MAIDENCREEKTWP.PLANNINGCOMMISSION
P.O.BOX319,BLANDON,PA19510
June 6, 2019
Maidencreek Township Board of Supervisors
PO Box 319
Blandon, PA 19510
At their June 5, 2019 meeting, the Maidencreek Township Planning Commission
recommended by formal motion the 5G and Small Cell Facilities Ordinance Revision.
If you have any questions, please call me at (610) 926-4920.
Sincerely,
Katelyn Gruber
Recording Secretary
Maidencreek Township Planning Commission
cc:
Systems Design Engineering, Inc.

ORLANDOLAWOFFICES
A Professional Corporation
Fax:(610)370-1527
2901 St.Lawrence Avenue, Suite 202
300 E. Philadelphia Avenue
www.orlandolawoffices.com
Reading, PA 19606
Boyertown, PA 19512
(610) 367-7443
(610)779-3830
September 27, 2019
Cheryl Auchenbach, Community Planner III
Berks County Planning Commission
633 Court St., 14th Floor
Reading, PA 19601
Re:
Maidencreek Township
Dear Cheryl:
Enclosed please find a proposed Amendment to the Maidencreek Township Code of
Ordinances. Please provide your review and comments. The Board intends to consider this
Amendment for adoption at an expected hearing date of November 14, 2019.
We look forward to hearing from you. Thank you very much.
Very trply yours,
Eugene Drjandd, Jr.
EO/tmw
Enc.
cc: Diane Hollenbach, Township Manager

County of Berks
Planning Commission
NDEN
Phone:610.478.6300
BerksCountyServicesCenter
Fax:610.478.6316
633 Court Street, 14th Floor
Email:planning@countyofberks.com
Reading, PA 19601-4309
Barry L.Schlouch, ChairmanIThomas C.McKeon,AICP, CEcD, Vice-ChairmanI Jodi L.Gauker, Secretary
J.Chadwick Schnee, Esq.,First Asst.County Solicitor
ECEVE
October23,2019
OCT282019
Maidencreek Township Supervisors
1 Quarry Road, P.O. Box 319
Blandon,PA19510
Re:Act247Review,ZoningOrdinance
Amendment
Dear Supervisors:
Inaccordancewiththeprovisions ofthePennsylvania Municipalities Planning Code,theBerks
wireless communication facility regulations and has no comment.
do not hesitate to contact me at 610-478-6300, Ext 6311. Section 609 (g) of the Pennsylvania
MunicipalitiesPlanningCoderequiresthatacopyof theadoptedamendmentbeforwardedtoour
office within thirty days of enactment.
Yours Truly,
Cheryl Auchenbach, Planner Ill
BERKSCOUNTYPLANNINGCOMMISSION
cc:MaidencreekTownshipPlanningCommission
MaidencreekTownshipSolicitor
Maidencreek Township Engineer
www.countyofberks.com/planning

ORDINANCE NO.
AN ORDINANCE OF THE TOWNSHIP OF MAIDENCREEK,
BERKS COUNTY, PENNSYLVANIA, AMENDING THE
CODE OF ORDINANCES (ORDINANCE NO. 223) OF THE
TOWNSHIP,BY SUPPLEMENTING AND/OR REPLACING
EXISTING WIRELESS COMMUNICATION FACILITY
REGULATIONS
AND
ADDING
APPLICABLE
DEFINITIONS
WHEREAS, on March 11, 2010, the Board of Supervisors of the Township of Maidencreek,
Berks County, PA adopted Ordinance 223 codifying the Township's Ordinances (the Code); and
WHEREAS, on September 26, 2018, the Federal Communications Commission adopted a
Declaratory Ruling and Third Report and Order (the September 26, 2018 Ruling) interpreting the
Telecommunications Act of 1996 with regard to regulations for wireless service providers, including
5G services; and
WHEREAS, the Maidencreek Township Planning Commission has recommended
substantive changes to Chapter 220 (Zoning) of the Code in furtherance of compliance with the
September 26, 2018 Ruling and protection of the health, safety and welfare of residents and visitors
of the Township of Maidencreek.
NOW THEREFORE, The Board of Supervisors of the Township of Maidencreek, Berks
County, PA (the Township) in lawful session duly convened hereby ENACTS AND ORDAINS the
following amendments to the Code as follows:
Section 1. Amendment of Part II: General Legislation, Chapter 220 (Zoning), Article II -
Terminology, Section 220-11 (Definitions) by Adding the following Defined Terms.
The following definitions are hereby added, in alphabetical order, to Article II - Terminology,
Section 220-11 (Definitions) of Chapter 220 of the Code, as follows:
COLLOCATED SMALL CELL INSTALLATION - means a single telecommunication
pole, mast,
tower, cable, wire or other structure supporting multiple antennas, dishes,
transmitters, repeaters, or
similar device owned or used by more than one public or
private entity.
EXEMPTED TELECOMMUNICATIONS FACILITIES - includes, but not limited to the
following:
A single ground or building mounted receive-only radio or television antenna
including any mast, for the sale use of the tenant occupying the residential
parcel on which the radio or television antenna is located, with an antenna
height not exceeding twenty-five (25) feet.
A ground or building mounted citizens band radio antenna, including any
mast, if the height (post and antenna) does not exceed thirty-five (35) feet.

A ground, building or tower mounted antenna operated by a federally
licensed amateur radio operator as part of the Amateur Radio Service, if the
height (post and antenna) does not exceed thirty-five (35) feet.
A ground or building mounted receive-only radio or television satellite dish
antenna which does not exceed thirty-six (36) inches in diameter, for the sole
use of the resident occupying a residential parcel on which the satellite dish
is located, provided the height of said dish does not exceed the height of the
ridgeline of the primary structure on said parcel.
Mobile services providing public information coverage of news events of a
temporary nature.
Hand-held devices such as cell phones, business-band mobile radios, walkie-
talkies, cordless telephones, garage door openers and similar personal use
devices.
Government-owned and operated receive and/or transmit telemetry station
antennas for supervisory control and data acquisition (SCADA) systems for
water, flood alert, traffic control devices and signals, storm water, pump
stations and/or irrigation systems, with heights not exceeding thirty-five (35)
feet.
Township-owned and operated antennae used for emergency response
services, public utilities, operations and maintenance if the height does not
exceed seventy (70) feet.
Telecommunication facilities, including multiple antennas located on an
industrial parcel and utilized for the sole use and purpose of communications
between employees/vehicles of said company in the course of business.
MAJOR TELECOMMUNICATIONS FACILITY - means telecommunication towers,
poles or similar structures greater than fifty (50) feet in height, including accessory
equipment such as transmitters, repeat microwave dishes, horns, and other types of
equipment for the transmission or receipt of such signals, as well as support structures,
equipment buildings and parking areas.
SMALL CELL INSTALLATION - means all equipment required for the operation and
maintenance of so-called “small cell"' wireless communication facilities (WCF's) that
transmit and/or receive signals but are not “major Communication Facilities" including
antennas, microwave dishes, power supplies, transformers, electronics, and other types of
equipment required for the transmission or receipt of such signals.

Section 2. Amendment of Part II: General Legislation, Chapter 220 (Zoning), Article XVI
(Supplementary Regulations), Section 220-81 (Wireless Communication Facilities) by
Adding the following Sections.
The following sections are hereby added to Article XVI - Supplementary Regulations of Chapter
220 of the Code, Section 220-81 (Wireless Communication Facilities), as follows:
220-81 (B - Use Regulations) (2 - Uses Permitted by Conditional Use) (c -- New Communication
Towers Outside Public Rights-of-Way) (23 - Removal)
Replacement - when future technology avails itself with radiation suppressant devices and/or
less harmful equipment to humans, such equipment shall replace dated equipment as soon as
possible.
220-81 (C - Permit Processing Time Frames) (2 - For a Tower-Based WCF) (e)
If additional information was requested by the Township or any required zoning
approval (conditional use or height variance) to complete the application, the time
required by the WCF Applicant to provide the information or secure the required
zoning approvals shall not be counted toward the 150-day review period.
Section 3. Amendment of Part II: General Legislation, Chapter 220 (Zoning), Article XVI
(Supplementary Regulations), Section 220-81 (Wireless Communications Facilities) by
Deleting Existing Sections 220-81(B)(2)(d)(6)(h), 220-81(B)(2)(e), 220-81(C)(1) and
220-81(C)(2) and Replacing Those Sections.
The existing provisions of Sections 220-81(B)(2)(d)(6)(h), 220-81(B)(2)(e), 220-81(C)(1),
and 220-81(C)(2) of the Code are Deleted and Replaced with the following provisions, as follows:
220-81 (B - Use Regulations) (2 - Uses Permitted by Conditional Use) (d - New Communication
Pole/Tower Inside Public Rights-of-Way) (6(h))
As part of the application for a new pole/tower based WCF within the public right-of-way,
the applicant shall document compliance with the requirements of Section 220-81.B(2) (d)
[1-6] above. In addition, the application should include:
Submission of a zoning permit.
Submission of a detailed site and engineering plans for each proposed WCF
installation including all associated equipment necessary for operation.
Photographs of proposed WCF antenna and equipment.
Visual impact analysis with photo simulations.
If any associated ground or underground equipment is proposed to be located
outside of the public right-of-way, a copy of an Easement Agreement from the
property owner on who's property the facilities are to be located shall be
provided.
220-81 (B -- Use Regulations) (2 - Uses Permitted by Conditional Use) (e - New Non-Tower
WCF Inside Public Rights-of-Way)

New Non-Tower WCF's located within the public right-of-way shall be collocated on
existing poles, such as utility poles or light poles. If collocation is not technologically
feasible, the WCF Applicant shall locate its non-tower WCF's on existing poles or
freestanding structures that do not already act as wireless support structures with the approval
of the Township and PennDOT.
Should none of the above location options be feasible and a new pole is proposed by the
applicant, the proposed pole shall be 35 feet in height or less, or 110% of the height of poles
in the surrounding streetscape, whichever is higher. In addition, any of the new WCF's
covered under this subsection shall be compliant with the following:
1)
WCF installations located above the surface grade in the public right-of way
including, but not limited to, those on streetlights and joint utility poles, shall
consist of equipment components that are not more than six (6) feet in
height and that are compatible in scale and proportion to the structures upon
which they are mounted. All equipment shall be the smallest and least visibly
intrusive equipment feasible.
2)
Antenna and related equipment shall be treated to match the supporting
structure and may be required to be painted, or otherwise coated, to be visually
compatible with the support structure upon which they are mounted.
3)
The Township and PennDOT shall determine the time, place and manner of
construction, maintenance, repair and/or removal of all Tower-Based WCF's
in the public right-of-way based on public safety, traffic management, physical
burden on the right-of-way, and related considerations. For public utilities,
the time, place and manner requirements shall be consistent with the police
powers of the Township and the requirements of the Public Utility Code.
4)
Non-Tower WCF's and related equipment shall be located as not to cause any
physical or visual obstruction to pedestrian or vehicular traffic, or to otherwise
create safety hazards to pedestrians and/or motorists or to otherwise
inconvenience public use of the right-of-way as determined by the Township
and PennDOT. In addition:
a)
In no case shall ground-mounted related equipment, walls, or
landscaping be located within eighteen (18) inches of the face
of curb, within two (2) feet of the edge or cartway if no curb,
or within an easement extending onto a privately owned lot.
b)
For sites in residential developments where utilities are
underground, ground level cabinets are prohibited.
Underground cabinets are required to be used. Ground level
cabinets are permitted in all non-residential zones provided that
such ground level cabinet is less than 28 cubic feet in volume,
is finished and/or painted so as to blend in with its background
and does not inhibit any existing sight triangles.

c)
If an electrical meter cabinet is located outside of the public
right-of-way, either underground or above ground, the
applicant will need to secure an Easement Agreement from the
property owner of the property upon which the equipment is to
be located. Above ground level cabinets shall be screened to
blend in with the surrounding area to the satisfaction of the
Township and PennDOT.
d)
Any graffiti on the non-tower WCF or on any related
equipment shall be removed at the sole expense of the WCF
owner.
Minimum spacing between small cell WCF's shall be 300 feet
between WCF installations. Small cell WCF's shall not be
located within a distance equal to or less than the front yard
setback distance of an adjoining existing residence.
Relocation or removal of facilities. Within sixty (60) days
following written notice from the Township, or such longer
period as the Township determines is reasonably necessary or
such shorter period in the case of an emergency, an owner of a
Non-Tower WCF in the right-of-way shall, at its own expense,
temporarily or permanently remove, relocate, change or alter
the position of any Non-Tower WCF when the Township,
consistent with its police powers and applicable Public Utility
Commission regulations and PennDOT, shall have determined
that such removal, relocation, change or alteration is
reasonably necessary under the following circumstances:
i)
The construction, repair, maintenance or installation of
any Township or other public improvement in the right-
of-way.
i)
The operations of the Township or other governmental
entity in the right-of-way.
ii)
Vacation of a street or road or the release of a utility
easement.
iv)
An emergency as determined by the Township
g)
As part of the application for a new non-tower WCF within the
public right-of-way, the applicant shall document compliance
with the requirements of Section 220-81.B(2) e [1-6] above. In
addition, the application should include:
Submission of a zoning permit.

Submission of a detailed site and engineering
plans for each proposed WCF installation
including all associated equipment necessary
for operation.
Photographs of proposed WCF antenna and
equipment.
Visual impact analysis with photo simulations.
If any associated ground or underground
equipment is proposed to be located outside of
the public right-of-way, a copy of an Easement
Agreement from the property owner on whose
property the facilities are to be located shall be
provided.
220-81 (C - Permit Processing Time Frames) (1 - For a Non-Tower WCF)
(c)
60 Days - For collocation of small WCF's (non-tower based WCF's) on an existing
wireless support structure to which they are to be attached which does not
substantially change the physical dimensions of the wireless support structure, the
Township within 60 days of receipt of a complete application, shall make its
decision on whether to approve the application.
(d)
9o Days - For collocation of a small WCF on an existing non-tower based WCF that
does substantially change the physical dimensions of the wireless support structure
to which they are attached as defined by the WBCA, or for the construction of a new
small WCF on an existing pole (utility pole, street light, etc.) or a new pole of
less than fifty (50) feet in height, to be used as a wireless support structure to which
the WCF's are to be attached, the Township within 90 days after receipt of a
complete application shall make its decision whether to approve the application
220-81 (C - Permit Processing Time Frames) (2 - For a Tower-Based WCF)
(c)
90 Days - For collocation of a new small wireless facility (WCF) on an existing
wireless support pole or tower structure in excess of fifty (50) feet in height, the
Township upon receipt of a complete application shall render its decision in the
application within 90 days.
(d)
15o Days - For construction of a new pole or tower based WCF on a wireless
support structure in excess of fifty (50) feet in height, the Township shall act upon
the application within 150 days of receipt of a complete application.
Section 4. Severability.
The provisions of this Article shall be severable, and if any of its provisions shall be held to
be unconstitutional, illegal, such decision shall not affect the validity of any remaining provisions of
this Article. It is hereby declared that it is the legislative intent that this Article would have been
adopted had the unconstitutional or illegal provisions not been included.

Section 5.Repealer
All ordinances or parts of ordinances inconsistent with the provisions of the Ordinance are
hereby repealed.
Section 6. Effective Date.
This Ordinance shall be effective five (5) days after enactment.
ORDAINED and ENACTED as an Ordinance by the Board of Supervisors of Maidencreek
Township, County of Berks, Pennsylvania, in lawful session duly assembled, this
day of
, 2019.
MAIDENCREEKTOWNSHIP
BOARDOFSUPERVISORS
By:
Claude Beaver, Chairman
Heidi Fiedler, Vice-Chair
Joseph E. Rudderow, III, Supervisor
Attest:
ach
Diane Hollenbach, Secretary