MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS September 13, 2018 ENGINEER'SAGENDA Subdivision Review Status Checklist Next Supervisors Meeting October11,2018 Berkshire Building Service expires 9/14/18; Time extension required if no action on plan taken. GsP Properties expires 9/13/18; Time extension required if no action on plan taken. Subdivision / Zoning / LDP Plans currentlyinreview. GSP Properties Final LDP - See SDE Itr. dated 6/5/18; Planning Commission action Itr. dated 7/12/18 mtg. Berkshire Building Services Final LDP -- See SDE Itr. dated 9/1/18; Planning Commission action Itr.Dated 9/6/18. Melrose Place Paving completed, sidewalks & street trees installed. Punchlist for entire development compiled; Contractor working to completePunchlist items. Street descriptions for dedication under review. Projects Stormwater Projects O Ina/Rt. 73 - Lindbergh/Adele - on hold. West Shore Drive Meet with inspector for state regarding Bridge Inspection. Report. Repairs are somewhat extensive; Twp. Involvement is possible Three (3) 60" dia. Pipes required as alternative to existing opening. Not desirable due to maintenance. Twp. to make repairs as schedule permits. Page 1 of 2 I:(Projects\MaidencreekTownship/18-0019-0100\Engineer's Agenda|9.13.18.docx 2018 Road Projects Contract "A" road paving contract Awarded to H&K Group in the amount of $199,825.14 (Includes both parking lot areas on Quarry Rd.) Contract "B" cold-in-place recycling Evansville Rd. contract awarded to H&K Group in the amount of $103,990.86. Notice to Proceed issued 7/2/18 with start date of 7/25/18. Time extension Change Order No. 1 sent to H&K for execution Contract “B" cold-in-place recycling Evansville Rd. started 9/4/18. Schaeffer Road Bridge Continue to attended construction mtg. Contractor/Engineer/PennDOTworking thru issues with pile driving. Time extension being coordinated. Main St./Grove Rd. Intersection Surveying for clear sight distances. Sinkholes Meadow Brook-Millennium Drive Meadowbrook -Prescott Rd. Both sinkhole stormwater pipe videoed; no issues evident Township road crew to begin excavation & repair. Subdivision Improvement LOC/Escrow Release Sewage Enforcement Officer Activity Report Page 2 of 2 I:\Projects\MaidencreekTownship/18-0019-0100\Engineer's Agenda\9.13.18.docx Most Recent Letter Date 3/6/2018 2/8/2018 9/1/2018 Review 7/6/2018 See SDE Itr. 3/6/18 and MTPC ltr. 1/3/18&2/8/18 See SDE Itr.Dated 9/1/18 See SDE Itr. Dated 7/6/18 Comments P.C. Action ltr. 1/4/18 Dated 4/5/18 See SDE Itr. Approved 04/12/18 BY BOS 02/08/18 MAIDENCREEK TOWNSHIP,BERKSCOUNTY (may reflect more than one extension) Extension 06/05/18 09/14/18 09/13/18 SUBDIVISION STATUS 9/13/2018 Period Ends 03/06/18 03/06/18 06/05/18 90-Day Review 07/31/18 Review Period 12/06/17 03/07/18 12/06/17 Begins 05/02/18 90-Day Plan Stage Final Prel. LDP LDP LDP Final Prel. LDP APPROVED/PENDING PLANS: GSP Properties - Business Park GSP Properties - Business Park Berkshire Building Services Berkshire Building Services CURRENTPLANS: Project Name No. MAIDENCREEKTWP.PLANNINGCOMMISSION P.O.BOX319,BLANDON,PA19510 July 12, 2018 Maidencreek Township Board of Supervisors POBox319 Blandon, PA 19510 Dear Board, At their July 11, 2018 meeting, the Maidencreek Township Planning Commission recommended by formal motion that the Board of Supervisors grant final plan approval to the Business Park at Maidencreek Land Development Plan conditional upon compliance with the comments in the July 6, 2018 and June 22, 2018 Systems Design Engineering, Inc. review letters which are incorporated by reference. If you have any questions, please call me at (610) 926-4920. Sincerely, Diane Hollenbach Manager MaidencreekTownship CC: Stackhouse Bensinger SYSTEMS DESIGN sdeite! July 6, 2018 MaidencreekTownship Planning Commission PO Box 319 Blandon PA19510 Re: Business Park at Maidencreek Land Development Plan Final PlanReview#3 Maidencreek Township Berks County Dear Planning Commission Members: We are in receipt of a Final Plan entitled Business Park at Maidencreek prepared by Stackhouse Bensinger Inc. (SBI) of Sinking Spring PA. The owner of the tract is GSP Properties-North Bethlehem,LLC ofAllentown PA. The site consists of 9.4 acres and is located in the "CR-Commercial Residential District". The site is located along the south west side of Rt. 222, has 260 feet of frontage and is approximately 925 feet deep being rectangular in shape. A single access private drive/parking lot is being proposed through the center of the tract terminating in a cul-de-sac. There are 22 - 1,479 square foot office buildings being proposed in 11 duplexes with perpendicular parking provided fronting the units. The SBl plan submittal consists of 21 sheets as follows: TITLE PLAN NUMBER Cover Sheet DATE REV. C-1.1 Ex. Cond, Site Analysis 11-27-17 6-27-18 C-2.1 Demolition 11-27-17 6-27-18 C-3.1 Land Development 11-27-17 6-27-18 C-4.1 Grading and Utility 11-27-17 6-27-18 C-5.1 Landscaping 11-27-17 6-27-18 C-6.1 Lighting 11-27-17 6-27-18 C-6.2 Driveway, Storm, SanitaryProfiles 11-27-17 6-27-18 C-7.1 Storm Profiles 11-27-17 6-27-18 C-7.2 Site Construction Details 11-27-17 6-27-18 C-8.1 Site Construction Details 11-27-17 6-27-18 C-8.2 Site Construction Details 11-27-17 6-27-18 C-8.3 Site Construction Details 11-27-17 6-27-18 C-8.4 Pre-Construction Cond. Plan 11-27-17 6-27-18 C-PCC PCSMandO&MPlan 11-27-17 6-12-18 C-PCSM1 PCSM and O&M PlanDetails 11-27-17 6-12-18 C-PCSM2 11-27-17 6-12-18 1032 James Drive, Leesport,PA19533P: 610.916.8500F: 610.916.8501 MaidencreekTownshipPlanningCommission Re: BusinessParkatMaidencreekLDp FinalPlanReview#3 July 6.2018 Page 2 PCSM and O&M Plan Details C-PCSM3 11-27-17 PCSM andO&M PlanDetails 6-12-18 C-PCSM4 11-27-17 Erosion&SedimentControlPlan 6-12-18 C-ESC1 3-09-18 E&SCPlan Details 6-12-18 C-ESC2 3-09-18 E&SC Plan Notes 6-12-18 C-ESC3 3-09-18 6-12-18 We have reviewed the above referenced plan and have the following comments for your consideration: Zoning: No Comments SALDO: 1. Erosion and Sediment Control. Section 190-41. An erosion and sediment control plan will need to be approved by the Berks County Conservation District prior to Final Plan approval. 2. Improvement Specifications. Section 190-25.D(6)(b), Section 190-27 and Section 190-31. An Improvements agreement will be required prior to final plan approval by the Township. Construction cost estimates are to be revised per the stormwater management redesign and submitted for review. We are in receipt of the revised cost estimate and they are presently under review. 3. Sanitary Sewer. Section 190-38. Maidencreek Township Authority approval for the proposed sewerage system will be required prior to Final plan approval by the Township. The Authority granted conditional approval based on the SDE review letter dated June 22, 2018 (attached). 4. Water. Section 190-40. Maidencreek Township Authority approval will be required for the proposed water system prior to Final Plan approval by the Township. See above. 5. Erosion and Sediment Control/NPDES Permit, Section 182-11. Evidence of approval of the E&S and NPDES permit applications by Berks County Conservation District shall be provided to the Township, prior to plan approval. A copy of the plan should be provided to the Township MiaidencreekTownshipPlanningCommission Re: Business Park at Maidencreek LDp FinalPlan Review*3 July 6, 2018 Page 3 6. BMP Operations and Maintenance, Section 182-32. An O&M agreement is required to be executed prior to plan approval. A sample agreement based on the stormwater ordinance model has been submitted. Additional language will be necessary due to the proposed stormwater system now relying on off-site conveyance facilities to function. The Township solicitor is in receipt of a revised O&M Agreement to review. 7. Stormwater Easements, Section 182-33. Easement documentation for the new off-site storm sewer conveyance must be provided. Easement and or O&M documentation must indicate what entity(ies) are responsible for maintenance of the off-site facilities. The applicant has submitted a signed Easement Agreement from Georgetown Village Home Owners Association. The O&M Agreement is under review by the Township's solicitor. Additional Comments: No additional comments. Sincerely, SYSTEMSDESIGNENGINEERING,INC Ed Kopicki Township Planning Consultant Cc: Maidencreek Township Supervisors Diane Hollenbach, Twp. Manager Eugene Orlando Jr., Twp Solicitor. GSP Properties-North Bethlehem LLC Stackhouse Bensinger Inc. File 17-0024-0708 MAIDENCREEKTWP.PLANNINGCOMMISSION P.O.BOX319,BLANDON,PA19510 September 6, 2018 MaidencreekTownshipBoardofSupervisors PO Box 319 Blandon, PA 19510 At their September 5, 2018 meeting, the Maidencreek Township Planning Commission recommended by formal motion that the Board of Supervisors grant conditional final plan approval to the Berkshire Building Services Land Development Plan conditioned upon satisfaction of the September 1, 2018 Systems Design Engineering, Inc. review letter, which is incorporated byreference. If you have any questions,please call meat (610) 926-4920. Sincerely, lerhac Diane Hollenbach Manager MaidencreekTownship cC: Berks Surveying and Engineering Inc. SYSTEMSDESIGN A Pession for Ergirserir ENGINEERING,INC sdei.net September 1, 2018 Maidencreek Township Planning Commission PO Box 319 BlandonPA19510 Re: Berkshire Building Services Development Plan Final Plan - 2nd Review Maidencreek Township Berks County Dear Planning Commission Members: We are in receipt of a Final Plan entitled Berkshire Building Services (BBS) Overall Site Plan prepared by Berks Surveying & Engineering, Inc. The present owner of the tract is Jeffrey and Carol Baum of Fleetwood and the equitable owner is Berkshire Property Management Company, LLC of reading. The site consists of 5.29 acres and is located in the “I Industrial District". The site fronts the Norfolk Southern Rail Road tracks to the north, the Norfolk Southern abandoned rail road property to the south and is accessed from West Wessner Road to the west. The Final Plan reflects a proposed warehouse with an office, a macadam driveway entrance and stone driveway/parking lot area. The site is presently wooded however many trees have been removed from the site to date. The plan submittal consists of 8 sheets as follows: TITLE SHEETNUMBER DATE REV. BBS Overall Site Plan LD 101 11-22-17 07-18-18 BBS Layout Plan LD 102 11-22-17 07-18-18 BBS Grading/Utility Plan LD103 11-22-17 07-18-18 BBS Existing Site Plan LD 104 11-22-17 07-18-18 BBS Detail Sheet LD105 11-22-17 07-18-18 BBS Profile/Detail Sheet LD 106 11-22-17 07-18-18 BBS Sewer/Water Detail Sheet LD 107 12-20-17 07-18-18 BBS Lighting Plan PH 101 02-09-18 Included with the Final Plan were the following Post-Construction Stormwater Management (PCSM) Plan sheets: TITLE SHEETNUMBER DATE REV. 1032 James Drive, Leesport, PA19533.P:610.916.8500.F:610.916.8501 SchuyillHcven,PA=P:570.385.5549 Boyertown.PA P:610.369 131 Maidencreek Township Planning Commission Re: Berkshire Building Services LDP Final Plan 2nd Review September 1, 2018 Page 2 Overall Site Plan PS 101 12-21-17 07-18-18 PCSM Plan PS 102 12-21-17 07-18-18 Existing Site Plan PS 103 12-21-17 07-18-18 PCSM Details PS 104 12-21-17 07-18-18 Also included with the Final Plan were the following Erosion and Sediment Pollution Control (E&SPC) Plan sheets: TITLE SHEETNUMBER DATE REV. Overall SitePlan ES 101 12-21-17 07-18-18 E&SPCPlan ES 102 12-21-17 07-18-18 Existing Site Plan ES 103 12-21-17 07-18-18 E&S Details ES 104 12-21-17 07-18-18 Profile/Detail Sheet ES 105 12-21-17 07-18-18 The following miscellaneous documents by Berks Surveying & Engineering, Inc. were included: Plan Response Letter, dated 8-16-18 Authority Response Letter, dated 8-16-18 Improvements Cost Estimate, dated 8-16-18 Stormwater Report, dated 7-18-18 We have reviewed the above referenced documents and have the following comments for your consideration: Zoning: No Comments. SALDO: 1. Erosion and Sediment Control. Section 190-41. An erosion and sediment control plan will need to be approved by the Berks County Conservation District prior to Final Plan approval. 2. Improvement Specifications. Section 190-31. An Improvements agreement will be required prior to final plan endorsement by the Planning Commission and the Township Supervisors. Construction costs estimates have been submitted and are under review by our office SDE Maidencreek Township Planning Commission Re: BerkshireBuilding ServicesLDP Final Plan 2nd Review September 1, 2018 Page 3 3. Financial Security. Improvements Guarantee. Section 190-27.B.4. The Final Plan shall not be signed until the improvements guarantee has been executed. Construction cost estimates have been submitted and are presently under review by our office. 4. Maintenance Guarantee. Section 190-27.E.(1). When Maintenance of stormwater retention facilities is to be the responsibility of the individual lot owner, the Board shall require that the maintenance responsibilities be set forth in perpetual covenants or deed restrictions binding on the land owners' successors in interest, and may further require that an initial maintenance fund be established in a reasonable manner. 5. MTA approvals: Our office has reviewed the proposed sewer connection and water (service from a proposed on site well). All proposed connections appear favorable however Final approval will be required by the Maidencreek Township Authority prior to Final Plan approval by the Township Supervisors. Stormwater: 1. General Requirements. Section 182-9.G. DEP has been involved in regulation of the 60-inch pipe culvert and associated watercourse. Evidence of approval and/or authorization of the work by DEP shall be provided to the Township. 2. Erosion and Sediment Control Permitting. Section 182-11. Evidence of approval of the E&S and NPDES/Construction permit shall be provided to the Township prior to earthdisturbanceactivities. 3. Operations and Maintenance Agreement. Section 182-32. The property owner shall sign an O&M agreement with the Township addressing the terms cited in this section, prior to final plan approval. There is a sample agreement in the Stormwater Ordinance. 4. Stormwater Management Easements. Section 182-33.B. Stormwater easement(s) shall be provided as specified in this section. Note 30 has been added to LD101, providing a “blanket" easement for access and inspection. The Township Solicitor should review this proposal for adequacy. SDE Maidencreek Township Planning Commission Re: Berkshire Building Services LDP Final Plan 2nd Review September 1, 2018 Page 4 Sincerely SYSTEMS DESIGN ENGINEERING, INC. Ed Kopicki Township Planning Consultant Cc: Maidencreek Township Supervisors Diane Hollenbach, Twp. Manager Eugene Orlando Jr., Twp Solicitor. Berks Surveying & Engineering Berkshire Property Management Company, LLC File17-0024-0707 SDE LandisC.Deck&SonsSiteContractors 316NewSchaefferstownRoad Bernville, Pa.19506 Date: August 13th, 2018 Subject: TimeExtensionRequest To: Diane Hollenbach--MaidencreekTownship From: LenHatter We are writing this letter to notify you that we are respectfully requesting an extension of time to complete your project. Throughout this year we have repeatedly lost time due to the extremely wet continueinthefuture. At this time we are requesting that the time be extended to the end of the official paving season per Penn Dot. Please be advised that every attempt will be made to complete your project in the timeliest manner possible as is permitted. to this request. If you have any questions, please feel free to contact me at 610-222-3615. Thank you. LenHatter CC:NeilMease-GeneralSuperintendent GaryDeck-Regional Superintendent File SYSTEMSDESIGN Transmittal Letter SDE ENGINEERING,INC Engineers·Surveyors·Planners·ConstructionManagers 1032JamesDrive·Leesport,PA·19533 Tel (610)916-8500·Fax(610)916-8501·sde@sdei.net To: Landis C.Deck & Sons Date: 8-30-2018 File No. 18-0019-0115 316NewSchaefferstownRoad Re: MaidencreekTownship Bernville,PA 19506 2018PavingProject Contracts A and B Change Order#1 Attn: Len Hatter WEARESENDINGYOU: Attached Via Separate Mail Copy of Letter Prints/Plans Specifications Change Order As Noted Other Copies Date No. Description 8-30-2018 ChangeOrder#1ContactAandContractB THESEARETRANSMITTED: For Approval As Requested Returned for Correction Other ForYourUse Review/Comment ForYour Information Remarks Len: Please signall ofthe changeorder forms andall of themto me. Thank you. CC: Project File Signed MaidencreekTwpATTN:DianeHollenbach(email) Please notify us immediately if enclosures are not as noted. Boyertown Schuylkill Haven 610-369-1319 570-385-5549 I:(Projects\MaidencreekTownshipl18-0019-01152018Annual PavingProject/2018-08-30Trans-C.0.#1toH&KGroup.docx EICDCE ENGIP.EERSJOINTCOI,TAAC DOCUMEAIS COMMITTEE Change Order No. Dateof Issuance:August30,2018 Effective Date: August 24, 2018 Owner: MaidencreekTownship Owner's Contract No.: Contracts Aand B Contractor:H&KGroup,Inc. Contractor's Project No.: Engineer: Systems Design Engineering, Inc. Engineer'sProjectNo.: 18-0019-0115 Project: 2018 Paving Project Contract Name: TheContractis modifiedasfollowsuponexecutionofthis ChangeOrder: Description:Extension of contract time. H&K Group, Inc.will not charge the Owner for any asphalt price escalation past August 24, 2018. Attachments:None CHANGEIN CONTRACTPRICE CHANGE INCONTRACT TIMES [note changes in Milestones if applicable] Original Contract Price: Original Contract Times: SubstantialCompletion:August 24,2018 ReadyforFinalPayment:_September23,2018 days or dates [Increase] Qecrease]frompreviouslyapproyedChange [lncrease] [Decrease] frompreviouslyapprovedChange Orders No. to No. : to No. OrdersNo. N/A Substantial Completion: Ready for Final Payment: days Contract Price prior to this Chapge Order: Contract Times prior to this Change Order: Substantial Completion:August24,2018 ReadyforFinalPayment:September23,2018 days or dates [Increase] [Decreaseof this Chang Order: [Increase] [Decrecej of this Change Order: Substantial Completion: 52 days ReadyforFinal Payment: 38 days days or dates ContractPrice incorporating this Change Order: Contract Timeswithallapproved Change Orders: Substantial Completion: October15,2018 ReadyforFinaiPayment: October31,2018 days or dates RECOMMENDED: ACCEPTED: ACCEPTED: By: By: By: Engikeer(if required) Owner (Authorized Signature) Contractor(Authorized Signature) Title: Title Township Engineer Township Manager Title Date: 8/30/18 Date Date ApprovedbyFundingAgency (ifapplicable) By: Date: Title: EJCDcC-941,ChangeOrder. Prepared and published 2013bythe EngineersJoint Contract Documents Committee. Page 1of 1 SUMMARY IMPROVEMENTAGREEMENTSINVOICES APPROVEDFORPAYMENT MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS SEPTEMBER13,2018 DATEOFINVOICE/PAYEE INVOICE NO. AMOUNT 1. Melrose Place 8/31/18 Maidencreek Twp. - Re: SDE, Inc. 93157 $2,329.98 AMOUNTDUE $2,329.98 2. Mid Atlantic Energy Concepts 8/31/18 Maidencreek Twp. - Re: SDE, Inc. 93158 $118.36 AMOUNTDUE $118.36 3. Schwab Inspection 8/31/18 Maidencreek Twp. - Re: SDE, Inc. 93159 $118.36 AMOUNTDUE $118.36 TOTALAMOUNTDUE $2.566.70 I:\Projects/MaidencreekTownship/ImprovementAgreementSummaries/201819.13.18.doc Chk# Billed/Paid to Date By Fee Paid Applicant 8/3/18 - Telcon wlconsultant re: soil testing at 109 Bewley Ln. to complete and return before SEO can make a determination additional bedroom adds 100 gallons per day (gpd), an inlaw but needs to know if she can because of the septic system. re: 117 Bewley; they are confused about the difference in suite and continuing to use the current septic system. An 8/20/18 - Telcon w/Josh Christman re: 113 Troxel Rd. Application and fees are due by the date of testing. MAIDENCREEKTOWNSHIP SEOACTIVITYREPORT suite must account for an additional 400 gpd. Applicant/Activity August 2018 the current septic system. called to cancel. App.# 18-0019-0300 SDE# T. Unger 2 copies Cc: nrnierte/maidenrraak/18.nn1a.n3nn/enantivit Chk # Billed/Paid to Date By Fee Paid Applicant 8/3/18 - Telcon w/consultant re: soil testing at 109 Bewley Ln. Send a septic system change of structure application for her to complete and return before SEO can make a determination 8/14/18 - Telcon w/Barbara Mable (buyer) re: 117 Bewley Dr. suite and continuing to use the current septic system. An Schedule a test date for August 21st but consultant later 8/20/18 - Telcon w/Josh Christman re: 113 Troxel Rd. Application and fees are due by the date of testing. MAIDENCREEK TOWNSHIP SEO ACTIVITY REPORT suite must account for an additional 400 gpd. Applicant/Activity August 2018 the current septic system. called to cancel. App. # 18-0019-0300 SDE# T. Unger 2 copies Cc: