CULTURA LAW
LLC
April 22, 2019
Via Email
Eugene Orlando, Jr., Esquire
Orlando Law Offices, P.C.
2901 St. Lawrence Avenue, Suite 202
Reading, PA 19606
Re:
Tree Tops Subdivision Common Space Trust
Dear Gene:
I am writing (again) concerning the Drainage Basin in the Tree Tops Subdivision. It has
been a year since I appeared at the Township Supervisors Meetings in April and May
2018. As you may recall, at the May meeting, the Supervisors told me that the Town-
ship was unwilling to become involved in the Tree Tops Drainage Basin situation.
Since last May, however, Mr. Fielding and I arranged a meeting of the Homeowners of
the Tree Tops Subdivision. It was held in December 2018. At that meeting, several
questions arose. I have attached a list of those Questions.
I am asking you to discuss these Questions with the Supervisors, perhaps at your next
meeting on May 9th.
Representatives from the Homeowners (as well as Mr. Fielding and I) will attend the
Supervisors June 13th meeting to hear the Supervisors' reply.
Regards,
Jarkes R. Fegley
John A. Fielding, II, Esq., Trustee
Tree Tops Subdivision Homeowners
Email:Culturalaw@gmail.com
Reading Office:
Allentown Office:
Tel: 610-375-4380
501 Washington St, Suite 402
612 W. Hamilton St. Suite 202B
Fax: 484-866-8668
Reading, Pa 19601
Allentown, Pa 18101

LIST OF QUESTIONS
From
HOMEOWNERSOFTREE TOPS SUBDIVISION
1.
Would Maidencreek Township agree to take over the maintenance
responsibilities of the Tree Tops Drainage Basin?
Please Note - all the following questions arise if the answer to Question 1 is "no."
2.
Does Maidencreek Township still have any monies in escrow from the original
development of Tree Tops? Please know that homeowners in Tree Tops have
heard that there is $33,000 still in escrow.
3.
Was any amount of public money used when the Drainage Basin was put on the
Tax Sale list and when it was eventually deeded to the current Trustee? If so,
how much?
4.
Would Maidencreek Township be willing to turn over any remaining escrow
funds to the Trust for continued maintenance of the Drainage Basin?
5.
If the answer to Question #4 is "no," would Maidencreek Township be willing to
pay for whatever is needed to get the Drainage Basin "up to code?"
6.
Does Maidencreek Township have the legal responsibility to maintain
stormwater runoff in Tree Tops? Did Maidencreek Township meet all DER's
requirements as it pertains to this subdivision?
7.
How many drainage basins does Maidencreek Township maintain itself?
8.
How many drainage basins are still privately maintained?

CULTURA LAW
To:
Maidencreek Township Supervisors
Date:
06.04.19
Subject:
Answer to Board Question about Unpaid Dues from Homeowners
Clients:
Tree Tops Subdivision Common Space Trust
By letter to me dated May 29, 2019, your Board Secretary transmitted all of your
answers to the Questions that I had posed in my earlier correspondence. Thank you.
There was one Question that the Board had asked of me in that correspondence and I
wanted to provide the Board with a reply in advance of the meeting on June 13th.
There are 122 Lots in the subdivision known as Tree Tops. As you may recall, the
subdivision proceeded in 3 Phases.
As of May 30, 2019, there is $37,493.00 in outstanding Accounts Receivable now (or
past) due from 77 homeowners.
I would like to address the further Question of how to go about collection of those
Accounts Receivable with the Board at the meeting on June 13th.
I want to answer this additional Question, and I will do so at that meeting, but I will
add that there is a definition in the Trust Agreement created by the original
developer, Glenn Sandritter, that has created quite a mess. That definition is (and I
quote):
"Lot - Any real estate located within the boundaries of Tree Tops or in
any other Phase of Tree Tops, or any extension thereof, specifically made
subject to the terms hereof by an instrument accepted by the Trustee and
recorded in the office of the Recorder of Deeds in and for Berks County,
Pennsylvania, (emphasis added) and owned in single and separate ownership
(including, without being limited to, any and all forms of joint ownership)
together with any improvements located thereon."
Regards,

PHONE:610-926-4920
FAX:610-926-6314
MAIDENCREEKTOWNSHIP
BOARDOFSUPERVISORS
www.maidencreek.net
May 29, 2019
James R. Fegley
501 Washington St, Suite 402
Reading, PA 19601
Dear Mr. Fegley,
I wanted to provide you with answers to the questions you mailed to Gene in advance of
our June 13th meeting.
1. Would Maidencreek Township agree to take over the maintenance responsibilities of the
Tree Tops Drainage Basin? Board Question -- Have all property owners paid their
annual dues?
2. Does Maidencreek Township still have any monies in escrow from the original
development of TreeTops? The Township has $29,298.29 in escrow at Fleetwood
Bank.
3. Was any amount of public money used when the Drainage Basin was put on the Tax Sale
list and when it was eventually deeded to the current Trustee? If so, how much?
S49,181.14 was used from the TreeTops escrow to finish the TreeTops Phase II
punch list and re-establish the Trust. Spreadsheet attached.
4. Would Maidencreek Township be willing to turn over any remaining escrow funds to the
Trust for the continued maintenance of the drainage basin? The Board needs a legal
opinion for what the escrow can be used.
5. If the answer is no, would Maidencreek Township be willing to pay for whatever is
needed to get the basin up to code? The basin was inspected 10/17/2012. Email report
attached. The basin does function as designed.
6. Does Maidencreek Township have the legal responsibility to maintain stormwater runoff
in TreeTops? Did Maidencreek Township meet all DER's requirements as it pertains to
this subdivision? The plan met storm water standards when it was recorded.
Drainage on private property was inspected when installed. The Township is
responsible for MS4 activity where road drainage enters into waters of the
Commonwealth. We are not aware of drainage problems along the roads.
7.How many drainage basins does Maidencreek Township maintain itself? One basin in
Shadow Ridge. The basin was installed many years after the subdivision was
recorded to correct a runoff problem created by the Villages at Maidencreek.
Forino Grande converted a building lot into the basin at his expense on the
condition the Township take dedication.

8. How many drainage basins are still privately maintained? Ten basins are privately
maintained either by a HOA or the property owner who owns it.
a.
Treetops -- 1 (HOA)
b.
Meadowbrook-- 2
c.
MelrosePlace--2(HOA)
d.
ShadowRidge--1of2
VillageatMaidencreek-1 (HOA)
f.
Thon (Lindbergh Avenue)- 1
g.
Glen Mar -- 1
h.
Boyer Place -- 1
If you have any other questions prior to the meeting, please email me and I will try to help you.
Best Regards,
Drmeeach
Diane Hollenbach
Manager
Maidencreek Township
Cc: Eugene Orlando

TreeTopsImprovements Escrow
Updated11/19/2013
Expenses
Explanation
2/15/2001
77,990.00
12/31/2003
76,884.38
12/31/2004
77,754.83
12/31/2005
79,303.11
12/31/2006
80,584.70
Billspaid before2007werefor Engineering inspections
12/31/2007
82,211.24
Expenses priorto this if required, will need to bebroughtfrom offsite
12/31/2008
83,870.63
12/31/2009
85,085.69
12/31/2010
85,897.26
78,005.99
12/31/2011
$ 8,010.00 Transferred Interest to General Fund December 2011
12/31/2012
33,825.17
12/31/2013
33,261.60
Date
Interest
1/31/2012
46.25
2/29/2012
43.29
3/31/2012
40.90
4/30/2012
15.74
5/31/2012
13.98
6/30/2012
13.28
7/31/2012
12.71
8/31/2012
9.49
9/30/2012
7.44
10/31/2012
7.67
11/30/2012
6.41
12/31/2012
4.61
1/31/2013
4.31
2/28/2013
3.89
3/31/2013
4.28
4/30/2013
4.10
5/31/2013
4.23
6/30/2013
4.10
7/31/2013
4.24
8/31/2013
4.24
9/30/2013
4.10
10/31/2013
2.73
11/30/2013
1.50
12/31/2013
Total
263.49Interesttobededucted1/6/2014

TreeTopsImprovementsEscrow
Updated11/19/2013
Expense
Date
Detail
9/19/2011
(313.50)
Reestablishment ofTrust
10/13/2011
(132.00)
Reestablishment ofTrust
(198.00)
11/15/2011
Reestablishment ofTrust
11/15/2011
(913.16)Asbuilt work
12/12/2011
(265.50)
Reestablishment of Trust
1/20/2012
(332.00)
Reestablishment of Trust
(214.50)
2/10/2012
Reestablishment of Trust
2/10/2012
(4,968.64) Asbuilt and survey work
3/12/2012
(167.00) Reestablishment of Trust
3/15/2012
(10.00) Check Printing
3/20/2012
(5,579.00) Waterand Sewer Tapping Fee Lot 138
4/12/2012
(17,000.00)InstallationWater&SewerLot138
4/12/2012
(150.00)InspectionofinstallationLot138
4/13/2012
(82.50) Reestablishment of Trust
5/11/2012
(313.50)ReestablishmentofTrust
5/22/2012
(1,250.00)
Balance to finish Lot 138
5/25/2012
(195.00)
ReestablishmentofTrust
6/14/2012
(528.00)
Reestablishmentof Trust
7/12/2012
(181.50)
Reestablishment of Trust
8/9/2012
(247.50)
ReestablishmentofTrust
9/13/2012
(127.00)F
Reestablishment of Trust
11/8/2012
(33.00)
ReestablishmentofTrust
11/9/2012
(6,491.91) Survey and Monument Placement
12/13/2013
(264.00)
ReestablishmentofTrust
12/13/2013
(4,445.38)Asbuilts
3/14/2013
(605.29) Asbuilts
S(45,007.88)TOTALSPENTTOFINISHPHASEIIIMPROVEMENTS
$ (2,951.00) Cost to reestablish the trust and trustee for maintenance of
the detention basin perplan note
updatec 12131/15
($ 3272.69)
Survey t AsbuiHs
d Asbuilts
9/aa/14 (#900-57)
$ 49,181.14

TreetopsDetentionBasin
http://mail.aol.com/38252-111/aol-6/en-us/mail/PrintMessage.aspx
From:MarkKitzmiller<m.kitzmiller@sdei.net>
To:Thomas Unger<t.unger@sdei.net>; Diane Hollenbach <maidentwp@aol.com>
Subject:TreetopsDetentionBasin
Date:Wed,Oct17,20124:18pm
Tom &Diane:
Evaluated the Treetops detention basin 10/17/12, looking for problem areas, defects, etc.
In all, the basin is in good condition. All components (inlets, outlets, spillway) appear to be in place and per plan. Pipe
outfalls are not significantly eroded. There is minor animal burrowing (probably groundhogs) activity, but no structural
issues are apparent.
There is only one (1) item that appears to warrant monitoring, but not immediate repair:
a slump or possible sinkhole adjacent to the high side of the outlet structure riser box (pictured below). This looks
more like slumping than a sinkhole, however, and it looks old. Doesn't appear to warrant a repair, but should be
monitored. It's in the area over the outlet pipe; the outlet pipe is about 7 -- 8 feet below ground in the picture and flow is
freely making its way to the receiving catch basin in Hill Road (so a pipe collapse is not likely to have caused the slump).
More below...
1 of4
1/3/201410:28AM

TreetopsDetentionBasin
http://mail.aol.com/38252-111/aol-6/en-us/mail/PrintMessage.aspx
hill road
pond
slumpor
bottom
sinkhole
2of4
1/3/201410:28AM

Treetops Detention Basin
http://mail.aol.com/38252-111/aol-6/en-us/mail/PrintMessage.aspx
Following is a list of general observations - there are no repair or maintenance items in this list:
If the basin is viewed as having 4 sides, 2 long and 2 short, the 2 long sides and 1 short side all appear to have a 3:1
slope.The other short side along Sycamore has a more gradual slope, maybe 4 or5 to 1.
There are 2 influent pipes - one from Sycamore (36" +/- and 18" +-). The outlets of both pipes are stable and show no
significant erosion. There is evidence that the 36" carries a lot of flow - there is grit/anti-skid material washed all the way
to the outlet and a large sediment “delta" has formed near the pipe outlet. Neither requires maintenance at this time.
There are wetland plants growing in the basin bottom -- nothing irregular. The entire basin is vegetated and no
significanterosionis evident.
There is a 12" concrete pipe that drains the basin at the bottom. This pipe connects to a 2x4 catch basin box riser.
The riser is about 13 feet deep; and about 5.5 feet is exposed above ground, along the side slope. The 12" pipe is the
only outlet that drains the basin, other than the top of the riser box, which is 13 feet above the 12" pipe. All structures are
clean and flowing with a trickle of water, probably springs.
2x4 box is 13.75 feet from grate to floor; about 13.5 feet to the invert of the 12" coming in. Outlet appears to be a 36"
HDPE, cut on a skew such that the opening takes up the entire 4' interior wall at the base of the box.
The emergency spillway is defined and appears to drop about a foot along the berm at Hill Road. The outer berm is
mowed.
The pond outlet pipe connects to a catch basin along Hill Road. It is flowing at about the same amount coming in from
the 12" inside the basin.
There were no verifiable high water marks in the basin - there was some staining on the inflow pipe wingwall from
Sycamore Rd. -- if it's accurate, it would seem that only about 2-3 feet of water ponds in the basin. There were some
pilesof sticks thatcouldindicatehigherwater, but notreliablemarks.
Mark A.Kitzmiller
SystemsDesignEngineering,Inc
1032JamesDriveLeesport,PA19533
T:610.916.8500-F:610.916.8501·www.sdei.net
3 of4
1/3/201410:28AM