Other Township Records
Road Crew Report — January 2019
- Date
- Date unknown
- Type
- Report
- Year
- 2019
- File
- PDF · 329 KB
Document text
Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 195 words
Road Crew Report January 2019 January 1-4 Collect Christmas trees. Drainage work on Villa Circle. Patch Hoch Road and Pleasant Hill Road shoulder. Paint lines at drains - plowing. Install delineators on E. Wesner Road. January 10 -11 Collect Christmas Trees. Continue drainage work on Villa Circle. Put spreader on Truck #4. Replace spinner motor on Truck #6. Salt roads (Jan. 8) Clean trucks. Repair drainage on E. Wesner Road. Crack seal. Clean up brush at Quarry Road property. January 13-19 Collect Christmas Trees. Salt, plow (Jan. 13, 18, 19). Maintenance on Truck #2. Continue to work on floor drains in garage. Install Hoch & Pleasant Hill Roads street index sign (again). Collect trash at parks. Dig electric trench for Well 6 & 7. Clear tree off Ridge Road. January 20-25 Salt, plow (Jan. 20, 22) Empty Trucks and wash and wax. Collect a few Christmas Trees. Continue to work on floor drains in garage. Ordered salt. Crack seal. January 28-31 Collect trash at parks. Crack seal Continue to work on floor drains in garage. Install rings around manholes and water boxes to prevent hitting when plowing. Salt, push drifts back (Jan. 29, 30, 31)