MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS
March 12, 2020
ENGINEER'SAGENDA
Subdivision Review Status Checklist
Next Supervisors Meeting April 9, 2020
Subdivision/ Zoning /LDP
Planscurrentlyin review.
Sketch Plan Jojaz Subdivision see SDE Itr.Dated March 4, 2020.
SketchPlan Schick Dental see SDE Itr.Dated March 4,2020.
Gun Range regulations draft reviewed w/P.C. on 1/8/20 revisions/additions
being made.
Melrose Place
Original punchlist items completed; maintenance issues remain to be
completed.
Projects
Stormwater Projects
Ina/Rt.73-Lindbergh/Adele-onhold.
WestShoreDrive
Repairs are somewhatextensive; Twp.Involvement ispossible
Three (3) 60"dia. Pipes required as alternative to existing
opening. Not desirableduetomaintenance.
Twp.to make repairsasschedulepermits.
Street Projects 2020
ExcelsiorDrive-preparingbid document
June Avenue-preparing bid document
Investigating storm water remediation to be completed by Twp. Road
crew.
Handicap Parking Location
401 Main Street
SubdivisionImprovementLOC/EscrowRelease
See Attached
Sewage Enforcement Officer Activity Report
Page 1of 1
I:/Projects\Maidencreek Township/20-0019-0100/Engineer's Agendal3.12.20.docx

SYSTEMSDESIGN
SDE
"A Passion for Engineering Excellence"
ENGINEERING,INC
sdei.net
March 4,2020
Maidencreek TownshipManager
1 Quarry Road
Blandon,PA19510
Re:
Jojaz Subdivision
Sketch PlanReview
Ms. Hollenbach:
Systems Design Engineering,Inc. is in receipt of a Sketch Plan entitled"Jojaz Subdivision."The
site has two (2) access points to Maiden Creek Road and the subdivision would result in six (6)
individual lots.The Plan was prepared by The Crossroads Group, LLC.The submission consisted
of the following:
Sketch Plan
Dated 1/3/2020, revised 2/18/2020
Background:
The purpose of the plan is to subdivide an existing tract that is zoned Industrial. The tract is
currently 24.57 acres in size and would be divided into six (6) parcels, all of which would be less
than five (5) acres in size. Lots are to be served by private individual wells and individual on-site
sewage disposal.
REVIEW:
This letter presents comments on thefirst review of the submitted Sketch Plan.
ZONING:
The property is located in the I - Industrial Zoning District. The uses of the proposed parcels are
pre-existing.Anyproposed changes in usearenot specified.
Commentsonotherissuesarepresentedbelow.
1.Per$220-48,PermittedUses
1032JamesDrive,Leesport,PA19533.P:610.916.8500F:610.916.8501
Schuylkill Haven,PA.P:570.385.5549
Boyertown,PA.P:610.369.1319

MaidencreekTownshipPlanningCommission
March4,2020
Re:
JojazSubdivision
Page 2 of 3
SketchPlanReview
The applicant should list the intended and existing uses on the proposed parcels.
In as much as intended uses are not known at this time, each individual lot will be
required to submit a land development plan addressing lot use, zoning, and
subdivision and land development ordinance compliance.
2.Per$220-49,AreaandBulk Regulations
Theproposed lotstobecreated appeartobe compliantwith area and bulk
requirements. Zoning data provided is generic for the (l) Industrial Zoning District.
PerArticleXVl, SupplementalRegulations
oFuture individuallotLandDevelopment Plans will berequired to
demonstrate compliance.
SALDO:
1.Per$190-14,SketchPlanRequirements
Sufficient information is provided on the plan to address Sketch Plan
requirements.
Supplementary information will berequired with a subsequent Preliminary and
Final plan submission.
o These include but are not limited to: Erosion and Sediment Control,
Landscaping Plan, Lighting Plan, and all requirements in the subsections of
Section s190, Required Improvements and Specifications.
StormwaterManagement:
1. Stormwater management is not part of the Sketch Plan Review. Existing details of
stormwater management should be provided with any subsequent Preliminary or Final
Plan submission.
SDE

MaidencreekTownshipPlanning Commission
March4,2020
Re:
JojazSubdivision
Page 3of3
SketchPlanReview
Miscellaneous
1. Traffic
Trucks are prohibited on Evansville Road. Trucks will be required to use Maiden
Creek Road to Route 73 and to Pleasant Hill Road. Appropriate PennDOT HOp's
required.
2. On-lot sewage is proposed.
A public sewer system should be investigated to determine feasibility toinclude
Molltown area and Maiden Creek Road users.
3. The internal Road system (not to be dedicated) must be constructed in accordance with
Township standards including but not limited to: horizontal curve radius and percent
slopes.
4. Maindencreek Township currently maintains a Township resident recycle drop-off
location on the northwest corner of the property along Maiden Creek Road.
If you should have any questions or comments,please do not hesitate to contact our office.
Sincerely,
SYSTEMSDESIGN ENGINEERING,INC.
PhilipJ.Ashear
Township Planning Consultant
Cc:
Maidencreek Township Planning Commissioners
DianeHollenbach/TownshipManager
EugeneOrlando,Jr./TownshipSolicitor
TheCrossroadsGroup
SDE

SYSTEMSDESIGN
SDE
"A Passion for Engineering Excellence"
ENGINEERING,INC
sdei.net
March 4, 2020
MaidencreekTownship Manager
1 Quarry Road
Blandon,PA19510
Re:
Schick Dental Office
SketchPlanReview
Ms. Hollenbach:
Systems Design Engineering, Inc. is in receipt of a Sketch Plan entitled "Schick Dental Office." The
address is 1o Ingot Drive and is located with three-sided frontage on Ingot Drive, Golden Drive,
and Park Road in Maidencreek Township. The Plan was prepared by Berks Surveying &
Engineering. The submission consisted of the following:
Sketch Plan
LD101
Dated 2/18/2020
Background:
The purpose of the plan is to develop a 1.06 acre property with a dental office and parking area.
The property is currently undeveloped. The property will be served by public sewer and water.
REVIEW:
This letter presents comments on thefirst review of the submitted Sketch Plan.
ZONING:
The property is located in the C-1 Local Commercial Zoning District. The intended dental office
appears to be a permitted use in the C-1 zoning district under the category "Business,
professional, orgovernmentoffices."
Comments on otherissuesarepresentedbelow.
1.Per $220-42, Area and Bulk Requirements
Area and Bulk Requirements appear to be met. However, the applicant should add
the square footage of the proposed building and the exact proposed building
height to the Zoning Compliance Table.
1032 James Drive, Leesport, PA 19533.P: 610.916.8500 .F: 610.916.8501
SchuylkillHaven,PA.P:570.385.5549
Boyertown, PA.P: 610.369.1319

MuhlenbergTownshipPlanning Commission
March 4,2020
Re:
SchickDentalOffice
Page 2 of 3
SketchPlanReview
SALDQ:
1.Per$190-14,SketchPlanRequirements
Sufficientinformationisprovided ontheplantoaddress SketchPlan
requirements.
Supplementary information will be required with a subsequent Preliminary and
Finalplan submission.
o These include: Erosion and Sediment Control, Landscaping Plan, Lighting
Plan,andall requirements in the subsections of Section s190, Required
ImprovementsandSpecifications.
2. Driveway
Recommendmovingdrivewayapproximatelyten(1o)feeteast sothatvehiclesdo
not drive over existing inlet.
StormwaterManagement:
1.Stormwater management is not part of the Sketch Plan Review.However, the applicant is
requesting a Waiverto Section 182-20 Drainage Plan.
The WaiverLetter states that thisproperty ispart ofthe Golden Manor Subdivision
and that regional stormwater facilities were designed to accommodate the overall
subdivision.
SDE

MuhlenbergTownshipPlanningCommission
March 4,2020
Re:
SchickDentaloffice
Page 3 of 3
SketchPlanReview
If you should have any questions or comments, please do not hesitate to contact our office.
Sincerely,
SYSTEMSDESIGNENGINEERING,INC.
PhilipJ.Ashear
Township Planning Consultant
Cc:
MaidencreekTownshipPlanningCommissioners
Diane Hollenbach/Township Manager
EugeneOrlando,Jr./TownshipSolicitor
Berks Surveying&Engineering,Inc/Applicant's Surveyor/Engineer
SDE

SUMMARY
IMPROVEMENTAGREEMENTSINVOICES
APPROVEDFORPAYMENT
MAIDENCREEKTOWNSHPBOARDOFSUPERVISORS
MARCH12,2020
DATEOFINVOICE/PAYEE
INVOICENO.
AMOUNT
1. GSP Properties, LLC
2/29/20Maidencreek Twp.--Re: SDE, Inc.
99577
$223.35
AMOUNTDUE
$223.35
TOTALAMOUNTDUE
$223.35
I:/Projects/Maidencreek TownshiplImprovement Agreement Summaries/202013.12.20.doc

Chk #
1002
122
114
Billed/Paid
Paid
Paid
Fee Paid to
724.00
585.00
Applicant
Date By
$1,608.00
9/4/19 - Process application and verification of prior testing for new
performed by previous SEO. Verify test site. Send idemntification
Telcon w/Tom Hoch re: 1070 Maidencreek Road replacement
10/7/19 - Review design/issue permit for new system
MAIDENCREEK TOWNSHIP
2/17/20 - Schedule testing and notify PADEP.
SEO ACTIVITY REPORT
notarized indemnification is received by SEO.
Send application package
Applicant/Activity
February 2020
package and send to PADEP
281 Blandon Road
off of the farm.
sytem testing.
Misc Admin-
65 Troxel Rd.
No update
No update
Reimbursement
General Work
Subdivision
Z176966
Z203635
App. #
2019
19-0019-0479
19-0019-0480
20-0019-0607
20-0019-0300
20-0019-0302
T. Unger 2 copies
SDE#
SEODesk
Cc:

DESCCO
DESIGN&CONSTRUCTION,INC.
March 4, 2020
Planning Commission
1 Quarry Road
Blandon, PA 19510
Re:
Monica Schick DND-10 Ingot Drive
Dear Commissioners:
To help us expedite this project we are requesting permission to submit a Preliminary/
Final Land development plan and application instead of separate Preliminary and Final
submissions. We understand that we do have to still adhere to all applicable sections of
Maidencreek Township's SALDO.
Kind Regards,
DESCCO Design & Construction, Inc.
Nicholas D. Stoltzfus, PE
President
610-944-04041WillowStreetIndustrial ParkFleetwoodPA19522+www.descco.com

Archived from the Maidencreek Township website. Reproduced unaltered; not an official records repository.