Other Township Records
Road Crew Report — May 2019
- Date
- Date unknown
- Type
- Report
- Year
- 2019
- File
- PDF · 325 KB
Document text
Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 177 words
Road Crew Report May 2019 May 1-3 Work on small mower Pull trees out of creek Mow grass Cut trees from Rt. 73 to Cornerstone park Trim parks Dismantle No Parking signs Collect trash May 6-10 Macadam drains at Tree Tops Collect trash Mow grass Complete MS4 sheets MovetreeonEvansvilleRoad Fix shingles on Bay #5 Remove lightpolebyfuel pumps Remove concrete in Bay #2 Dig for catch basin & drain Order materials for slabs Move tables at Community Park Mulched at Tree Tops, Cornerstone and Blandon Meadows Pkwy DevelopplanforBlandonball fieldwall Pick up #4 at Masano Worked on rebar in Bay #2 May 13-17 Empty trash Work on chipper Loadbleachersthatweresold Remove concrete light base & pipe Mow grass Work on Bay #2 Pour concreteforlight base Crossing guard May 20-24 Collect trash Mow grass Work on Faith court with SealMaster Resurfaced Faith playlot MulchedatFaithcourt Set drain in Bay #2 Saw cut drains in Tree Tops May 27-31 Mow grass Trench new electric line Cut asphalt at shop Posted No Fishing signs at Schaeffer Rd. bridge Dig out drains in Tree Tops