Board of Supervisors
Hazard Mitigation Resolution — August 9, 2018
- Date
- August 9, 2018
- Type
- Resolution
- Year
- 2018
- File
- PDF · 1.7 MB
Document text
Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 638 words
MunicipalHazardMitigationPlanUpdateAdoptionResolution:
TOWNSHIPOFMAIDENCREEK
Berks County, Pennsylvania
RESOLUTIONNO.
-2018
ARESOLUTION
OF
OF
THE
BOARD
SUPERVISORS
OF
MAIDENCREEK TOWNSHIP,BERKS COUNTY,PENNSYLVANIA, TO
ADOPTTHEHAZARDVULNERABILITYASSESSMENT
AND
MITIGATIONPLANUPDATEFORMAIDENCREEKTOWNSHIP.
WHEREAS, the County Commissioners of Berks County authorized the preparationof a Hazard
Vulnerability Assessment and Mitigation Plan Update ("Hazard Plan Update") on behalf of the
County's municipalities; and
WHEREAS, Skelly and Loy, Inc., was selected as the consultant to assist the County in the
preparation of the Hazard Plan Update; and
WHEREAS, a Steering Committee held public meetings to consider the draft Hazard Plan
and October 23, 2017.
WHEREAS, the Steering Committee and the Berks County Department of Emergency Services
recommended that the County Commissioners and each municipality in Berks County adopt the
Hazard Plan Update; and
WHEREAS, the Board of Supervisors ("Governing Body") of Maidencreek Township recognizes
management of natural hazards in the municipality and therefore desires to adopt the Hazard
Berks County, Pennsylvania, as follows:
Hazard Vulnerability Assessment and Mitigation Plan Update” hereinafter referred to as the
"Hazard Plan Update", together with its appendices, prepared by Skelly and Loy, Inc., in the
form and content presented at a duly advertised public meeting, as the municipal Hazard Plan
Update for Maidencreek Township.
Section 2: The Hazard Plan Update as adopted by the Governing Body shall include the
following chapters and all charts, tables, diagrams, appendices, figures and textual matter
contained therein:
1.
Introduction
2.
Community Profile
3.
Planning Process
4.
RiskAssessment
5.
CapabilityAssessment
6.
Mitigation
7.
PlanMaintenanceProcedures
8.
Plan Adoption
Section 3: The Hazard Plan Update shall include the maps entitled:
1.
Location Map
2.
Flooding Hazards
3.
Flooding HazardsComparison
4.
Geologic Hazards
5.
Wildfire Hazards
6.
Hopewell Wildfire Location Map
7.
Density of Repetitive Loss Properties by Municipality
8.
Regional Growth Areas Impacted by 100-year Floodplains
Section 4:
This Resolution shall become effective and be in force immediately.
DULY ADOPTED this 9th day of August, 2018, by the Board of Supervisors of Maidencreek
Township,BerksCounty,Pennsylvania,inlawfulsessiondulyassembled.
Maidencreek Township
BerksCounty,Pennsylvania
By:
Claude Beaver Chairman
JosephRudderow Ill
Attest:
Secretary
Heidi Fiedler
BERKSCOUNTYHAZARDVULNERABILITY
ASSESSMENTANDMITIGATIONPLANUPDATE2018
The format of the Berks County Hazard Mitigation Planwas updated per the new Pennsylvania Standard
Operating Guide (SOG). This included the addition of three new sections (2, 3 & 8) and merging of two
sections (Hazard Mitigation Goals and Hazard Mitigation Strategies).
1.INTRODUCTION
This section was reorganized perthe SoG.Planning process information was moved to Section3 and
plan adoption information was moved to Section 8.
2.COMMUNITYPROFILE
This is a new section added to comply with the SoG requirements. It contains a community profile
of Berks County including a brief overview of the geography, environment, community facts,
population, demographics, land use and development.
3.PLANNING PROCESS
The information in this section previously existed in the Introduction of the 2013 plan and is now a
standalone section per the SOG requirements.
4.RISKASSESSMENT
The following information was updated or added:
- Disaster History updated
-NFIP status and claims data updated
- Hazard event profiles updated
-Future occurrences addedto hazard eventprofiles
- New hazard event profile for technological hazards and cyber security/attacks added
- Vulnerable structures updated
- Ranking results added
-HazusRiskAssessmentupdated
-Future development and vulnerability-Preservation priorityareas mapping added
5.CAPABILITYASSESSMENT
No changes to this section (previously Section 4 of 2013 plan).
6.MITIGATION
Onegoal was reprioritized:
1.Ensure that emergency communications systems are available and adequate at all levels
"moderate".
Three new goals were added:
NaturalResourcesProtection
1.Stabilizeerosionhazardareas.
Public Information
Educate farmers about the various soil conservation programs available in the county.
2.
Increase hazard education and risk awareness in general for the hazards that occur in
Berks County.
3.
Encouragemunicipal participation inthehazard mitigationplanningprocess.
Berks County DEs to incorporate hazard mitigation training during its January
coordinationmeetingswithstakeholders.
7.PLANMAINTENANCE
No changes to this section (Previously Section 6 of 2013 plan).
8. PLAN ADOPTION
The information in this section previously existed in the Introduction of the 2013 plan and is now a
standalone section per the SOG requirements.