work &becompleted byMay29. 2018 Road Projects Contract"A" road paving contract Awarded to H&K Group in the amount of $199,825.14 (Includes both parking lot areas on Quarry Rd.) Contract“B"cold-in-place recycling Evansville Rd.contract awarded to H&K Group in the amount of $103,990.86. SubdivisionImprovementLoC/EscrowRelease SewageEnforcementOfficerActivityReport Page1of1 I:/Projects\MaidencreekTownship/18-0019-0100\Engineer'sAgendal|5.10.18.docx Most Recent Letter Date 3/6/2018 2/8/2018 Review 3/5/2018 See SDE Itr.3/6/18and MTPC Itr. 1/3/18&2/8/18 See SDE Itr.Dated 4/30/18 See SDE Itr.Dated 3/5/18 Comments P.C. Action Itr. 1/4/18 Dated 4/5/18 See SDE Itr. Approved BY BOS 04/12/18 02/08/18 MAIDENCREEKTOWNSHIP,BERKSCOUNTY (may reflect more than one extension) Extension 06/05/18 07/13/18 SUBDIVISION STATUS 5/10/2018 Period Ends 03/06/18 03/06/18 06/05/18 90-Day Review 07/31/18 Review Period I:/ProjectsMaidencreek Townshipl18-0019-01001Subdivision Status15.10.18 12/06/17 12/06/17 03/07/18 Begins 90-Day 05/02/18 Plan Stage Prel. Final LDP Prel. Final LDP LDP LDP APPROVED/PENDINGPLANS: GSPProperties -Business Park GSPProperties-BusinessPark Berkshire Building Services Berkshire Building Services CURRENT PLANS: Project Name No. MAIDENCREEKTWP.PLANNINGCOMMISSION P.O.BOX319,BLANDON,PA19510 May 3, 2018 MaidencreekTownshipBoardof Supervisors POBox 319 Blandon,PA 19510 Gentlemen, At their May 2, 2018 meeting, the Maidencreek Township Planning Commission recommended by formal motion that the Board of Supervisors accept the extension of time for the review period until July 13, 2018 which was offered by the developer's agent for the Berkshire Building Services Land Development Plan. Sincerely, OranoLlllenbach Diane Hollenbach Manager MaidencreekTownship cC: Berks Surveying and Engineering Inc. BERKSSURVEYING&ENGINEERING,InC. Land Surveying and Engineering Services 311EastMainStreetFleetwood,PA19522 BERKS Phone:610-944-8528 Fax:610-944-6123 www.berks-surveving.com e-mail: info@berks-surveying.com Member April 30,2018 To: Maidencreek Township Board of Supervisors P.O. Box 319 1QuarryRoad Blandon,PA19510 E: d.hollenbach@maidencreek.net (DianeHollenbach) Re: BerkshireBuildingServices,WestWesnerRoad ToWhomitMayConcern: We grant an extension of time for review by the Maidencreek Township Board of Supervisorsofthepreviouslysubmittedproposed“Berkshire BuildingServices,FinalPlan" until July13th,2018. Thank you. Sincerely, Robert D.Hain, PLS, Project Manager Berks Surveying &Engineering, Inc. ForBerkshirePropertyManagementCompany,LLC SYSTEMSDESIGN SDE "A Passion for Engineering Excellence" ENGINEERING,INC sdei.net April 30, 2018 MaidencreekTownshipPlanningCommission POBox319 BlandonPA19510 Re: BusinessPark atMaidencreekLandDevelopmentPlan FinalPlanReview#1 Maidencreek Township Berks County Dear Planning Commission Members: We are in receipt of a Preliminary Plan entitled Business Park at Maidencreek prepared by Stackhouse Bensinger Inc. (SBI) of Sinking Spring PA. The owner of the tract is GSP Properties-NorthBethlehem,LLCofAllentownPA. The site consists of 9.4 acres and is located in the “CR-Commercial Residential District". The site is located along the south west side of Rt. 222, has 260 feet of frontage and is approximately 925 feet deep being rectangular in shape. A single access private drive/parking lot is being proposed through the center of the tract terminating in a cul-de-sac. There are 22 - 1,479 square foot office buildings being proposed in 11 duplexes with perpendicular parking provided fronting the units. The SBI plan submittal consists of 20 sheets as follows: TITLE PLAN NUMBER DATE REV. Cover Sheet C-1.1 11-27-17 4-18-18 Ex. Cond. Site Analysis C-2.1 11-27-17 4-18-18 Demolition C-3.1 11-27-17 4-18-18 Land Development C-4.1 11-27-17 4-18-18 Grading and Utility C-5.1 11-27-17 4-18-18 Landscaping C-6.1 11-27-17 4-18-18 Lighting C-6.2 11-27-17 4-18-18 Driveway, Storm, Sanitary Profiles C-7.1 11-27-17 4-18-18 Site Construction Details C-8.1 11-27-17 4-18-18 Site Construction Details C-8.2 11-27-17 4-18-18 Site Construction Details C-8.3 11-27-17 4-18-18 Site Construction Details C-8.4 11-27-17 4-18-18 Pre-Construction Cond. Plan C-PCC 11-27-17 4-03-18 PCSMandO&MPlan C-PCSM1 11-27-17 4-03-18 PCSMand O&MPlanDetails C-PCSM2 11-27-17 4-03-18 PCSMandO&MPlanDetails C-PCSM3 11-27-17 4-03-18 1032JamesDrive,Leesport,PA19533.P:610.916.8500.F:610.916.8501 Schuylkill Haven,PAP:570.385.5549 Boyertown,PAP:610.369.1319 MaidencreekTownshipPlanningCommission Re: Business ParkatMaidencreek LDP FinalPlanReview#1 April 30,2018 Page 2 PCSMandO&MPlanDetails C-PCSM4 11-27-17 4-03-18 Erosion Sediment Control Plan C-ESC1 03-09-18 E&SCDetails C-ESC2 03-09-18 E&SCPlanNotes C-ESC3 03-09-18 We have reviewed the above referenced plan and have the following comments for your consideration: Zoning: No Comments SALDO: 1. Erosion and Sediment Control. Section 190-41. An erosion and sediment control plan approval. 2. Improvement Specifications. Section 190-25.D(6)(b), Section 190-27 and Section Township. Construction cost estimates have been submitted by the applicant and are presently under review by our office 3. Sanitary Sewer. Section 190-38. Maidencreek Township Authority approval for the proposed sewerage system will be required prior to Final plan approval by the Township See attached Sewer review letter from SDE to the Authority dated April 24, 2018. 4. Water. Section 190-40.Maidencreek Township Authority approval will be required for the proposed water system prior to Final Plan approval by the Township. See attached Water review letter from SDE to the Authority dated April 24, 2018. SDE MaidencreekTownshipPlanningCommission Re:Business Park at Maidencreek LDP FinalPlanReview#1 April 30, 2018 Stormwater Comments (Chapter 182 Stormwater Management): 1. PennDOT Approval, Section 182-9.H. This project will need to be coordinated with PennDOT's S.R. 222 improvements. We will defer to PennDOT for authorization of work in and adjacent to their right-of-way. 2. Erosion and Sediment Control/NPDES Permit, Section 182-11. Evidence of approval of the E&S and NPDES permit applications by Berks County Conservation District shall be provided to the Township, prior to plan approval. A copy of the plan should be provided to the Township. 3. BMP Operations and Maintenance, Section 182-32. An O&M agreement is required to be executed prior to plan approval. Sincerely, SYSTEMSDESIGNENGINEERING,INC Kgpucha Ed Kopicki Township Planning Consultant Cc: Maidencreek Township Supervisors Diane Hollenbach, Twp. Manager Eugene Orlando Jr., Twp Solicitor. GSPProperties-NorthBethlehem LLC StackhouseBensingerInc File17-0024-0708 SDE SYSTEMS DESIGN sdei.net April 24.2018 MaidencreekTownshipAuthority POBox 289 BlandonPA,19510 Re: GsPProperties--“Business Park at Maidencreek PublicSewerandWaterReview--Revised2/21/2018 Maidencreek Township Berks County,Pennsylvania Dear Authority Members: We are in receipt of the revised (2/21/2018) Plans entitled “Business Park at Maidencreek preparedby Stackhouse Bensinger Inc. The plan submittal SDE reviewed consisted of 12 sheets as follows: Plan Sheet Title Sheet Number Number Date Revised Cover Sheet C-1.1 Sheet 1 of 12 11/27/2017 2/21/2018 Existing Conditions C-2.1 Sheet 2 of 12 & Site Analysis 11/27/2017 2/21/2018 Demolition C-3.1 Sheet 3 of 12 11/27/2017 2/21/2018 Land Development C-4.1 Sheet 4 of12 11/27/2017 2/21/2018 Grading & Utility C-5.1 Sheet 5 of 12 11/27/2017 2/21/2018 Landscaping C-6.1 Sheet 6 of 12 11/27/2017 2/21/2018 Lighting (Reserved) C-6.2 Sheet 7of 12 11/27/2017 2/21/2018 Driveway, Storm & C-7.1 Sanitary Sewer Profiles Sheet 8of 12 11/27/2017 2/21/2018 Site Construction Details C-8.1 Sheet 9 of 12 11/27/2017 2/21/2018 Site Construction Details C-8.2 Sheet 10of 12 11/27/2017 2/21/2018 Site Construction Details C-8.3 Sheet 11 of 12 11/27/2017 2/21/2018 Site Construction Details C-8.4 Sheet 12of 12 11/27/2017 2/21/2018 We have reviewed the above referenced plans (revised 2/21/2018) and have the following comments foryour consideration: Site Description The tract is located on south side of Allentown Pike (S.R. 222) adjacent to Independence Court located within Maidencreek Township. The area is currently zoned as a Commercial- 1032JamesDrive,Leesport,PA19533P:610.916.8500eF:610.916.8501 Maidencreek TownshipAuthority "Business Park at Maidencreek"Plan Sewer and Water Review April24,2018 Residential District (C-R) and consists of 2 cxisting parcels totaling 4.58 acres.The intended use is for 11 semi-detached office buildings, totaling 22 office units that are 1,479 S.F. each. Sanitary Sewer 1.The Developer and/or the Developer's Agent should provide the Authority with the estimated sewage flow in gallons per day for the proposed facility. Depending on the estimated sewage flow, a DEP Planning Module Application Mailer/Postcard mayhavetobe completed and submitted to DEP. According to the attached PA DEP Letter (dated February 1, 2018),it is projected that 88 employees will work at the proposed commercial/business park and generate flows of 880 gallons per day tribuiary to MTA's sewers and wastewater treatment plant. Com ment satisfactorily addressed. See attached letter from PA DEP. 2.A note should be added to the plan that states "No floor drains shall be connected to the Maidencreek Township Authority sanitary sewer system." Comment satisfactorily addressed. 3. A note should be added to the plan which states the proposed sewage flows for this facility will contain domestic sewage only. If the proposed wastewater discharge will contain any non-domestic sewage, details will need to be submitted to the Authority for review and approval. Comment satisfactorily addressed. 4.The Developer will be responsible for the payment of all applicable tapping fees permit fees, and review fees. The sewer tapping fee will be calculated from the flow $13.77/gpd for this commercial property. Permitting may be required from the PA Department of Environmental Protection and other associated Agencies to install/connect new utilities within the 100-year floodplain if they so encroach. Comnient acknowledged by Stackhouse Bensinger Inc. 5. The ownership and ultimate maintenance of the sewer extension needs to be clarified, as it is to remain private. An Improvements Agreement for the proposed sewer improvements will need to be established. A sewer easement agreement with the appropriate legal description will need to be recorded with the final plan to allow the Authority the right to access the property in an emergency situation. MaidencreekTownshipAuthority "Business Park atMaidencreek"Plan Sewer and Water Review April 24,2018 The revised plans state the following:"Sanitary Sewer and Water Line Blankel Easement: The property owner hereby grants to the Maidencreek Tounship Authority and/or its agent the right to enter upon the property from time to time for the purpose of inspection and maintenance of the sanitary sewer and water facilities." SDE recommends thar the statement be reviewed by Authority Solicitor. 6. The proposed driveway profile"(Sheet C-7.1) shows the proposed 8-inch sanitary sewer main as smooth lined corrugated plastic pipe (SLCPP).The label shall be changed to SDR-35, which is consistent with the utility plan (Sheet C-5.1). Comnment renains. Due to proposed manholes MH-1 and MH-4 being relatively shallow, SDE recommends both manholes be fiat-top manholes. A flat-top manhole detail shall be provided. 7. The proposed utility plan (Sheet C-5.1) shows an 8-inch SDR-35 PVC sanitary sewer main on the southwest side of the property and connecting to the Authority's existing sanitary sewer system with a new doghouse manhole (MH-3). The sewer main extension has laterals which collect flow from units 15-22 and also cross below proposed Infiltration Basin 1 to collect from units 3-12. All proposed office units have their own separate sanitary sewer lateral. However, units 3-12 join together before crossing Infiltration Basin 1 (for a total of 4 crossings) and units 1, 2, 13 and 14 connect directly to the Authority's existing sanitary sewer main. SDE has multiple issues with the proposed utility plan described above, including: The proposed office units (1, 2, 13 & 14) shall not connect directly to the Authority's interceptor sewer line. This line receives a large amount of flow, making a backup to the office buildings potentially catastrophic. Per the Authority's Rules and Regulations, multiple sanitary sewer laterals shall not be combined before reaching a sewer main. Therefore, units 3-12 shall be served by their own laterals that individually connect to the proposed main(s). Due to potential maintenance and basin integrity issues, utilities (both water and sewer) shall not cross under proposed stormwater Infiltration Basin 1. Therefore, it is SDE's recommendaion that two sanitary sewer mains be installed, one on each side of proposed Infiltration Basin 1 before connecting to the Authority's existing sanitary sewer system with new doghouse manholes. The proposed office units on the north side of the existing system (Units 1, 2, 13 & 14) would then connect to these new doghouse manholes, rather than connecting to the existinginterceptor. A detail shall be provided for proposed doghouse manholes (MH-3 and MH-6), providing inverts of proposed laterals 1, 2, 13 & 14. MaidencreekTownshipAuthority Page4 Business Park atMaidencreek"Plan Sewerand WaterReview' April24,2018 The locations of the proposed laterals'vents/cleanouts shall be provided on Sheet C-5.1. 8.Due to proximity of the sanitary sewer main(s)to Infiltration Basin 1 and its surrounding geology, utility trenches shall not be backfilled with clean stone (as shown on Sheet C-8.3).Revise the "Typical Trench for Sewer Lines and Laterals" detail as necessary using 2A aggregate or 2RC aggregate. Revise detail to state:"Place 2A aggregate at 95% dry proctor density." 9. Shift proposed River Birch Tree outside the Sanitary sewer easement between Units 14 and 15. 10. Sheet C-6.1 shows a thornless honey locust tree between Units 16 and 17, which is located directly above the proposed sanitary sewer main. SDE recommends the tree be moved and planted behind the community mailboxes. 11. Sheet C-6.2 proposes a light post be constructed between Units 2 and 3 in the Authority's sanitary sewer easement. The light post shall be moved outside of the easement I2. Revise labels on all sheets referring to sanitary sewer easement as "20'Alley." 13. Due to concerns from vehicular and lydrostatic loads, SDE recommends that all sanitary sewer mains and laterals be constructed of SDR-26 pipe. l4. Remove "Saddle for Lateral Connection to Existing Sanitary Sewer Main on SheetC-8.3. Water 1. Due to proximity of the water main(s) to Infiltration Basin 1 and its surrounding geology, utility trenches shall not be backfilled with clean stone (as shown on Sheet C-8.2).Revisedetails as necessary. Revise detail to state:"Place 2A aggregate at 95% dry proctor density" 2.All proposed water lines and valves shall be clearly labeled with its respective size and type. Comment satisfactorily addressed Maidencreek TownshipAuthority Page5 "Business Park atMaidencreekPlan SewerandWaterReview April24.2018 3. As stated in theSanitary Sewer"section above.SDE has multiple issues with the proposed utility plan (Sheet C-5.1). Therefore. it is SDE's recommendation that the Developer utilize the existing 20' walerline easement at the southeast cormer of the tract to tie into the Authority's existing water system near Independence Court, upgrading the existing service to a 6-inch or 8-inch line. Afer connecting to the proposed fire hydrant, the water line shall tee into two separate water mains on each side of Infiltration Basin l. Afer all proposed office unit water services, the two water mains shall reconnect (outside of Infiltration Basin J) to create a loop to prevent excess stagnant water. The proposed water loop can be constructed of either C-900PVCorDIP. SDE recommends that the Developer obtain a new agreement or modify the original agreement for the aforenentioned 20-foot waterline easement to allow for proposed 6-inch or 8-inch water extension. Comment renains. 4. Due to timing of the PennDOT S.R. 222 Widening Project, the Developer may have significant problems in obtaining a Highway Occupancy Permit to connect to the Authority's existing12-inchwatermain. SDE recommends that the Developer tie into the Authority's existing water system near Independence Court rather than connect to existing 12-inch main on SR 222. An 8-inch gate valve shall be placed on the water main between the proposed water main loop and connection point for increased operator control Comment remains. 5. The ownership and ultimate maintenance of the water main extension needs to be clarified, as it is to remain private. An Improvements Agreement for the proposed water improvements will need to be established. A water easement agreement with the appropriate legal description will need to be recorded with the final plan to allow the Authority the right to access the property in an emergency situation. The revised plans state the following: "Sanitary Sewer and Water Line Blanket Easement: The property owner hereby grants to the Maidencreek Township Authority and/or its agent the right to enter upon the property from time to time for the purpose of inspection and maintenance of the sanitary sewer and water facilities." SDE recommends that the statement be reviewed by Authority Solicitor. Maidencreek Township Authority requests dedication of the water line extension from the connection near Independence Court to the proposed fire hydrant The Authority will also need access to all water service meters for billing purposes. 6.The Property Owner will be responsible for all applicable costs (tapping fees,review fees, permit fees, etc.). The property owner will also be responsible for the cost and installation of the meters. Each unit will require a separate meter, so 22 meters will MaidencreekTownshipAuthority Page 6 "Business Park at Maidencreek"Plan Sewer and Water Review April24,2018 be required.A tapping fee is $7.98/gpd.Themeters will be provided by the Authority.A note shall be placed on the plan stating thatAdditional fees may be reguired based on water and sewer use reviewed on a yearly basis complying with all rules and regulations of the Maidencreek Township Authority for tapping fees. Note was not added to plans. Comment remains. 7. The Authority will provide hydrant testing for flow and pressure on the 8" water main in Independence Court to assist the developer in determining if there is sufficient flow and pressure to serve the development in lieu of the connection to the 12"main in SR 222. Comment acknowledged by Stackhouse Bensinger Inc. 8. The locations of all proposed curb stops at each unit shall be provided on Sheet C. 5.1. 9. Revise the "Service Connections" detail shown on Sheer C-8.2 to State that all proposed water services be 3/4-inch pipe. General 1. The Maidencreek Township Authority reserves the right for additional comments. If you should have any questions, please contact our office. Sincerely, Systems Design Engineering, Inc. Pamela J. Stevens, P.E. AuthorityEngineer CC: Maidencreek Township Supervisors MaidencreekTownshipPlanningCommission Dan Becker, Esq. Stackhouse Bensinger, Inc. GSP Properties-North Bethlehem, LLC 17-0466-0541GSPPlanReview SYSTEMSDESIGN SDE "APassion for Engineering Excellence ENGINEERING,INC sdei.net April 25,2018 Maidencreek Township PO Box 319 BlandonPA19510 Re: MaidencreekTV andAppliancePlanReview Maidencreek Township Berks County DearTownship Officials: We are in receipt of a Plan entitled Maidencreek TV and Appliance Proposed Layout Plan prepared by Berks Surveying & Engineering, Inc. The site is the existing site of the Maidencreek TV and Appliance store located along the north side of Rt 222 approximately 400 feet from the intersection of Rt 222 and Lake Shore Drive. The site is 1.9 acres in size and zoned C-1 Local Commercial. The plan reflects a proposed change of building location due to PennDOT taking of right-of-way. The plan submittal consists of 7 sheet as follows: TITLE SHEETNUMBER DATE REV. Proposed Layout Plan C101 4.12.18 Grading/Utility Plan C102 4.12.18 Existing Site Plan C103 4.12.18 Detail Sheet C104 4.12.18 Photometric Plan PH101 4.12.18 E&SPCPlan ES101 4.12.18 E&SPCDetails ES102 4.12.18 We have reviewed the above referenced plans and have the following comments for your consideration: Zoning: 1. Permitted Use. Section 220-41. The proposed use of a retail store is a use permitted by right in the C-1 Local Commercial District. 1032James Drive, Leesport,PA19533.P:610.916.8500.F:610.916.8501 Schuylkill Haven,PAeP:570.385.5549 Boyertown,PA P:610.369.1319 Maidencreek TownshipPlanning Commission Re: MaidencreekTVandAppliance LDP LayoutPlanReview April25,2018 Page 2 2. Maximum Impervious Cover. Section 220-42. The maximum impervious cover allowed is 65%. The proposed impervious cover is 72%(same as existing). In addition, it appears that the total square footage of the new structure will be less than the previous PennDOT was not at the applicants asking. A Zoning Variance will be required. 3. Front Yard Set Back. Section 220-42. The plan correctly has located the front yard set back as 50 feet for the present Zone, however Section 220-75 indicates that a Front Yard set back is to be 100 feet from the centerline of Rt. 222. There is no proposed violation however the plan should reflect this and the owner should be aware of this highway set back. 4. Rear Yard Set Back. Section 220-42. The proposed building encroaches into the required 25 foot rear yard. A Zoning Variance will be required. 5. Nonconforming Uses of Land. Section 220-105. Any existing nonconforming use of land such as lot coverage and setbacks, should be given consideration for this land development. Most violations have been lessened with this proposal. SALDO: 1. Landscaping. Section 190-44G.5. Landscaped areas shall be protected from the encroachment of vehicles by use of curbing, wheel stops, bollards, or other approved barriers. 2. Lighting. Section 186-47. A Lighting plan has been submitted. I would suggest either reducing the lumens on the building entrance light or provide a shield on the front of the light. The entrance light is noted to be twice the lumens required by this section of the ordinance. In addition, back shielding should be provided for the parking lot lights along SR 222. SDE Maidencreek Township Planning Commission Re: Maidencreek TV andAppliance LDP Layout Plan Review April25,2018 Stormwater Comments: 1. Stormwater Permit Required. Section 182-8. A stormwater permit will be required, based on the definition of“regulated activities."The application can be obtained from the Township or this office. 2. Erosion and Sediment Control. Section 182-11.A. Evidence of E&S Plan approval by Berks County Conservation District must be provided to the Township, prior to issuance ofaStormwaterPermit. 3. Swale Design. Section182-17.D.(21) The swale proposed between the front parking lot and the PennDOT right-of-way should be designed and lined as needed for stability. 4. Swale Design. Section182-17.D.(21)(d) Flow in the swale crosses the southern driveway on its way to a stone trench. Additional spot elevations are recommended on and adjacent to the driveway, to ensure flow across the driveway is uninterrupted and concentrated so that ponding and icing do not occur. Depending on the upstream drainage area, this applies to a lesser extent to the northern driveway, which similarly dips toallowrunofftocross. 5. Landowner Statement. Section 182-22.B.(22) A statement should be added to the plan, signed by the landowner, acknowledging that any revisions to the approved drainage plan must be approved by the Township of Maidencreek and the Conservation District. 6. Design Engineer's Certification. Section 182-22.B.(23) The signature block shall be added and executed. 7. Stormwater Facilities. Section 182-22.D.(1) Roof drains, leaders, etc. should be shown. SDE MaidencreekTownshipPlanningCommission Re: Maidencreek TV and Appliance LDP Layout Plan Review April 25, 2018 8. Stormwater Calculations. Section 182-22.D.(3) The design basis and maintenance requirements for the stone trenches should be provided; e.g.; design storm, overflow provisions, etc. 9. Operation and Maintenance Agreement. Section 182-32. An O&M Agreement is required for the stormwater BMPs. A “mini" agreement should be acceptable and a blank canbe obtained from the Township or this office. General Comments: 1. Public sewer and public water is available for this parcel. Approval by the Maidencreek Township Authority for the proposed sewer and water design will be required prior to construction. See attached review letter dated April 24, 2018 from SDE to the Authority. 2. PennDot issues regarding access and/or construction easements will need to be resolved prior to construction. 3. I suggest a few shade trees be planted in those portions of the parking lot that would allow such plantings. Sincerely, SYSTEMSDESIGNENGINEERING,INC. Ed Kopicki Township Planning Consultant Cc: MaidencreekTownship Supervisors Diane Hollenbach, Twp. Manager Eugene Orlando Jr., Twp Solicitor. DKB Realty, LLC Berks Surveying & Engineering SDE SYSTEMSDESIGN NGNRNCN sdei.net April24,2018 Maidencreek Township Authority POBox289 BlandonPA,19510 Re: MaidencreekTV&Appliance Public Sewer and Water Review MaidencreekTownship Berks County,Pennsylvania Dear Authority Members: We are in receipt of the Plans entitled Maidencreek TV & Appliance"prepared by Berks Surveying & Engineering, Inc. Theplan submittal SDEreviewed consisted of7sheetsas follows: Plan Sheet Title Sheet Number Date Number Proposed Layout Plan C101 Sheet 1 of 7 04/12/2018 Grading/UtilityPlan C102 Sheet 2of7 04/12/2018 Existing SitePlan C103 Sheet 3of 7 04/12/2018 Detail Sheet C104 Sheet 4 of7 04/12/2018 Photometric Plan PH101 Sheet 5of7 04/12/2018 E&SPCPlan ES101 Sheet 6of7 04/12/2018 E&SPCDetails ES102 Sheet 7of7 04/12/2018 We have reviewed the above referenced plans and have the following comments for your consideration: Site Description The site consists of 5.29 acres and situated in the "C-j"-Local Commercial District. The site is located along SR 0222 in the Penn DOT Improvements Project Section 22S.The Sketch plan reflects the relocation of the business to the rear of the property including a proposed new building and a new macadam parking lot. Sanitary Sewer 1. Due to concems from vehicular loads, SDE recommends that all sanitary sewer be constructed of SDR-26pipe. 2. Construction of the sanitary sewer lateral shall be in compliance with the Authority's StandardRulesandRegulations, 1032JamesDrive,Leesport,PA19533P:610.916.8500eF:610.916.8501 MaidencreekTownship Authority Maidencreek TV&Appliance"Plan SewerandWaterReview April24,2018 3. The proposed sanitary sewer lateral shall be privale and be the sole responsibility of the Property Owner. Water 1.Due to timing of the PennDOT S.R.222 Widening Project, the Property Owner may have significant problems in obtaining a Highway Occupancy Permit to connect to the Authority's existing water main on S.R.222.The new water service proposed by the Authority on SR 222, may notbe available for connection until late 2019 to well into 2020.Another option could be to look at connecting to the Authority's existing 6-inch water main on Quarry Road and obtain the appropriate utility easement from Redner's Development Company and/or Maidencreek Township. The connection to Quarry Road could then provide a permanent connection and avoid the potential issues obtaining a HOP or potential conflicts during the construction of the SR 222 Project. 2. Construction of the water service connection shall be in compliance with the Authority's Standard Rules and Regulations. 3.The proposed water service connection shall be private and be the sole responsibility of the Property Owner. Ifyou should haveanyquestions,pleasecontactouroffice. Sincerely, Systems Design Engineering, Inc. Pamela J. Stevens, P.E. AuthorityEngineer cC: Maidencreek Township Supervisors MaidencreekTownshipPlanningCommission Dan Becker, Esq. Berks Surveying&Engineering,Inc. MaidencreekTV&Appliance File#17-0466-0539 Chk Billed/Paid to Date By Fee Paid Applicant KTOWNSHIP SEOACTIVITYREPORT 4/1/18-4/30/18 Applicant/Activity MAIDENCREEK , admin/filing. SEO report, App. # 18-0019-0300 SDE# T. Unger 2 copies SEO Desk Cc: