Board of Supervisors
Agenda — January 8, 2020
- Date
- January 8, 2020
- Type
- Agenda
- Year
- 2020
- File
- PDF · 6.8 MB
Document text
Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 2,926 words
MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS SEPTEMBER10,2020 ENGINEER'SAGENDA Subdivision Review Status Checklist Next Supervisors Meeting October 8,2020 All plans are current. Subdivision / Zoning / LDP JoJazSubdivisionPrel./FinalseeSDEreviewItr.Dated8/4/20. Redner'sQuickshop&CarWashPrel.Plan seeSDEItr.Dated9/2/20. DavidKopferSketchPlanforRecordseeSDEItr.Dated6/3/20. Gun Range regulations draft reviewedw/P.C.on 1/8/20 revisions/additions being made. Burning Ordinance regulation draft reviewed by P.C. on 9/2/2020 additional revisions/additions being made. Projects StreetProjects2020 ExcelsiorDrive&JuneAve.BOSawarded: Contract"A"to Recon Construction in the amount of $206,038.00; work completed 8/20/20. Contract"B"to New Enterprise Stone & Lime Co.in the amount of $135,317.50; work is scheduled to begin Sept. 21 (night). LutzProperty E.WesnerRd.stormwaterissue Reviewed Walnut Manor&Golden Manor Subdivision Plans(Plans start in 1987).There is no storm water easement onplans.No notes for storm water system maintenance on plans. Inspected site w/Keith S. Established that headwall is at 2o'6" from centerline & Twp. r/w is 26'6". Storm Damage-Follow up from Aug.BoS mtg. Melrose Met w/developer, developer Eng. & Atty. Reviewed repairs to be made & other options for mitigation. Repairs underway in Basin. Met w/PennDOTrepresentatives PennDOT to contact railroad & initiate mtg. Page 1of 2 I:\Projects/MaidencreekTownship/20-0019-0100/Engineer'sAgendal9.10.20.docx Inspected GuildinRd. Clogged storm water pipes @ Park Rd. Clogged storm waterpipe@ R.R. Crossing Investigate swale&pipe from Park Rd.toVilla Circle StormWaterBasins Putting together plans & Storm Water agreements for each basin so inspections can be conducted. SubdivisionImprovementLOC/EscrowRelease SeeAttached SewageEnforcementOfficerActivityReport SeeAttached Page 2 of 2 I:/Projects/MaidencreekTownship/20-0019-0100)Engineer'sAgendal9.10.20.docx Most Recent Letter Date 5/1/2020 8/5/2020 9/2/2020 Review 6/3/2020 Approval conditioned on SDE Comments No action taken by PC, No action taken by PC, No action taken by PC, resubmission needed resubmissionneeded resubmission needed reviewletter Approved BY BOS 05/14/20 MAIDENCREEKTOWNSHIP,BERKSCOUNTY (may reflect more than one extension) Extension granted Extension granted until 11/30/2020 Extension granted until 12/1/2020 until12/1/2020 Extension SUBDIVISION STATUS 9/2/2020 I:/ProjectsMaidencreek Township PCISubdivision StatusiSubdivision Status Checklistsl9.2.2020 Period Ends 07/16/20 09/01/20 09/01/20 90-Day Review 09/01/20 Review Period 04/17/20 06/03/20 06/03/20 90-Day Begins 06/03/20 Plan Stage Prelm/Final Prelm/Final Sketch Plan Prelm Plan for Record Plan Plan APPROVED /PENDINGPLANS: Redner's Quickshop and Car Wash David Kopfer Subdivision CURRENT PLANS: Schick Dental Office Jojaz Subdivision Project Name No. SYSTEMSDESIGN "A Passion for Engineering Excellence" SDE ENGINEERING,INC sdei.net September2,2020 DianeHollenbach,TownshipManager MaidencreekTownship 1 Quarry Road Blandon,PA19510 Re: Redner's Quickshop and Car Wash PreliminaryPlanReview#3 Ms. Hollenbach: Systems Design Engineering, Inc. is in receipt of a Preliminary Plan entitled "Redner's Quickshop and Car Wash." The site has three (3) access points; two on Allentown Pike (US Route 0222) and another on Lake Shore Drive (PA Route 0073). The proposal would resuit in gas pumps, a convenience store, and car wash. The Plan was prepared by Bogia Engineering, Inc. The submission consisted of response letters to SDE's August letter, a Stormwater Management report (including supplemental computations) and the following: Cover Sheet Sheet 1 of 11 Dated5/20/2020,Rev8/19/2020 Existing Conditions Plan Sheet 2 of 11 Dated 5/20/2020, Rev 8/17/2020 Grading and Utility Plan Sheet 3 of 11 Dated 5/20/2020, Rev 8/19/2020 Details Plan Sheet4of11 Dated 5/20/2020, Rev 8/19/2020 Details Sheet 5of11 Dated 5/20/2020, Rev 8/19/2020 Landscaping Plan Sheet 6 of 11 Dated 5/20/2020, Rev 8/19/2020 Lighting Plan Sheet 7of 11 Dated 5/20/2020, Rev 8/19/2020 E&SPlan Sheet 8 of 11 Dated5/20/2020,Rev8/19/2020 E&SPlanDetails Sheet 9of 11 Dated5/20/2020,Rev8/19/2020 Drainage Area Sheet 10 of 11 Dated 5/20/2020,Rev8/19/2020 Truck Turn Sheet 11of 11 Dated5/20/2020,Rev8/19/2020 BACKGROUND: The purpose of the plan is to establish a gas station, car wash and convenience store on parcels zoned C-1 Local Commercial. The subject site consists of three (3) neighboring parcels that total 1.75 acres in size. The site is to be served with public water and sewer. The site previously included a gas station and Top Star convenience store. The current proposal would utilize the I:\Projects(Maidencreek TownshipPC/20-0024-0717Redner's QuickshopandCarWash/Redner's Prel PianRev#3.docx 1032 James Drive, Leesport, PA 19533.P: 610.916.8500. F: 610.916.8501 SchuylkillHaven,PAP:570.385.5549 Boyertown,PA.P:610.369.1319 MaidencreekTownshipPlanning Commission September2,2020 Re: Redner's Quickshopand Carwash Page 2of9 PreliminaryPlanReview#3 existing building, while gas pumps would be moved to the southwest side of the site and a car wash would be constructed. The existing driveway onto Rt. 222 will be removed and a new driveway constructed tothe south. The applicant is also in the process of seeking zoning relief from the Maidencreek Township Zoning Hearing Board. REVIEW: This letter presents comments on the third review of the submitted Preliminary Plan. ZONING: The subject site is iocated in the C-1 Local Commercial Zoning District. 1. The first review did not interpret the proposed car wash as an accessory use. The car wash is interpreted as a use permitted by Special Exception. 8/4/2020. 2.Per$220-62, Sign Regulations A previous sign at the corner of Allentown Pike and Lake Shore Drive was removed. However, new sign details are not provided. oThe Applicant should put sign details on the plan and demonstrate compliancewithSection$220-62. 1. Addressed. The applicant stated that sign regulations would be in compliance. Details for traffic signage was provided. Details for business signage is not provided. a. The applicant stated via Note 15 that all signage would comply with the appropriate Township Ordinanceand further stated that a signage packet would be submitted outside the land development submission. A separate zoning permit will be required. SDE Maidencreek Township Planning Commission September2,2020 Re: Redner'sQuickshopandCarwash Page3of9 PreliminaryPlanReview#3 3. Special Exceptions Section $220-65 states special exception requirements for car washes: Car washes are permitted only in an enclosed building that must be at least 1oo feet from residential districts and right-of-way intersections. Additionally, sufficient space must be provided for at least ten (1o) stacked vehicle spaces. Addressed. A special exception to allow the car wash use was approved on 8/4/2020. A variance was granted on 8/4/2020 to allow six (6) stacking spaces, rather than ten (10). LIGHTINGSTANDARDS: 1.Per$186-48, LightingPlanSubmission Lighting plans are required in the Preliminary Plan stage of all development plan reviews. Thefollowing are comments on theupdated Lighting Plan by SDE's electrical designer: The Type 'A' fixture in the Luminaire Schedule' is not a 'cut-off' type as defined by I.E.S. and therefore does not comply with Section g186-46oftheTownshipZoningOrdinance. The Type 'B' fixture spec sheet is not included on the drawing. Please clarify if both Type'A'and'B'wall packs are used on the building simultaneously or if one type used for after-hours security only. SALDO: 1.Per$190-15,PreliminaryPlanRequirements Per Subsection C, the plan shall be sealed by the professional responsibie for the plan. Partially Addressed. The applicant stated that the plans will be sealed by a Professional Engineer at the time of Final plan approval. SDE MaidencreekTownshipPlanningCommission September 2, 2020 Re: Redner's Quickshopand Carwash Page 4 of 9 PreliminaryPlanReview#3 2.Per$190-34Sidewalks Sidewalks may be required for commercial developments by the Board of Supervisors. O Addressed. Note 16 states that the lot owner will be responsible for sidewalk construction if deemed necessary bythe Township Supervisors. 3. Per $190-44, Landscaping The selected species--Prunus serrulate (Kwanzan Cherry)and Juniperus Chinesis (Seagreen Juniper) - are not included on the Townships recommended list. SDE's landscape architect stated that the chosen species are acceptable. However, the location of existing vegetation should also be provided prior to Final Pian approval. STORMWATER MANAGEMENT: 1.Per §182-11, Erosion and Sediment Control -The Erosion &Sediment Control Plan should be submitted to the Berks County Conservation District for review and approval. A copy of the approval letter should be submitted to the Township priorto Final Plan approval. 2. Per §182-16.A.(2), Stormwater Management Districts -The computations indicate that the post-development runoff to Point of Interest 2 (POl-2) does not meet the reduced runoff rates required by the ordinance. It is unclear at this time whether the proposed detention basin will adequately reduce the runoff rates to POl-3 because of revisions to both the pre-development runoff and post-development runoff computations noted in comments under Miscellaneous Stormwater Management Plan and Computations Comments. 3. Per S182-17.D.(3), Design Criteria for Stormwater Management and Conveyance BMPs Notes describing the required pipe specifications for"sLCPp" should be provided on the plans, including material and watertight joints. 4. Per $182-22.B.(22) and $182-22.E.(2)(d), Drainage Plan Contents -- The Certificate of Landowner should be revised to include the requirements of both of these sections. 5.PerS182-23,PlanSubmission-AcopyofthePennDOTHOPplans shouldbesubmittedto theTownship concurrently with the submission to PennDOT to allow coordination with the SALDO review. A copy of the HOP drawings should be submitted to the Township SDE MaidencreekTownshipPlanningCommission September2, 2020 Re: Redner's Quickshopand Carwash Page5of9 PreliminaryPlanReview#3 when theapplication is submittedtoPennDOTtoallow coordinationwith the SALDO review.Aiso see Comment 3undertheGrading&Utility Plan comments. 6.Per S182-24.F--The proposed storm sewer connections to the proposed inlet located in the SR 0222 right-of-way, as well as the driveway modifications, will require a PennDOT Highway Occupancy Permit. A copy of the approved HOP(s) should be submitted to the TownshippriortoFinalPlanapproval. 7. Per §182-30, Performance Guarantee -- A financial guarantee should be provided for the proposed stormwater management controls prior to Final Plan approval. 8. Per $182-32 and $182-34, Operations and Maintenance Agreement for Privately Owned Stormwater Controls and BMPs-The Stormwater Management Controls and Best Management Practices Operations and Maintenance Agreement in Appendix A of the Stormwater Management Ordinance shouid be submitted for review and approval by the Township priorto Final Planapproval. MISCELLANEOUS STORMWATER MANAGEMENT PLAN AND COMPUTATIONS COMMENTS: 1. The post-development runoff CN for lawn areas in all the Disturbed drainage areas should be 65 instead of 58, per Table B-2. This CN may also be used for the Undisturbed and Offsite lawn areas for pre- and post-development conditions. 2. The existing conditions impervious area used in the computations is significantly higher than the previous submission and the area measured off the Existing Conditions Plan. The total existing impervious area should be approximately 0.40 acres instead of 0.67 acres. 3. The allowable post-development site runoff to POl-3 for the 2-yr storm should be computed by adding the peak 1-yr disturbed DA-C area flow and the peak 2-yr undisturbed DA-C and Offsite Bypass-2 flows (since the Tc is the same for all the drainage areas). The flows must be added manually because the computer model cannot add hydrographs from different storm frequencies. The allowable flows for all other storm events should be computed in the same way. 4. The detention basin outlet pipe length and slope used for the basin stage/discharge computations should be revised to match the storm sewer computations. 5. The emergency spillway invert (343.30) shouid be set above the adjacent Rt. 222 curb elevation (approximately 343.55 through 343.65 at the current location). Based on the grate elevation noted for the proposed inlet at POl 3, the top of curb elevation is 343.34. SDE MaidencreekTownshipPlanningCommission September2,2020 Re: Redner'sQuickshopandCarwash Page 6of9 PreliminaryPlanReview#3 6. The swale design computations should be based on a design flow that matches the 25-yr flow to Es-1-1 from the storm sewer computations. In addition, the computations are based on a 7' bottom width, but the grading plan reflects a 2' bottom width. COMMENTS ON THE GRADING & UTILITY PLAN: 1. At a minimum, the starting invert elevations for Downspout Ds-1 and Ds-6 should be noted to provide the contractor with sufficient information to construct the rainwater conductor system. 2. The outfall of DS-6 should be moved lower into the basin assuming the invert will be approximately342.50. 3. in order to provide the drainage area boundary shown for Bypass-2, the 344 contour must be revised to reflect a berm at the boundary location, and bottom of curb/paving spot elevations should be provide at the two curb radi to ensure runoff does not run down the driveway to Rt. 222. The 344.20 spot elevation must be raised if runoff is to flow toward theother344.20intheflowline. The HOP driveway profile must agree with the grading revisions noted above. 4. The proposed 345 contour should be provided to define the Swale #1 grading. In addition, it appears that the proposed grading at the upper end of the swale will require grading on the adjacent property. The proposed 348 and 350 contours should be shown. 5. The proposed 346.50 spot elevation at the northeast corner of the fueling area canopy is almost 2' lower than the existing paving grade at this location. Additional proposed grading should be shown to tie this elevation back into the existing driveway grades. Also, this elevation appears to be too low with respect to the trash enclosure elevation and the existing curb immediately to the east of the fueling area. The existing bottom of curb elevation appears to be at least 15" higher than the proposed spot elevation. 6. Additional proposed contours and spot elevations should be provided upslope of Inlet I-2- 1. This area must be regraded to ensure all runoff from drainage area Bypass-2 is directed into inlet I-2-1, as assumed by the drainage area boundary. In addition, this inlet should be located in a sag in order to prevent bypass flow from reaching POl-3. if the design allows for bypass flows, these flows must be accounted for in the total post-development runoff to POl-3. MaidencreekTownshipPlanningCommission September2,2020 Re: Redner'sQuickshopandCarwash Page7of9 PreliminaryPlanReview#3 7. Some of the proposed storm sewer system along the new Rt. 222 curb line is now noted as 18" CMP; however, it is our understanding that this system is RCP. The designer should verifythe correct pipe material. 8. The proposed p-1 invert in the Rt. 222 inlet should be noted. COMMENTS ON THE STORM SEWER AND RAINWATER CONDUCTOR DESIGN: 1. The longitudinal slope and cross-slope values used for I-2-1 are not verifiable from the grading plan. The computations indicate that a significant portion of the flow to the inlet is not captured (approx. 50%) and will drain to POl-3. As noted previously, this bypass flow increases the post-development flow to POl-3. 2. Computations for the rainwater conductor system should be provided. The plan notes 3" diameter pipes for DS-1 through DS-4; however, at 1% slope, a 3" pipe only has capacity forlessthan 1,100SFof roofarea. MISCELLANEOUSDRAFTINGCOMMENTS: 1. The Vegetated Swale detail should reflect the parameters used in the swale design computations,includingthetotal depth and bottom width. 2. A detail is provided for a check dam in the swalie; however, the location is not shown on theplan and thepurpose of the check dam is unclear. 3. The Top of Clay Liner elevation shouid be noted on the Detention Basin Cross-Section. The clay core should be removed if it is not being provided due to instailing the clay liner. 4.The outlet elevation, BOE, in the Detention Basin Cross-Section should be revised. 5. The Typical Emergency Spillway detail should note the erosion control blanket material. In addition, the elevations noted for the crest and top of berm should be revised. 6. The height of the trash rack shouid be revised on the Orifice Plate detail to conform to the dimensions of the outlet structure orifices and bottom of the top unit. 7. The TG, upper 3" orifice and outlet pipe elevation/inverts should be revised on the Basin 1 Outlet Structure detail. 8.The OS-1-1 TG elevation noted on the Grading & Utility Plan should be revised. SDE MaidencreekTownshipPlanningCommission September2,2020 Re: Redner'sQuickshopandCarwash Page8of9 PreliminaryPlanReview#3 9. It appears that the plan shows 33 proposed parking spaces. Whereas, it is stated on sheet 1 that there are 35 proposed spaces. Clarification should be provided or the plan should be amended to reflect the correct number of provided spaces. MISCELLANEOUS: 1. MTA approval is required. The plans should be submitted to the Maidencreek Township Authority and an approved review letter should be provided to the Township upon receipt. Partially addressed. The plan was submitted to MTA. Receipt of approval by the MTA should be submitted to the Township office and to SDE. 2. An approved PennDOT Highway Occupancy Permit should be provided for access points alongAllentownPike Outstanding. An approved HOp has not been provided. The applicant stated that it will be provided once received. 3. Curb Radii The applicant should explain or amend the 2-foot curb exit radius at the northeastern access point to Us Route 0222. The 2-foot curb radii have been amended to 5 feet. These will need to be reviewed and approved by PennDOT as part of the HOP approval. 1. Partially addressed. The applicant stated that an approved HOp will be provided once received. SDE MaidencreekTownshipPlanningCommission September2,2020 Re: Redner'sQuickshopandCarwash Page 9of 9 PreliminaryPlanReview#3 If you should have any questions or comments, please do not hesitate to contact our office. Sincerely, SYSTEMSDESIGNENGINEERING,INC. PhilipJ.Ashear Township Planning Consultant Cc: MaidencreekTownshipPlanningCommissioners DianeHollenbach/TownshipManager Nicole Plank, Esq. Bogia Engineering, Inc. SDE SUMMARY IMPROVEMENTAGREEMENTSINVOICES APPROVEDFORPAYMENT MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS SEPTEMBER4,2020 DATE OFINVOICE/PAYEE INVOICE NO AMOUNT 1.Melrose Place Insp. 101673 $1,068.99 8/31/20 Maidencreek Twp. -- Re: SDE, Inc. AMOUNTDUE $1,068.99 2. ( GsP Properties,LLC 8/31.20 Maidencreek Twp. -- Re: SDE, Inc. 101674 $503.06 AMOUNTDUE $503.06 TOTALAMOUNTDUE $1.572.05 I:\Projects\Maidencreek Township/mprovement Agreement Summaries/202019.4.20.doc MAIDENCREEKTOWNSHIP SEOACTIVITYREPORT July,2020 Fee Paid to Date By SDE # ADD.# Applicant/Activity Applicant Billed/Paid Chk # 281BlandonRoad 7/19/19-Replacementsepticsystemapplication.Testingwas performed byprevious SEO. Verifytest site.Send idemntification form to applicant. Septic system permit cannot be issued until the 19-0019-0479 Z176966 notarized indemnification is received by SEO. 9/4/19 -Process application and verification of prior testing for new septic system. Review design/issue permit No update 724.00 Paid 1002 65 Troxel Rd. 19-0019-0480 Z203635 10/7/19-Reviewdesign/issuepermit for newsystem No update 585.00 Paid 122 1142PleasantHill Road-Ownerwantstosubdivideanother lotoff of the farm. 2/17/20-Schedule testingandnotifyPADEP. 3/5/20 -Probes for primary and replacement system on new lot and replacement area for existing lot. 20-0019-0481 3/6/20 - Conduct percolation testing for primary and replacement Subdivision system on newlot. 3/31/20-Completesoilreports,sendtoconsultant 6/2/20-Rec incomplete planningmodule.Sendletterto consultant. 6/9/20-Communicationsw/PhilAshearandPADEPre:nitrate easementrequirements. $1,608.00 Paid 114 107oMaidencreek Road-Thepropertydidn'tpass thereal estate inspection. Replacement septic system testing is necessary. 20-0019-0482 Z215216 3/17/20-Conduct soil probes.Dig/presoak perc holes. 3/18/20-Performpercolationtest. No update 692.00 Paid 872ParkRd-Replacementsystem 5/13/20-Processapplication 20-0019-0485 5/14/20-Observeprobes Z210426 5/15/20 -Perform percolation test 5/18/20 Soil report and send to deigner 6/11/20 -Review design. Fees due before permit can be issued. 570.00 Paid 50873 185OrchardRoad-Replacementsystem 5/20/20Probestesting 5/21/20PercTest 5/21/20soil&perc reportwriteup 20-0019-0486 Z207852 5/25/20scanned soil &perc reportand email todesigner 7/24/20 -Review design/issue permit to install system. 7/28/20-ScarificationinspectionPASSED 1264& 8/4/20-Pressure test inspection PASSED $1,245.00 Paid 1269 20-0019-0300 Misc Admin General Work Cc:T.Unger 2 copies SEO Desk projects/maidencreek/20-0019-0300/seoactivity