MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS
September 13, 2018
ENGINEER'SAGENDA
Subdivision Review Status Checklist
Next Supervisors Meeting October11,2018
Berkshire Building Service expires 9/14/18; Time extension required if no
action on plan taken.
GsP Properties expires 9/13/18; Time extension required if no action on plan
taken.
Subdivision / Zoning / LDP
Plans currentlyinreview.
GSP Properties Final LDP - See SDE Itr. dated 6/5/18; Planning
Commission action Itr. dated 7/12/18 mtg.
Berkshire Building Services Final LDP -- See SDE Itr. dated 9/1/18;
Planning Commission action Itr.Dated 9/6/18.
Melrose Place
Paving completed, sidewalks & street trees installed.
Punchlist for entire development compiled; Contractor working to
completePunchlist items.
Street descriptions for dedication under review.
Projects
Stormwater Projects
O Ina/Rt. 73 - Lindbergh/Adele - on hold.
West Shore Drive
Meet with inspector for state regarding Bridge Inspection. Report.
Repairs are somewhat extensive; Twp. Involvement is possible
Three (3) 60" dia. Pipes required as alternative to existing
opening. Not desirable due to maintenance.
Twp. to make repairs as schedule permits.
Page 1 of 2
I:(Projects\MaidencreekTownship/18-0019-0100\Engineer's Agenda|9.13.18.docx

2018 Road Projects
Contract "A" road paving contract Awarded to H&K Group in the amount
of $199,825.14 (Includes both parking lot areas on Quarry Rd.)
Contract "B" cold-in-place recycling Evansville Rd. contract awarded to
H&K Group in the amount of $103,990.86.
Notice to Proceed issued 7/2/18 with start date of 7/25/18.
Time extension Change Order No. 1 sent to H&K for execution
Contract “B" cold-in-place recycling Evansville Rd. started 9/4/18.
Schaeffer Road Bridge
Continue to attended construction mtg.
Contractor/Engineer/PennDOTworking thru issues with pile
driving.
Time extension being coordinated.
Main St./Grove Rd. Intersection
Surveying for clear sight distances.
Sinkholes
Meadow Brook-Millennium Drive
Meadowbrook -Prescott Rd.
Both sinkhole stormwater pipe videoed; no issues evident
Township road crew to begin excavation & repair.
Subdivision Improvement LOC/Escrow Release
Sewage Enforcement Officer Activity Report
Page 2 of 2
I:\Projects\MaidencreekTownship/18-0019-0100\Engineer's Agenda\9.13.18.docx

Most Recent
Letter Date
3/6/2018
2/8/2018
9/1/2018
Review
7/6/2018
See SDE Itr. 3/6/18 and MTPC ltr.
1/3/18&2/8/18
See SDE Itr.Dated 9/1/18
See SDE Itr. Dated 7/6/18
Comments
P.C. Action ltr. 1/4/18
Dated 4/5/18
See SDE Itr.
Approved
04/12/18
BY BOS
02/08/18
MAIDENCREEK TOWNSHIP,BERKSCOUNTY
(may reflect more
than one extension)
Extension
06/05/18
09/14/18
09/13/18
SUBDIVISION STATUS
9/13/2018
Period Ends
03/06/18
03/06/18
06/05/18
90-Day
Review
07/31/18
Review Period
12/06/17
03/07/18
12/06/17
Begins
05/02/18
90-Day
Plan Stage
Final
Prel.
LDP
LDP
LDP
Final
Prel.
LDP
APPROVED/PENDING PLANS:
GSP Properties - Business Park
GSP Properties - Business Park
Berkshire Building Services
Berkshire Building Services
CURRENTPLANS:
Project Name
No.

MAIDENCREEKTWP.PLANNINGCOMMISSION
P.O.BOX319,BLANDON,PA19510
July 12, 2018
Maidencreek Township Board of Supervisors
POBox319
Blandon, PA 19510
Dear Board,
At their July 11, 2018 meeting, the Maidencreek Township Planning Commission
recommended by formal motion that the Board of Supervisors grant final plan approval to the
Business Park at Maidencreek Land Development Plan conditional upon compliance with the
comments in the July 6, 2018 and June 22, 2018 Systems Design Engineering, Inc. review letters
which are incorporated by reference.
If you have any questions, please call me at (610) 926-4920.
Sincerely,
Diane Hollenbach
Manager
MaidencreekTownship
CC:
Stackhouse Bensinger

SYSTEMS DESIGN
sdeite!
July 6, 2018
MaidencreekTownship Planning Commission
PO Box 319
Blandon PA19510
Re:
Business Park at Maidencreek Land Development Plan
Final PlanReview#3
Maidencreek Township
Berks County
Dear Planning Commission Members:
We are in receipt of a Final Plan entitled Business Park at Maidencreek prepared by Stackhouse
Bensinger Inc. (SBI) of Sinking Spring PA. The owner of the tract is GSP Properties-North
Bethlehem,LLC ofAllentown PA.
The site consists of 9.4 acres and is located in the "CR-Commercial Residential District". The
site is located along the south west side of Rt. 222, has 260 feet of frontage and is approximately
925 feet deep being rectangular in shape. A single access private drive/parking lot is being
proposed through the center of the tract terminating in a cul-de-sac. There are 22 - 1,479 square
foot office buildings being proposed in 11 duplexes with perpendicular parking provided fronting
the units.
The SBl plan submittal consists of 21 sheets as follows:
TITLE
PLAN NUMBER
Cover Sheet
DATE
REV.
C-1.1
Ex. Cond, Site Analysis
11-27-17
6-27-18
C-2.1
Demolition
11-27-17
6-27-18
C-3.1
Land Development
11-27-17
6-27-18
C-4.1
Grading and Utility
11-27-17
6-27-18
C-5.1
Landscaping
11-27-17
6-27-18
C-6.1
Lighting
11-27-17
6-27-18
C-6.2
Driveway, Storm, SanitaryProfiles
11-27-17
6-27-18
C-7.1
Storm Profiles
11-27-17
6-27-18
C-7.2
Site Construction Details
11-27-17
6-27-18
C-8.1
Site Construction Details
11-27-17
6-27-18
C-8.2
Site Construction Details
11-27-17
6-27-18
C-8.3
Site Construction Details
11-27-17
6-27-18
C-8.4
Pre-Construction Cond. Plan
11-27-17
6-27-18
C-PCC
PCSMandO&MPlan
11-27-17
6-12-18
C-PCSM1
PCSM and O&M PlanDetails
11-27-17
6-12-18
C-PCSM2
11-27-17
6-12-18
1032 James Drive, Leesport,PA19533P: 610.916.8500F: 610.916.8501

MaidencreekTownshipPlanningCommission
Re:
BusinessParkatMaidencreekLDp
FinalPlanReview#3
July 6.2018
Page 2
PCSM and O&M Plan Details
C-PCSM3
11-27-17
PCSM andO&M PlanDetails
6-12-18
C-PCSM4
11-27-17
Erosion&SedimentControlPlan
6-12-18
C-ESC1
3-09-18
E&SCPlan Details
6-12-18
C-ESC2
3-09-18
E&SC Plan Notes
6-12-18
C-ESC3
3-09-18
6-12-18
We have reviewed the above referenced plan and have the following comments for your
consideration:
Zoning: No Comments
SALDO:
1. Erosion and Sediment Control. Section 190-41. An erosion and sediment control plan
will need to be approved by the Berks County Conservation District prior to Final Plan
approval.
2. Improvement Specifications. Section 190-25.D(6)(b), Section 190-27 and Section
190-31. An Improvements agreement will be required prior to final plan approval by the
Township. Construction cost estimates are to be revised per the stormwater management
redesign and submitted for review. We are in receipt of the revised cost estimate and
they are presently under review.
3. Sanitary Sewer. Section 190-38. Maidencreek Township Authority approval for the
proposed sewerage system will be required prior to Final plan approval by the Township.
The Authority granted conditional approval based on the SDE review letter dated
June 22, 2018 (attached).
4. Water. Section 190-40. Maidencreek Township Authority approval will be required for
the proposed water system prior to Final Plan approval by the Township. See above.
5. Erosion and Sediment Control/NPDES Permit, Section 182-11. Evidence of approval
of the E&S and NPDES permit applications by Berks County Conservation District shall
be provided to the Township, prior to plan approval. A copy of the plan should be
provided to the Township

MiaidencreekTownshipPlanningCommission
Re:
Business Park at Maidencreek LDp
FinalPlan Review*3
July 6, 2018
Page 3
6. BMP Operations and Maintenance, Section 182-32. An O&M agreement is required
to be executed prior to plan approval. A sample agreement based on the stormwater
ordinance model has been submitted. Additional language will be necessary due to the
proposed stormwater system now relying on off-site conveyance facilities to function.
The Township solicitor is in receipt of a revised O&M Agreement to review.
7. Stormwater Easements, Section 182-33. Easement documentation for the new off-site
storm sewer conveyance must be provided. Easement and or O&M documentation must
indicate what entity(ies) are responsible for maintenance of the off-site facilities. The
applicant has submitted a signed Easement Agreement from Georgetown Village
Home Owners Association. The O&M Agreement is under review by the
Township's solicitor.
Additional Comments:
No additional comments.
Sincerely,
SYSTEMSDESIGNENGINEERING,INC
Ed Kopicki
Township Planning Consultant
Cc:
Maidencreek Township Supervisors
Diane Hollenbach, Twp. Manager
Eugene Orlando Jr., Twp Solicitor.
GSP Properties-North Bethlehem LLC
Stackhouse Bensinger Inc.
File 17-0024-0708

MAIDENCREEKTWP.PLANNINGCOMMISSION
P.O.BOX319,BLANDON,PA19510
September 6, 2018
MaidencreekTownshipBoardofSupervisors
PO Box 319
Blandon, PA 19510
At their September 5, 2018 meeting, the Maidencreek Township Planning Commission
recommended by formal motion that the Board of Supervisors grant conditional final plan
approval to the Berkshire Building Services Land Development Plan conditioned upon
satisfaction of the September 1, 2018 Systems Design Engineering, Inc. review letter, which is
incorporated byreference.
If you have any questions,please call meat (610) 926-4920.
Sincerely,
lerhac
Diane Hollenbach
Manager
MaidencreekTownship
cC:
Berks Surveying and Engineering Inc.

SYSTEMSDESIGN
A Pession for Ergirserir
ENGINEERING,INC
sdei.net
September 1, 2018
Maidencreek Township Planning Commission
PO Box 319
BlandonPA19510
Re:
Berkshire Building Services Development Plan
Final Plan - 2nd Review
Maidencreek Township
Berks County
Dear Planning Commission Members:
We are in receipt of a Final Plan entitled Berkshire Building Services (BBS) Overall Site Plan
prepared by Berks Surveying & Engineering, Inc. The present owner of the tract is Jeffrey and
Carol Baum of Fleetwood and the equitable owner is Berkshire Property Management Company,
LLC of reading.
The site consists of 5.29 acres and is located in the “I Industrial District". The site fronts the
Norfolk Southern Rail Road tracks to the north, the Norfolk Southern abandoned rail road
property to the south and is accessed from West Wessner Road to the west. The Final Plan
reflects a proposed warehouse with an office, a macadam driveway entrance and stone
driveway/parking lot area. The site is presently wooded however many trees have been removed
from the site to date.
The plan submittal consists of 8 sheets as follows:
TITLE
SHEETNUMBER
DATE
REV.
BBS Overall Site Plan
LD 101
11-22-17
07-18-18
BBS Layout Plan
LD 102
11-22-17
07-18-18
BBS Grading/Utility Plan
LD103
11-22-17
07-18-18
BBS Existing Site Plan
LD 104
11-22-17
07-18-18
BBS Detail Sheet
LD105
11-22-17
07-18-18
BBS Profile/Detail Sheet
LD 106
11-22-17
07-18-18
BBS Sewer/Water Detail Sheet
LD 107
12-20-17
07-18-18
BBS Lighting Plan
PH 101
02-09-18
Included with the Final Plan were the following Post-Construction Stormwater Management
(PCSM) Plan sheets:
TITLE
SHEETNUMBER
DATE
REV.
1032 James Drive, Leesport, PA19533.P:610.916.8500.F:610.916.8501
SchuyillHcven,PA=P:570.385.5549
Boyertown.PA P:610.369 131

Maidencreek Township Planning Commission
Re:
Berkshire Building Services LDP
Final Plan 2nd Review
September 1, 2018
Page 2
Overall Site Plan
PS 101
12-21-17
07-18-18
PCSM Plan
PS 102
12-21-17
07-18-18
Existing Site Plan
PS 103
12-21-17
07-18-18
PCSM Details
PS 104
12-21-17
07-18-18
Also included with the Final Plan were the following Erosion and Sediment Pollution Control
(E&SPC) Plan sheets:
TITLE
SHEETNUMBER
DATE
REV.
Overall SitePlan
ES 101
12-21-17
07-18-18
E&SPCPlan
ES 102
12-21-17
07-18-18
Existing Site Plan
ES 103
12-21-17
07-18-18
E&S Details
ES 104
12-21-17
07-18-18
Profile/Detail Sheet
ES 105
12-21-17
07-18-18
The following miscellaneous documents by Berks Surveying & Engineering, Inc. were included:
Plan Response Letter, dated 8-16-18
Authority Response Letter, dated 8-16-18
Improvements Cost Estimate, dated 8-16-18
Stormwater Report, dated 7-18-18
We have reviewed the above referenced documents and have the following comments for your
consideration:
Zoning:
No Comments.
SALDO:
1. Erosion and Sediment Control. Section 190-41. An erosion and sediment control plan
will need to be approved by the Berks County Conservation District prior to Final Plan
approval.
2. Improvement Specifications. Section 190-31. An Improvements agreement will be
required prior to final plan endorsement by the Planning Commission and the Township
Supervisors. Construction costs estimates have been submitted and are under review by
our office
SDE

Maidencreek Township Planning Commission
Re:
BerkshireBuilding ServicesLDP
Final Plan 2nd Review
September 1, 2018
Page 3
3. Financial Security. Improvements Guarantee. Section 190-27.B.4. The Final Plan
shall not be signed until the improvements guarantee has been executed. Construction
cost estimates have been submitted and are presently under review by our office.
4. Maintenance Guarantee. Section 190-27.E.(1). When Maintenance of stormwater
retention facilities is to be the responsibility of the individual lot owner, the Board shall
require that the maintenance responsibilities be set forth in perpetual covenants or deed
restrictions binding on the land owners' successors in interest, and may further require
that an initial maintenance fund be established in a reasonable manner.
5. MTA approvals: Our office has reviewed the proposed sewer connection and water
(service from a proposed on site well). All proposed connections appear favorable
however Final approval will be required by the Maidencreek Township Authority prior to
Final Plan approval by the Township Supervisors.
Stormwater:
1. General Requirements. Section 182-9.G. DEP has been involved in regulation of the
60-inch pipe culvert and associated watercourse. Evidence of approval and/or
authorization of the work by DEP shall be provided to the Township.
2. Erosion and Sediment Control Permitting. Section 182-11. Evidence of approval of
the E&S and NPDES/Construction permit shall be provided to the Township prior to
earthdisturbanceactivities.
3. Operations and Maintenance Agreement. Section 182-32. The property owner shall
sign an O&M agreement with the Township addressing the terms cited in this section,
prior to final plan approval. There is a sample agreement in the Stormwater Ordinance.
4. Stormwater Management Easements. Section 182-33.B. Stormwater easement(s)
shall be provided as specified in this section. Note 30 has been added to LD101,
providing a “blanket" easement for access and inspection. The Township Solicitor
should review this proposal for adequacy.
SDE

Maidencreek Township Planning Commission
Re:
Berkshire Building Services LDP
Final Plan 2nd Review
September 1, 2018
Page 4
Sincerely
SYSTEMS DESIGN ENGINEERING, INC.
Ed Kopicki
Township Planning Consultant
Cc:
Maidencreek Township Supervisors
Diane Hollenbach, Twp. Manager
Eugene Orlando Jr., Twp Solicitor.
Berks Surveying & Engineering
Berkshire Property Management Company, LLC
File17-0024-0707
SDE

LandisC.Deck&SonsSiteContractors
316NewSchaefferstownRoad
Bernville, Pa.19506
Date:
August 13th, 2018
Subject:
TimeExtensionRequest
To:
Diane Hollenbach--MaidencreekTownship
From:
LenHatter
We are writing this letter to notify you that we are respectfully requesting an extension of time
to complete your project. Throughout this year we have repeatedly lost time due to the extremely wet
continueinthefuture.
At this time we are requesting that the time be extended to the end of the official paving season
per Penn Dot. Please be advised that every attempt will be made to complete your project in the
timeliest manner possible as is permitted.
to this request.
If you have any questions, please feel free to contact me at 610-222-3615.
Thank you.
LenHatter
CC:NeilMease-GeneralSuperintendent
GaryDeck-Regional Superintendent
File

SYSTEMSDESIGN
Transmittal Letter
SDE
ENGINEERING,INC
Engineers·Surveyors·Planners·ConstructionManagers
1032JamesDrive·Leesport,PA·19533
Tel (610)916-8500·Fax(610)916-8501·sde@sdei.net
To:
Landis C.Deck & Sons
Date:
8-30-2018
File No.
18-0019-0115
316NewSchaefferstownRoad
Re:
MaidencreekTownship
Bernville,PA 19506
2018PavingProject
Contracts A and B
Change Order#1
Attn:
Len Hatter
WEARESENDINGYOU:
Attached
Via Separate Mail
Copy of Letter
Prints/Plans
Specifications
Change Order
As Noted
Other
Copies
Date
No.
Description
8-30-2018
ChangeOrder#1ContactAandContractB
THESEARETRANSMITTED:
For Approval
As Requested
Returned for Correction
Other
ForYourUse
Review/Comment
ForYour Information
Remarks
Len:
Please signall ofthe changeorder forms andall of themto me.
Thank you.
CC:
Project File
Signed
MaidencreekTwpATTN:DianeHollenbach(email)
Please notify us immediately if enclosures are not as noted.
Boyertown
Schuylkill Haven
610-369-1319
570-385-5549
I:(Projects\MaidencreekTownshipl18-0019-01152018Annual PavingProject/2018-08-30Trans-C.0.#1toH&KGroup.docx

EICDCE
ENGIP.EERSJOINTCOI,TAAC
DOCUMEAIS COMMITTEE
Change Order No.
Dateof Issuance:August30,2018
Effective Date:
August 24, 2018
Owner:
MaidencreekTownship
Owner's Contract No.:
Contracts Aand B
Contractor:H&KGroup,Inc.
Contractor's Project No.:
Engineer:
Systems Design Engineering, Inc.
Engineer'sProjectNo.:
18-0019-0115
Project:
2018 Paving Project
Contract Name:
TheContractis modifiedasfollowsuponexecutionofthis ChangeOrder:
Description:Extension of contract time. H&K Group, Inc.will not charge the Owner for any asphalt price
escalation past August 24, 2018.
Attachments:None
CHANGEIN CONTRACTPRICE
CHANGE INCONTRACT TIMES
[note changes in Milestones if applicable]
Original Contract Price:
Original Contract Times:
SubstantialCompletion:August 24,2018
ReadyforFinalPayment:_September23,2018
days or dates
[Increase] Qecrease]frompreviouslyapproyedChange
[lncrease] [Decrease] frompreviouslyapprovedChange
Orders No.
to No. :
to No.
OrdersNo.
N/A
Substantial Completion:
Ready for Final Payment:
days
Contract Price prior to this Chapge Order:
Contract Times prior to this Change Order:
Substantial Completion:August24,2018
ReadyforFinalPayment:September23,2018
days or dates
[Increase] [Decreaseof this Chang Order:
[Increase] [Decrecej of this Change Order:
Substantial Completion:
52 days
ReadyforFinal Payment:
38 days
days or dates
ContractPrice incorporating this Change Order:
Contract Timeswithallapproved Change Orders:
Substantial Completion:
October15,2018
ReadyforFinaiPayment:
October31,2018
days or dates
RECOMMENDED:
ACCEPTED:
ACCEPTED:
By:
By:
By:
Engikeer(if required)
Owner (Authorized Signature)
Contractor(Authorized Signature)
Title:
Title
Township Engineer
Township Manager
Title
Date:
8/30/18
Date
Date
ApprovedbyFundingAgency (ifapplicable)
By:
Date:
Title:
EJCDcC-941,ChangeOrder.
Prepared and published 2013bythe EngineersJoint Contract Documents Committee.
Page 1of 1

SUMMARY
IMPROVEMENTAGREEMENTSINVOICES
APPROVEDFORPAYMENT
MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS
SEPTEMBER13,2018
DATEOFINVOICE/PAYEE
INVOICE NO.
AMOUNT
1. Melrose Place
8/31/18 Maidencreek Twp. - Re: SDE, Inc.
93157
$2,329.98
AMOUNTDUE
$2,329.98
2. Mid Atlantic Energy Concepts
8/31/18 Maidencreek Twp. - Re: SDE, Inc.
93158
$118.36
AMOUNTDUE
$118.36
3. Schwab Inspection
8/31/18 Maidencreek Twp. - Re: SDE, Inc.
93159
$118.36
AMOUNTDUE
$118.36
TOTALAMOUNTDUE
$2.566.70
I:\Projects/MaidencreekTownship/ImprovementAgreementSummaries/201819.13.18.doc

Chk#
Billed/Paid
to Date By
Fee Paid
Applicant
8/3/18 - Telcon wlconsultant re: soil testing at 109 Bewley Ln.
to complete and return before SEO can make a determination
additional bedroom adds 100 gallons per day (gpd), an inlaw
but needs to know if she can because of the septic system.
re: 117 Bewley; they are confused about the difference in
suite and continuing to use the current septic system. An
8/20/18 - Telcon w/Josh Christman re: 113 Troxel Rd.
Application and fees are due by the date of testing.
MAIDENCREEKTOWNSHIP
SEOACTIVITYREPORT
suite must account for an additional 400 gpd.
Applicant/Activity
August 2018
the current septic system.
called to cancel.
App.#
18-0019-0300
SDE#
T. Unger 2 copies
Cc:

nrnierte/maidenrraak/18.nn1a.n3nn/enantivit
Chk #
Billed/Paid
to Date By
Fee Paid
Applicant
8/3/18 - Telcon w/consultant re: soil testing at 109 Bewley Ln.
Send a septic system change of structure application for her
to complete and return before SEO can make a determination
8/14/18 - Telcon w/Barbara Mable (buyer) re: 117 Bewley Dr.
suite and continuing to use the current septic system. An
Schedule a test date for August 21st but consultant later
8/20/18 - Telcon w/Josh Christman re: 113 Troxel Rd.
Application and fees are due by the date of testing.
MAIDENCREEK TOWNSHIP
SEO ACTIVITY REPORT
suite must account for an additional 400 gpd.
Applicant/Activity
August 2018
the current septic system.
called to cancel.
App. #
18-0019-0300
SDE#
T. Unger 2 copies
Cc: