Other Township Records

Road Crew Report — July 2018

Date
Date unknown
Type
Report
Year
2018
File
PDF · 2.6 MB

Download original Open in browser

Document text

Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 256 words

Road Crew Report July 2018
July 2-6
Collect trash
Mow grass in all parks
Formed garage bay #1 driveway and poured concrete
Replaced slide in Community Park
Villa Circle and Guldin sinkhole. Requires pipe repair - see attached cost of materials.
Mowed open space
July 9-13
Collect trash
Cut trees 370 & 374 Blandon Meadows Pkwy in open space, Villa Circle at street light
Fixed Township building downspout
Rip rap storm water pipe outlet.
Mow grass.
Removed blacktop from Township parking lot.
July 16-20
Collect trash
Repair Hoch Road blacktop
Formed and poured curbs for handicap parking at building
Sticky banded trees in parks and open space for lantern flies
Poured new curb at 233 Spirit Court
Mow grass behind Lake Ontelaunee
Clean debris out of salt shed
July 23 - 27 (rained most of week)
Collect trash
Sign repair Dries and Rt 222
Removed tree and damaged play structure at Blandon Fire Company.
Equipment maintenance
Checked bridges, culverts and drains for blockages and flooding
Sinkhole at Millennium and Stirling - plated and called Engineer
July 30-31
Collect trash
Removed debris from Willow Creek behind 354 Blandon Meadows Pkwy (picture
attached)
Repair Ridge Road
Grade West Shore and Ridge Road drainage

Crcle
p:pe
repa
s0' sf ppe
540.0.
30,00
yo fons dn Stone
350.00
+ronch Roiler (3days )
A 7G5.00
48" Smocth Roller (Q days)
yso.00
且 74.31
SHEETS
100SHEETS
SHEETS
Coocrete
(Q skss)
+ 305.d8
50
200
Roud Suw
22-142
载 195.00
22-1
22-1
(iQtens)
Jsmm
+ 506.40
(8,dsfons)
Top
9.5 mm
$ 3,77d. 94

Archived from the Maidencreek Township website. Reproduced unaltered; not an official records repository.