MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS
June 11,2020
ENGINEER'SAGENDA
SubdivisionReviewStatusChecklist
NextSupervisorsMeetingJuly9,2020
Subdivision/Zoning/LDP
JoJazSubdivisionPrel./FinalseeSDEreviewItr.Dated6/3/20.
Redner'sQuickshop&CarWashPrel.Plan seeSDEItr.Dated6/3/20.
DavidKopferSketchPlanforRecord seeSDEItr.Dated6/3/20.
Gun Range regulations draft reviewed w/P.C.on1/8/20 revisions/additions
being made.
MelrosePlace
Original punchlist items completed; maintenance issues remain to be
completed.
Projects
Stormwater Projects
Ina/Rt.73--Lindbergh/Adeleonhold.
West Shore Drive
Meet with inspector for state regarding Bridge Inspection. Report.
Repairs are somewhat extensive; Twp. Involvement is possible
Three (3) 60" dia. Pipes required as alternative to existing
opening. Not desirable due to maintenance.
Twp.tomake repairs as schedulepermits.
Street Projects2020
ExcelsiorDrive&JuneAve.BOSawarded:
Contract"A"to Recon Construction in the amount of
$206,038.00.
Contract“B"to New Enterprise Stone & Lime Co.in the amount
of $135,317.50
Storm water remediation reviewed with Twp.; Road crew to perform.
BoS to approve signing Contracts & Notice to Proceed.
SubdivisionImprovementLOC/EscrowRelease
See Attached
Sewage Enforcement Officer Activity Report
SeeAttached
Page 1of 1
I:\Projects\MaidencreekTownship\20-0019-0100\Engineer'sAgenda\6.11.20.docx

Most Recent
Letter Date
5/1/2020
Review
6/3/2020
Approval conditioned on SDE
Comments
No action taken by PC,
No action taken by PC,
No action taken by PC,
resubmissionneeded
resubmissionneeded
resubmission needed
reviewletter
Approved
BY BOS
05/14/20
MAIDENCREEKTOWNSHIP,BERKSCOUNTY
(may reflect more
than one extension)
Extension
SUBDIVISION STATUS
6/5/2020
Period Ends
07/16/20
09/01/20
09/01/20
90-Day
Review
09/01/20
Review Period
04/17/20
06/03/20
06/03/20
Begins
90-Day
06/03/20
Plan Stage
Prelm/Final
Prelm/Final
Prelm Plan
Sketch Plan
for Record
Plan
Plan
PENDING PLANS:
Redner's Quickshop and Car Wash
David Kopfer Subdivision
T PLANS:
Schick Dental Office
Jojaz Subdivision
Project Name
APPROVED
CURRENT
No.

SYSTEMSDESIGN
"a Passion for Engineering Excellence"
SDE
ENGINEERING,INC
sdei.net
June 3,2020
DianeHollenbach,TownshipManager
Maidencreek Township
1 Quarry Road
Blandon,PA19510
Re:
JojazSubdivision
Preliminary/FinalPlan-Review#1
Ms. Hollenbach:
Systems Design Engineering, Inc. is in receipt of a Preliminary/Final Plan entitled "Jojaz
Subdivision." The site has two (2) access points to Maiden Creek Road and the subdivision would
result in four (4) new individual lots. The southern access point is to be a local single access
street and the northern access is via a proposed easement. The Plan was prepared by The
Crossroads Group, LLC. The submission consisted of the following:
Cover Sheet
Undated
Subdivision Plan
Sheet 1 of 5
Dated5/6/2020
ExistingFeaturesPlan
Sheet 2 of 5
Dated5/6/2020
RoadPlan&Profile
Sheet3of5
Dated 5/6/2020
E&SControlPlan
Sheet 4 of 5
Dated5/6/2020
Construction Details
Sheet5of5
Dated5/6/2020
BACKGROUND:
The purpose of the plan is to subdivide an existing tract that is zoned Industrial. The tract is
currently 24.57 acres in size. Four (4) new lots would be created, two (2) existing parcels
adjacent to the proposed lots would remain unchanged and would have various easements in
common. Lots are to be served by private individual wells and individual on-site sewage disposal.
REVIEW:
This letter presents comments on the first review of the submitted Preliminary/Final Plan.
I:/Projects\MaidencreekTownshipPC20-0024-0715JojazSubdivision/Prelim-FinalPlan/Review#1
1032 James Drive, Leesport, PA 19533.P: 610.916.8500.F: 610.916.8501
SchuylkillHaven,PA.P:570.385.5549
Boyertown,PA.P:610.369.1319

MaidencreekTownshipPlanning Commission
June3,2020
Re:
JojazSubdivision
Page 2 of 8
Preliminary/FinalPlan Review#1
ZONING:
The property is located in the I - Industrial Zoning District. The uses of the proposed parcels are
not determined at this time. Each lot will require a Land Development Plan in order to develop a
particularuse.
Comments on otherissues are presented below.
1.Per$220-48,PermittedUses
The Applicant should list the intended and existing uses on the proposed parcels
2.Per$220-49,AreaandBulkRegulations
Theproposed lotsto becreated appeartobe compliant with area and bulk
requirements. The subdivision plan does not show any new development on the
proposed lots. Four (4) existing buildings would be removed.
3.Per$220-79,EnvironmentalImpactAssessment
Anysubdivision orland developmentplan requires thesubmission of an
Environmental ImpactAssessment(ElA).Anoverall ElA shouldbesubmittedor
ElA's will be required atthe time ofland development on each subdivided lot.
SALDO:
1.Per$190-15,PreliminaryPlanRequirements
Per Subsection N(4),all lots should be numbered.
oThe"residue lot" should be given a number even if it is to be non-buildable.
PerSubsectionN(5),A statement of the intended useofallnon-residential lots
should beprovided.
2.Per5190-16,InformationtoAccompanyaPreliminaryPlan
Per Subsection G(5), a deed must be prepared and submitted to the Township
prior to recording. The deed shall include descriptions of the proposed right-of-
way and all easements.
SDE

MaidencreekTownshipPlanningCommission
June 3, 2020
Re:
JojazSubdivision
Page 3 of 8
Preliminary/FinalPlanReview#1
3.Per$190-17,FinalPlanRequirements
The plans should be sealed by a Professional Engineer priorto Final Plan approval.
Per Subsection A(12), clear sight triangles.
o It appears that clear sight requirements are met. However, clear sight
triangles should be added to the plan and clearly marked to satisfy this
Final Plan requirement.
The Applicant should also see Sight Distance requirements in
Section g190-32.H.
4.Per$190-32,Streets
Per subsection A(5), Private street are prohibited unless they meet the Township's
design standards.
The proposed street meets the Township's width and cartway standards;
however, the cartway width may need to be increased per the comment
below.
Per subsection B(3), the Township may require greater cartway and right-of-way
widths if deemed necessary.
The Township should determine the need for additional cartway due to
truck turning radi. It appears trucks would need to use the edge of the
cartway.
Per subsection F(1), vertical curves along local access roads shall have a sight
distance of at least 200 feet.
The proposed road should be amended to achieve a sight distance of at
least 200 feet.
Per subsection G(6), curb radii at intersections involving local access road shall be
at least twenty (20) feet.
Radius labels should be added to the plan and should demonstrate a
minimum compliance with the 20-foot requirement.
SDE

MaidencreekTownshipPlanningCommission
June 3, 2020
Re:
JojazSubdivision
Page4of 8
Preliminary/Final Plan Review#1
Per subsection I(2), inno case shall apublic single-access street be the solemeans
of vehicularaccess toa non-residential use.
Per subsection L(3), curbs and sidewalks shall be provided in accordancewith
Section $186.
Persubsection L(5),Streetlights maybe required bythe Boardof Supervisors.If
required, the streetlight plan shall be included with any Preliminary Plan or Final
Plan submittaland shall be approved by mutual agreement between the
Township,developer, and any appropriate public utility, a utility easement would
also be required for maintenance.
5.Per$190-39,SoilPercolationTestRequirements
Soil percolation tests are required for all subdivisions where on-site sewage is
provided.
o The Applicant should coordinate percolation test requirements with the
Sewage Enforcement Officer, especially as it relates to any requirements on
the proposed non-building lot.
STORMWATER MANAGEMENT:
1.Per S182-11,Erosion and Sediment Control -- The Erosion & Sediment Control Plan should
be submitted to the Berks County Conservation District for review and approval. A copy
ofthe approval letter and NPDES Permit (if required) should be submittedto the
TownshippriortoFinal Planapproval.
2.Per §182-13.B, Groundwater Recharge -- The feasibility of groundwater recharge BMPs
should be evaluated. If a site-specific evaluation indicates recharge BMPs are feasible, the
information required by this section should be provided. If recharge BMPs are not
recommended, Soil Amendment & Restoration in accordance with the PA Stormwater
Management BMp Manual should be considered as a possible recharge BMP.
computations and construction information should be provided on the plans. It should be
noted that the Area used in Equation No. 1 is the total new impervious area.
SDE

MaidencreekTownshipPlanningCommission
June3,2020
Re:
JojazSubdivision
Page5of8
Preliminary/FinalPlanReview#1
4.Per g182-15,Streambank Erosion Requirements-Computations and rate control
measures should be provided to reduce the post-development 2-yr 24-hr ScS storm
runoffto the 1-yrpre-development rate.
5.Per 182-16,Stormwater Management Districts-The propertybeing developed is
located in Management District C which requires post-development site runoff to not
exceed existing runoff. The post-development site runoff will be increased as a result of
the proposed roadway and cul-de-sac construction. However, an exemption may be
applicable; see Comment below for $182-21, Exemptions.
6.Per $182-17.D.(1),Design Criteriafor StormwaterManagement and Conveyance BMPs-
Design computations should be provided for the roadside swale. The plan does not
proposeastorm sewersystem.
Future lot developers will be required to provide on-lot detention facilities to control
post-construction runoff increases to not exceed the design flow assumed for the swale.
The swale should be designed with a minimum 6" freeboard in accordance with the DEp
E&SPCProgramManual requirements.
at this time to allow for future tie-in by the individual lot storm drainage systems.
9.
requirements of $182-21 or $182-22 should be submitted.
10. Per §182-21, Exemptions -It appears that the project meets the requirements for an
exemption from the drainage plan requirements. If an exemption is requested, the
Applicant should submit the information required by $182-21.B.(2).
In addition, the Applicant should address the requirements of $182-21.C since the project
is located in an Exceptional Value watershed (Peter's Creek).
MISCELLANEOUSSTORMWATERMANAGEMENTPLANANDREPORTCOMMENTS:
1.If the Township grass clippings drop-off site is to remain, a driveway culvert should be
provided.
2. Concentrated runoff from the northwest portion of Lot 3 will be directed onto the cul-de-
sac. A roadside swale should be provided to convey this flow to the proposed Type M
inlet.
SDE

MaidencreekTownshipPlanningCommission
June 3,2020
Re:
Jojaz Subdivision
Page6of8
Preliminary/FinalPlan Review #1
3. Due to the presence of significant areas of impervious cover on Lots 1, 2 and 3, we
recommend that the impervious areas to be used for future lot runoff computations (per
§182-16) be established at this time to avoid confusion in the future. A note or table
should be provided on Sheets 1 and 2 listing the area of existing impervious cover that will
remain after some of the existing impervious cover isremoved duringgrading forthe
proposed roadway and swales.
The areas of impervious cover removal should be delineated on the Existing Features Plan.
4.The plan should show how the concentrated roadside swale flows will be dispersed in a
non-erosive manner.
5.Theproposed Type M inlet grateelevation is set approximately3feet lower than the cul-
de-sac edge of paving. This creates a steep slope off the proposed 2-ft "shoulder" area
andalsoresults inaverysteeproadsideswaleslope.
CONSTRUCTION DETAILS:
1.The Typical Proposed Interior Road Section should be revised to note the dimensions and
side slopes of the roadside swale.
2. The paving cross-section should note Superpave material instead of ID-2 material.
BERKS COUNTYPLANNING COMMISSION COMMENTS:
1. The following are stand-out comments from the BCPC letter dated May 19, 2020. There
are twelve (12) comments in total, not all are mentioned here. The applicant should be
aware of all BCPC comments; the May 19, 2020 letter states that both Jojaz Properties,
LLC and Crossroads, LLC received carbon copy of the BCPCreview letter.
2. Highlighted BCPC Comments
Access Easement 2shouldbe reviewed bythe Township Solicitorfor
appropriateness and the easement should be recorded with the Final Plan.
SDE

MaidencreekTownshipPlanning Commission
June 3, 2020
Re:
JojazSubdivision
Page 7 of 8
Preliminary/Final PlanReview #1
Special consideration should be given to Peter's Creek, which is designated as
Exceptional Value (EV)waters. It is located approximately600feet south of the
subject site on land owned by the City of Reading Water Bureau.
The site is within the surface water source area of the Reading Area Water
Authority. BcpC recommends that the developer contact the Authorityfor more
information.
Consideration should be made to viewshed of historic areas. The developer
should referencethe BCPC Historical ResourceInventoryand thePA Historic
MuseumCommissionkeyfile#101714.
MISCELLANEOUS:
1. Traffic
a. Trucks are prohibited on Evansville Road. Trucks will be required to use Maiden
Creek Road to Route73 andto Pleasant Hill Road
b.The proposed road construction at Maiden Creek Road requires a PennDOT
Highway Occupancy Permit. If there is an HOP for the existing driveway, a copy
should be provided bythe Applicant.
In addition, Recording Note 8should be removed or revised.
2. On-lot sewage is proposed.
a.A public sewer system should be investigated to determine feasibility to include
Molltown area and Maiden Creek Road users.
3.The plan should clarify the limits of the existing pavement to be removed in the area of
the proposed cul-de-sac where the existing driveway for Custom Milling & Consulting, Inc.
will tie intothe new road.
4.Maidencreek Township currently maintains a Township residential grass clippings drop-off
location on the northwest corner ofthe property along Maiden Creek Road. The future
status of this facility should be noted.

MaidencreekTownship Planning Commission
June3,2020
Re:
Jojaz Subdivision
Page8of8
Preliminary/FinalPlanReview#1
5.The proposed road is to remain private; a Maintenance agreement for the proposed road
should be submitted by the applicant and commented on by Township Solicitor.
If you should have any questions or comments, please do not hesitate to contact our office.
Sincerely,
SYSTEMSDESIGNENGINEERING,INC.
PhilipJ.Ashear
Township Planning Consultant
Cc:
MaidencreekTownshipPlanningCommissioners
Diane Hollenbach/TownshipManager
EugeneOrlando,Jr./TownshipSolicitor
The Crossroads Group
SDEFile#20-0024-0715
SDE

SYSTEMSDESIGN
"APassionforEngineering Excelence
SDE
ENGINEERING,INC
sdei.net
June3,2020
DianeHollenbach,TownshipManager
MaidencreekTownship
1 Quarry Road
Blandon,PA19510
Re:
Redner'sQuickshopandCarWash
PreliminaryPlanReview#1
Ms.Hollenbach:
Systems Design Engineering, Inc. is in receipt of a Preliminary Plan entitled"Redner's Quickshop
and Car Wash."The site has three (3) access points; two on Allentown Pike (US Route 0222)and
another on Lake Shore Drive (PA Route 0073). The proposal would result in gas pumps, a
convenience store, and car wash. The Plan was prepared by Bogia Engineering, Inc. The
submission consisted of a memo from the Township,a Township SALDO application, a County
SALDO application, a StormwaterManagement report and the following:
Sheet 1 of 9
Cover Sheet
Dated5/20/2020
Sheet 2 of 9
Existing Conditions Plan
Dated5/20/2020
Sheet 3 of 9
Grading and Utility Plan
Dated5/20/2020
Sheet 4 of 9
Details Plan
Dated5/20/2020
Sheet 5of 9
Landscaping Plan
Dated5/20/2020
E&S Plan
Sheet 6of 9
Dated5/20/2020
Sheet 7of 9
E&SPlanDetails
Dated5/20/2020
Sheet 8of 9
Drainage Area
Dated5/20/2020
Sheet 9of 9
Truck Turn
Dated5/20/2020
BACKGROUND:
The purpose of the plan is to establish a gas station, car wash and convenience store on parcels
1.75 acres in size. The site is to be served with public water and sewer. The site previously
included a gas station and Top Star convenience store. The current proposal would utilize the
existing building, while gas pumps would be moved to the southwest side of the site and a car
I:\Projects)Maidencreek Township PC/20-0024-0717 Redner's Quickshop and Car Wash/Redner's Prel Plan Rev #1.docx
1032 James Drive, Leesport, PA 19533.P: 610.916.8500.F: 610.916.8501
Schuylkill Haven, PA.P:570.385.5549
Boyertown,PAP: 610.369.1319

MaidencreekTownshipPlanningCommission
June3,2020
Re:
Redner'sQuickshopandCarwash
Page 2 of 12
PreliminaryPlanReview
wash would be constructed. The existing driveway onto Rt. 222 will be removed and a new
driveway constructed to the south.
REVIEW:
This letter presents comments on the first review of the submitted Preliminary Plan.
ZONING:
The subject site is located in the C-1 Local Commercial Zoning District.
1.Per $220-49, Area and Bulk Regulations
The proposed development is compliant with the area and bulk requirements of
the C-1District.However, Section $220-75 supersedes the setback requirement
for parcels that border Us Route 0222. The required setback shall be 100 feet.
o Section $220-75.B states that parcels with less than 150 feet of lot depth
shall have a front setback of 2o feet or comply with the setback of the
given zoning district, whichever is greater.
1.The required front setback in the C-1 district is 5o feet.
a. The southwestern portion of the lot may follow the setback
requirements of the C-1 district. Setback requirements are
met.
2. The main portion of the site at the corner of Allentown Pike and
Lake Shore Drive should comply with the 100-foot setback
prescribed in Section s220-75. However, the current building would
be an existing non-conformity and may be used.
Adeed of consolidation should be submitted andrecorded with the plan.
The plan states the car wash is considered an accessory use.
SOF

Maidencreek Township Planning Commission
June3,2020
Redner'sQuickshopandCarwash
Re:
Page3of12
PreliminaryPlanReview
This review does not interpret the proposed car wash as an accessory use.
Additional information should be provided or the car wash must comply
with the special exception requirements stated below.
2. Per $220-61.B, Parking and Truck Loading Requirements
Parking spaces for use by handicapped drivers must be 14'× 20' or otherwise
regulated by the Americans with Disabilities Act.
The two (2) spaces providedforhandicapped drivers do not satisfy the
above requirement. However, according to the ADA Technical Assistance
website, they do appear to meet the requirements of the Americans with
Disabilities Act. The Applicant should clarify or amend the plan such.that it
meets both Township and ADA standards.
1.Labelling and signage for handicap parking spaces should be
provided.
3.Per $220-62, Sign Regulations
A previous sign at the corner of Allentown Pike and Lake Shore Drive was
removed. However, new sign details are not provided.
The Applicant should put sign details on the plan and demonstrate
compliance withSection$220-62.
4. Special Exceptions
The proposed uses are only permitted via a special exception subject to conditions
of this section and with the approval of the Zoning Hearing Board.
oThe Applicant will need to submit the appropriate application to the
Maidencreek Township Zoning Hearing Board and obtain approval.
Section $220-65 states special exception requirements for car washes:
oCar washes are permitted only in an enclosed building that must be at least
100 feet from residential districts and right-of-way intersections.
Additionally,sufficient space must be provided for at least ten (10) stacked
vehicle spaces.

MaidencreekTownshipPlanningCommission
June3,2020
Re:
Redner'sQuickshopand Carwash
Page 4 of 12
PreliminaryPlanReview
Section s220-69 states special exception requirements formotorvehicles service
stations:
Gas pumps must be at least 30 feet set back from the ultimate right-of-
way, and any canopy must be set back at least 20 feet from the ultimate
right-of-way.
These requirements are met bythe submitted PreliminaryPlan.
The Applicant may also wish to seek zoning variances during the Zoning Hearing
Board Special Exception hearing.
LIGHTING STANDARDS:
1.Per186-48,LightingPlanSubmission
Lighting plans are required in the Preliminary Plan stage of all development plan
reviews.
The submitted plan includes light fixture details, but does not include a
lighting schedule with footcandle data and intensities. A lighting plan
should be submitted in conformance with Section §186.
The Applicant should also see performance standards in Section
$220-63.
SALDO:
1.Per190-15,PreliminaryPlanRequirements
Per Subsection C, the plan shall be sealed bythe professional responsible forthe
plan.
2.Per§190-34Sidewalks
Sidewalks may be required for commercial developments by the Board of
Supervisors. Ultimately,the Board of Supervisors should decide on the efficacy of
sidewalksforthis proposeddevelopment.
SDE

MaidencreekTownshipPlanningCommission
June 3,2020
Re:
Redner's Quickshopand Carwash
Page5of 12
PreliminaryPlanReview
Likewise,in accordancewith Sections $190-34.Dand $190-35.C,the Board
of Supervisors and Planning Commission maywishto determinethe
efficacyofa crosswalk at thegivenintersection.
3.Per 190-44,Landscaping
The selected species-Prunusserrulate(KwanzanCherry)and Juniperus Chinesis
(Seagreen Juniper) -- are not included on the Townships recommended list.
The Applicant should address the need for the selected species or the
Applicant should amend thelandscaping plan with species included on the
Township's recommended list.
In addition to the above landscaping comments, the applicant should amend the
landscaping plan to comply with BufferYard requirements found in Section 5220-
64.
oAten-footbufferyard is required.
STORMWATER MANAGEMENT:
1.Per 5182-11, Erosion and Sediment Control--The Erosion &Sediment Control Plan should
be submitted to the Berks County Conservation District for review and approval. A copy
of the approval letter should be submitted to the Township prior to Final Plan approval.
2. Per §182-13.B, Groundwater Recharge -- Computations should be provided to show how
the computed recharge volume requirement is being provided.
If additional infiltration BMPs besides amended soil are proposed, soil infiltration testing
must be performed, per §182-13.B.(2),and justification for infiltration BMPs should be
provided, per $182-13.D.
3.Per $182-13.l, Groundwater Recharge--The detention basin should be provided with an
impermeable liner to prevent infiltration and potential groundwater contamination,
unless the justification required by $182-13.D is provided.
4.Per 182-14, WaterQuality Requirements-Computations shouldbe provided to show
how the computed water quality volume requirement is being provided.

MaidencreekTownshipPlanning Commission
June3,2020
Re:
Redner'sQuickshopandCarwash
Page 6 of 12
PreliminaryPlanReview
5.Per s182-16, StormwaterManagement Districts --The property being developed is
located in Management District B-2. The post-development site runoff to Points of
interest 2 and 3 does not meet the required reductions for the 25-yr and 50-yr storms.
In addition, the computations appear to assume all post- development runoff to the Point
of Interest controlled by the detention basin is directed into the basin and no runoff
bypasses the basin and drains directly to the Point of Interest. This is not the case, and
the computations should address the bypass flow contribution to the total post-
development runoff.
6.Per182-17.C.(1), Design Criteria for Stormwater Management and Conveyance BMPs -
The emergency spillway should be relocated to discharge to the PennDOT right-of-way
instead ofontotheMaidencreekTV&Applianceproperty.
7.Per $182-17.C.(4), Design Criteriafor StormwaterManagement and Conveyance BMPs -
The interior and exterior embankment side slopes should be no steeper than 3:1;
however, the grading plan contours reflect slopes that are approximately 2.5:1. The side
slopes should be noted on thebasin cross-section detail.
8.Pers182-17.C.(5), Design Criteria for Stormwater Management and Conveyance BMPs -
Anti-seep collarcalculations shouldbeprovided.
9. Per 182-17.C.(12), Design Criteria for Stormwater Management and Conveyance BMPs
The bottomof the detention basin should begraded toprovide a minimum2% slope
toward the outlet structure.
10. Per §182-18.B, Calculation Methodology - It appears that the 24-hr rainfall depths used
for the SCS runoff computations are based on NOAA data instead the Table B-1 depths.
The NOAA rainfall table should be included in the report.
11. Per 182-22.B.(21), Drainage Plan Contents -Notes listing the proposed stormwater
management BMPs and their associated long-term operation and maintenance
responsibilities should beprovided on theplans.
12. Per §182-22.B.(22), Drainage Plan Contents - A note should be added to the cover sheet
and signed by the landowner acknowledging that any revision to the approved drainage
plan must be approved by the Township and the Berks County Conservation District; also
see §182-22.E.(2)(d)
13. Per §182-22.B.(23), Drainage Plan Contents -- The design engineer's certification signature
block should be added to the cover sheet.
SDF

Maidencreek Township Planning Commission
June3,2020
Re:
Redner'sQuickshopandCarwash
Page7of12
Preliminary Plan Review
14.Per $182-22.D.(3), Drainage Plan Contents -- The pre-development drainage area
boundaries are difficult to read on the Existing Conditions Plan; please revise per the post-
development plan format.
In addition, the following revisions should made to the pre-and/or post-development
drainage area plans:
1)  Label the Points of Interest
2)
 The drainage area boundaries should be based on the existing or proposed
contours and actual drainage patterns.
3)
Delineate the drainage area to the detention basin.
4)
Delineate the drainage area to Point of Interest 3 that bypasses the detention
basin.
5) Delineate the additional off-site area contributing to the Points of Interest and
the detention basin.
15. Per $182-22.E, Drainage Plan Contents --An operations and maintenance plan for the
proposed stormwater controls an BMPs should be provided.
16. Per §182-24.F--The proposed storm sewer connection to the proposed inlet located
within the SR 0222 right-of-way, as well as the driveway modifications, will require a
PennDOT Highway Occupancy Permit. A copy of the HOP(s) should be submitted to the
Township priorto Final Plan approval.
It should be noted that the PennDOT plans show different driveway entrance
configurations than proposed on the land development plans.
17.Per 182-30, Performance Guarantee--A financial guarantee should be provided for the
proposed stormwater management controls prior to Final Plan approval.
18.Per$182-32 and $182-34,OperationsandMaintenance Agreement forPrivatelyOwned
Stormwater Controls and BMPs - The Stormwater Management Controls and Best
Management Practices Operations and Maintenance Agreement in Appendix A of the
Stormwater Management Ordinance should be submitted for review and approval by the
Township.
19. Per $182-33, Stormwater Management Easements -Stormwater management easements
should be provided to allow access for inspection, maintenance or preservation of the

MaidencreekTownshipPlanning Commission
June3,2020
Re:
Redner'sQuickshopandCarwash
Page8of12
PreliminaryPlanReview
proposed stormwater management BMPs by the Township or their authorized agent. A
note onthe Cover Sheetproviding ablanket easement is acceptable.
20.Per $182-35, Recording of Approved Stormwater Control and BMP Operationsand
Maintenance Plan and Related Agreements -- A note should be added to the Cover Sheet
requiring recording of the operations and maintenance plan, operations and maintenance
agreement and easements within 15 days of approval of the plan by the Board of
Supervisors.
MISCELLANEOUSSTORMWATERMANAGEMENTPLANANDREPORTCOMMENTS:
1.The SWM report narrative describes the site runoff being computed using the Rational
Method and the VT/PsUHM computer model; however, the computations are based on
the SCS method using different software. In addition, the Table of Contents notes
incorrect plan numbers for the drainage area plans. The report should be revised to
accurately reflectthe contents.
2. The hydrographs for the detention basin inflow and the bypass area runoff area should be
included in the report.
3. Based on our site visit, it appears there is a large off-site area from the adjacent self-
storage property that drains onto the site, some of which will enter the proposed
detention basin. Off-site contours and contours on the project site along the property
line (based on field survey rather than 2' Lidar information) should be shown on the plans
in order to accurately determine existing drainage patterns. The off-site runoff should be
accounted for in both the pre-development and post-development runoff computations,
unless this water is diverted around the detention basin.
4.The detention basin outlet pipe is proposed tobe 15"diameter; however,PennDOT
requires a minimum 18" diameter pipe in the highway right-of-way.
5. The basin stage/discharge computations are based on the outlet structure top of grate at
341.00; however, plan view and outlet structure detail note a top of grate at 340.90.
6.Theemergency spillway computations should be revised to reflect the proposed invert
elevationandtop ofberm elevations.
COMMENTS ON THE GRADING & UTILITY PLAN:
SDE

MaidencreekTownshipPlanningCommission
June3,2020
Re:
Redner'sQuickshopandCarwash
Page 9of 12
PreliminaryPlanReview
1.The existing and proposed sanitary sewer and water systems should be shown on the
plan, per $182-22.B.(5). It should be noted that these utility lines are presently being
relocatedbytheMaidencreekTownshipAuthority (MTA).
2. The MTA construction plans provide for a reconstructed sanitary lateral to serve existing
Lot 1 at the current lateral location; no lateral was constructed for Lot 2. Consequently, a
new lateral connection is required forthecarwash.
3.If theexisting fuel storage tanks arebeing removed as noted in the Stormwater
Management Report, the tanks should be shown on the plan and the requirements for
this work should be noted.
4.As presently graded, runoff will be directed into the car wash entrance of pond in front of
theentrance.
5. The proposed gas fueling area canopy and the carwash roof drainage system should be
shown/detailed.
should match existing curb; however, there is no existing curb shown here on the Existing
Conditions Plan.
7.Grading Note 11 on the Grading & Utility Plan should be removed.
8. The Basin 1 outlet structure is incorrectly noted as a Type C inlet.
MISCELLANEOUS DRAFTING COMMENTS:
1.The plans depict the approximate location of the new PennDOT curb line and storm sewer
system associated with the widening of Rt. 222 along the property frontage. The plans
indicate these features are existing; however, they are not yet constructed, and a plan
note states that PennDOT did not provide Bogia Engineering with construction drawings.
The plans should clarify the source of all improvements shown on the drawings that are
not currently existing, and these improvements should not be depicted graphically as
existing.
The storm iniet grate and invert elevations should be provided at this time based on the
PennDOT construction pians in order to evaluate the Basin 1pipe connection.

MaidencreekTownship Planning Commission
June3,2020
Re:
Redner'sQuickshopandCarwash
Page 10of 12
PreliminaryPlanReview
The one obvious improvement made for the widening is installation of new utility poles
along the entire frontage of the project. These poles should be surveyed and shown on
the plans in order to evaluate conflicts with the proposed driveway.
2. The following revisions should be made to the Basin 1 Outlet Structure detail:
A.The 6" diameter and 3"x12" orifices used in the stage/discharge computations
should be shown along with their inverts.
B. The outlet pipe invert should be noted.
C. If the grate dimensions remain, they should dimension the grate instead of the top
unit.
3.The end section detail should be removed from the Details sheet, unless revised plans
showaproposed end section.
4. We recommend that the curb opening at the carwash exit be noted as a depressed curb
to prevent erosion and undermining of the pavement.
5. The plans should show the area of the truck access paving construction.
6.Construction details should be provided for the following:
A. Storm sewer bedding and backfill detail should be provided in accordance with the
requirements of $182-17.D.(8)
B.
Utilitytrench bedding/backfill
C.
Depressed curb openingat carwash
D.
Detention basin cross-section
E.
Emergencyspillway
F.
Anti-seep collar
G. The paving cross-sections should note Superpave material instead of ID-2 material.
MISCELLANEOUS:
1.The three (3)existing lots should be combined prior to Final Plan approval. The plan
states this isthe intention. A deed should be provided.
SDE

Maidencreek TownshipPlanning Commission
June 3, 2020
Re:
Redner'sQuickshopandCarwash
Page 11 of 12
PreliminaryPlanReview
2. MTA approval is required. The plans should be submitted to the Maidencreek Township
Authority and an approved review letter should be provided to the Township upon
receipt.
3. The proposed location of the fuel tanks block the southwestern access to Allentown Pike.
An alternative location for the fuel tanks should be investigated.
4.An approved PennDOT Highway Occupancy Permit should be provided for access points
alongAllentownPike.
5. Existing and proposed stop sign locations and details should be provided.
6. Curb Radii
The applicant should explain or amend the 2-foot curb exit radius at the
northeastern access point to Us Route 0222.
Curb radii at the new parking
7. Turn radii in and out of the car wash seem inappropriate given the current layout. A
turning radius plot should be provided for large pick-up trucks entering and exiting the car
wash. The layout may need to be modified to provide adequate access.
8. Curb grades should be provided for proposed car wash curbing.

MaidencreekTownshipPlanningCommission
June 3,2020
Re:
Redner'sQuickshopand Carwash
Page 12 of 12
PreliminaryPlanReview
If you should have any questions or comments, please do not hesitate to contact our office.
Sincerely,
SYSTEMSDESIGNENGINEERING,INC.
PhilipJ.Ashear
Township PlanningConsultant
Cc:
MaidencreekTownshipPlanningCommissioners
Diane Hollenbach/Township Manager
EugeneOrlando,Jr./TownshipSolicitor
Bogia Engineering, Inc.
SDE

SYSTEMSDESIGN
"a Passion for Engineering Exce ence"
SDE
ENGINEERING,INC
sdei.net
June3,2020
MaidencreekTownshipManager
1 Quarry Road
Blandon,PA19510
Re:
DavidKopferLot2Subdivision
SketchPlanReview
Ms. Hollenbach:
Systems Design Engineering, Inc. is in receipt of a Sketch Plan for Record entitled "David Kopfer
Lot 2." The site has two (2) sections that are deeded as one (1) parcel. The first is the larger
portion located on the northeast side of Pleasant Hill Road. The second is the smaller portion
that is located on the southwest side of Pleasant Hill Road at the intersection with Hoch Road.
The Plan was prepared by Tarson, LLC. The submission consisted of a Subdivision and Land
Development Application and the following:
Lot 2 Detail
Sheet 1 of 2
Dated1/24/2020
Total SitePlan
Sheet 2 of 2
Dated1/24/2020
E&SPlan
Sheet 1 of 3
Dated 1/24/2020
E&SPlan
Sheet 2 of 3
Dated 1/24/2020
E&SPlan
Sheet3of3
Dated4/20/2020
Sewage Planning Module
Dated5/14/2020
StormwaterAnalysis
Dated5/14/2020
Background:
The purpose of the plan is to subdivide an existing tract that is zoned for Agricultural Preservation
acres in size. The smaller of the two portions would be subdivided. The subdivision would create
a 1.5-acre flag lot that would be used for single-family residential. The new lot would have access
to Hoch Road via a flag lot access strip and would not have access to Pleasant Hill Road. Lots are
to be served by private individual wells and individual on-site sewage disposal.
I:/Projects\Maidencreek Township PC/20-0024-0718 David Kopfer SubdivisioniSubdivision Review Letter.docx
1032JamesDrive, Leesport,PA19533.P:610.916.8500.F:610.916.8501
Schuylkill Haven,PA.P:570.385.5549
Boyertown,PA.P:610.369.1319

MaidencreekTownshipPlanningCommission
June3,2020
Re:
DavidKopferSubdivision
Page 2 of 6
SketchPlanReview
REVIEW:
This letter presents comments on the first review of the submitted Sketch Plan for Record. This
plan fits the criteria of "plans Exempt from Standard Procedure" with the exception of zoning
standards for road frontage. The Applicant will need to seek Zoning Hearing Board approval for
the proposed flag lot orrevise the lot layout.
ZONING:
The property is located in the AP - Agricultural Preservation District. The use of the proposed
parcel is single-family residential; the use of the existing parcel is agriculture with a single-family
residence.
Additional comments are presented below.
1.Per$220-16,Permitted Uses
Single-family residential is permitted in the Agricultural Preservation District
subject to the stipulations of Section $220-17, which includes the 1982 Right-to-
FarmActdisclosure.
2.Per $220-17,Area and Bulk Regulations
The lot area must be 1.5 acres in size.
Therequired road frontage is 150feet.
o The proposed lot is a flag lot with approximately 20 feet of road frontage.
The Applicant should amend the dimensions of the proposed subdivision
lot or seek a Variance from the Zoning Hearing Board.
1.Note:Per Section §190-13, if a Variance for a flag lot were to be
granted by the Zoning Hearing Board, the "access strip" of the flag
lot would not be counted toward the 1.5-acre reguirement.
Flag lots are defined in Section $220-11 of the Zoning Ordinance.
However, all existing flag lots are non-conforming and new flag lots are
not permitted.
SDE

MaidencreekTownshipPlanningCommission
June3,2020
Re:
DavidKopferSubdivision
Page 3of 6
SketchPlanReview
SALDO:
1.Per $190-29,Plans Exemptfrom StandardProcedures
The Applicant intends the submitted plan to be considered exempt from standard
procedures. However, the following are comments on the plan's suitability for
exemption from standard procedures. The plan should not be granted approval
until each are these comments are address or waivers are granted.
oPer Subsection A, a plan must be labelled as a Final Plan to be considered
as exempt from Standard procedures. The plan title should be updated.
The"Sketch Plan for Record" can be reviewed and endorsed asa
Final Plan bytheBoard of Supervisors if advisedto do so by the
Township Planning Commission.
PerSubsectionE(3),theplanmustshowcompliancewithAreaand Bulk
requirements.
The submitted plan does not meet the Area and Bulk requirements
for road frontage. According to this section, the plan does not
qualify for exemption from standard procedures if the Area and
Bulk requirementsare not met.
2. Per §190-33, Driveways
Per subsection A(2), at least the first twenty (20) feet of driveway must be paved,
starting at the edge of the cartway.
A clear sight triangle should be added to the plan for the proposed driveway.
SEWAGE ENFORCEMENT:
1. The current plan does not have labels for probes 1,2 and 3. Labels should include
identification number and limiting zone and slope over the perc areas.
Labels should be updated to the satisfaction of the Sewage Enforcement Officer.
The primary area and replacement area for the proposed on-lot sewage disposal
system should be labelled on the plan.
2. The symbology for the proposed well should be added to the plan in the legend.
SD

MaidencreekTownshipPlanningCommission
June 3,2020
Re:
DavidKopferSubdivision
Page4 of 6
SketchPlanReview
3. A new deed should be provided that includes the description of the proposed nitrate
easement.
4. The nitrate abatement area/easement must be investigated as to the potential impact to
adjoining properties. See attached email from DEP regarding the potential issues with the
existingabatement area/easement.
STORMWATER MANAGEMENT:
1.Per S182-11, Erosion and Sediment Control --The Erosion &Sediment Control Plan should
be submitted to the Berks County Conservation District for review and approval. A copy
of theapproval lettershouldbe submitted to theTownship.
correspond to the test pit numbers in the Soil Testing Report. It appears there are only
three (3) test locations shown on the plan.
The design infiltration rate should be based only on the tests located in close proximity to
theberm/basin.
3. Per g182-15, Streambank Erosion Requirements --The current design does not meet the
required rate control to reduce the post-development 2-yr 24-hr SCS storm runoff to the
1-yr pre-development rate. The designer should contact our office to discuss this
requirement.
4.Per 182-16,Stormwater Management Districts -- The property beingdeveloped is
located in Management District B2which requires post-development site runoff to be
significantly reduced compared to existing runoff. The post-development site runoff will
be increased as a result of the proposed driveway and house construction, and based on
the runoff computations provided, these reductions are not met by the proposed design.
However, an exemption from this section of the ordinance would be applicable; see
Commentbelowfor$182-21,Exemptions.
5. Per §182-21.B.(1), Exemptions -- The project meets the requirements for an exemption
from the drainage plan requirements, which allows a maximum of 15,o00 square feet of
total new impervious cover on the parent tract. If an exemption is requested, the plan
should note the total proposed impervious cover being approved for Lot 2 and the
remaining allowable impervious coverfor any future dwelling unit construction.
SDE

MaidencreekTownshipPlanningCommission
June3,2020
Re:
DavidKopferSubdivision
Page 5 of 6
SketchPlanReview
Based on the computations submitted, the streambank erosion peak rate reduction must
still be addressed.
6. Per S182-22.B.(22), Drainage Plan Contents -A note should be added to the plan and
signed by the landowner acknowledging that any revision to the approved drainage plan
must be approved by the Township and the Berks County Conservation District; also see
$182-22.E.(2)(d).
7.Per $182-22.D.(1)--Thefollowing construction details should beprovided:
1)Infiltration berm/basin cross-section
2) Emergency spillway
8.Per $182-32 and $182-34, Operations and Maintenance Agreement forPrivately Owned
StormwaterControls and BMPs--TheStormwater Management Controls and Best
Management Practices Operations and Maintenance Agreement in Appendix A of the
Stormwater Management Ordinance should be submitted for review and approval by the
Township.
The long-term operations and maintenance requirements for the infiltration berm/basin
should be noted on the plan.
9.Per s182-33,Stormwater Management Easements--Stormwatermanagement easements
should be provided to allow access for inspection, maintenance or preservation of the
proposed stormwater management BMPs by the Township or their authorized agent. A
note on the Cover Sheet providing a blanket easement is acceptable.
MISCELLANEOUS DRAFTING COMMENTS:
1.A driveway cross-section and pavingdetail should beprovided.
MISCELLANEOUS:
1. The applicant should address any restriction in use within the nitrate easement. This
should include any restriction to cultivation. Markers may need to be placed in the field if
cultivation isprohibited.
2.Townshipand DEP approval for an on-lot system should be obtained priorto Final Plan
approval of thesubdivisionplan.
SDE

MaidencreekTownshipPlanningCommission
June3,2020
Re:
DavidKopferSubdivision
Page6of 6
SketchPlanReview
3. The applicant may need to amend the proposed boundaries of the nitrate easement to
the satisfaction of DEP.
Iif you should have any questions or comments, please do not hesitate to contact our office.
Sincerely,
SYSTEMSDESIGNENGINEERING,INC.
PhilipJ.Ashear
Township Planning Consultant
Cc:
Maidencreek Township Planning Commissioners
DianeHollenbach/TownshipManager
EugeneOrlando,Jr./Township Solicitor
DanLaudenslayer/Tarson,LLC
SDE

Philip Ashear
From:
Richard, Zach<zrichard@pa.gov>
Sent:
Tuesday,June2,20203:23PM
To:
Scot McCaffrey
Cc:
Philip Ashear
Subject:
Re:[External] MaidencreekTownship,Berks County;DavidKopferModulePlan
Scot,
I've provided a summary below for nitrate easements and their use for planning. In short, the easement as
enough to accommodate what was suggested in the preliminary hydrogeologic study, the easement needs to
containtheplume.
For subdivisions where lots do not possess enough acreage to provide the quantity of groundwater recharge
sufficient to mitigate the nitrate-nitrogen impact of the OLDs discharge to below an average concentration of
1o mg/l, recorded easements providing the extra land area will be acceptable if:
1. The overall background nitrate-nitrogen concentrations do not currently exceed 10 mg/l, the EPA Maximum
Contaminant Level.
2. The easement is located directly abutting and in the down gradient direction of each individual lot. The
determination of down gradient can be achieved either by water level measurements or by use of the
engineer completing the study must make the recommendation. This is often a plume analysis and the
easement mustcontain theplume.
3. The easement must be clearly located and labeled on the plot plan for recording at the County Courthouse.
4. Both the plot plan, the narrative, and the deeds of the new lot, the lot on which the easement is located,
and the remaindermust note thefollowing:
a. The easement is to provide groundwater recharge for diluting sewage
flows on lot(s)
b. That the easement will exist until the lot is served by a community
sewage system.
c. The easement will not be covered with impermeable surfaces
d. The easement area cannot be used to provide groundwater recharge for diluting
othersewageflows.
e. No drinking water wells may be drilled in the area of the easement area.
5. The plot plan and narrative must state specifically the easement location. It must also contain all the
language found in item 4. The narrative must state the failure to record all the appropriate deed restrictions
concerning the easements on all the properties involved negates both the township and state planning
approval, andthe lots cannot becreated.

6. One easement can be acceptable for multiple lots as long as the recharge easement is directly adjacent and
downgradient from each individual system proposed. At no time can a plume cross another property without
the creation of a groundwater easement.
7. If neighboring land owner(s) are involved, the applicant shall provide an agreement signed by the
neighboring land owner(s). This document will disclose what the easement it for, list the restriction from item
3 above, and provide a statement that the property owner understands this and intends not only to allow the
easement, but will allow the easement to be written on his property's deed.
8. Successful use of groundwater easements will result in a conditional approval by the Department of
Environmental Protection.As discussed in item 4,the condition is based upon the recording of the easement
on the deed(s) at the appropriate county courthouse.
Please letmeknowifyouhaveanyotherquestions
Regards,
Zach Richard  Environmental Trainee
DepartmentofEnvironmentalProtection
Southcentral Regional Office
909ElmertonAve|Harrisburg,PA17110
Phone:717.705.4759/Fax:717.705.4760
From:ScotMcCaffrey<ScotM@sdei.net>
Sent: Tuesday, June 2, 2020 9:23 AM
To:Richard, Zach<zrichard@pa.gov>
Cc:PhilipAshear<p.ashear@sdei.net>
Subject:[External] Maidencreek Township, Berks County; David KopferModulePlan
ATTENTiON: This email message is from an external sender.Do not open links or attachments from unknown sources. To
report suspicious email, forward the message as an attachment to CWOPA_SPAM@pa.gov.
Zach,
I am currently reviewing the component 2 for this subdivision. Soil testing was conducted along Pleasant Hill Road,
Fleetwood, Pa. on March 5th, 2020.
The applicant had a hydrostudycompleted where a certainamount ofacreage was recommended to accommodate
nitrates. This isn't something that I normally get into but the township engineer wanted me to check with DEP to see
what requirements are necessary for the nitrate easement. He has many questions such as; Does the nitrate easement
need to be located downgradient from the proposed septic system locations? Does the easement need to be entirely on
the subdivided parcel? What purpose is the easement, to exclude additional septic systems or wells in this area?
if you have any guidance that I can provide to the township, it would be greatly appreciated. A sample draft drawing is
attached for your reference.
Thank you,
Scot McCaffrey
Sewage Enforcement Officer
1032JamesDrive,Leesport,PA19533

SUMMARY
IMPROVEMENTAGREEMENTSINVOICES
APPROVEDFORPAYMENT
MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS
JUNE 5,2020
DATEOFINVOICE/PAYEE
INVOICENO.
AMOUNT
1. GSP Properties, LLC
5/31/20Maidencreek Twp.-- Re:SDE, Inc.
100538
$417.55
AMOUNTDUE
$417.55
TOTALAMOUNTDUE
$417.55
I:/ProjectsMaidencreekTownship/mprovement Agreement Summaries/202016.5.20.doc

MAIDENCREEKTOWNSHIP
SEOACTIVITYREPORT
May,2020
Fee Paid to
Date By
SDE#
App.#
Applicant/Activity
Applicant
Billed/Paid
Chk #
281BlandonRoad
7/19/19-Replacement septic systemapplication.Testingwas
performedbypreviousSEO.Verifytest site.Send idemntification
formtoapplicant.Septic system permit cannotbeissued until the
19-0019-0479
Z176966
notarized indemnificationisreceivedbySEO.
9/4/19-Process applicationandverificationofpriortestingfornew
septic system.Reviewdesign/issuepermit
No update
724.00
Paid
1002
65TroxelRd.
19-0019-0480
Z203635
10/7/19-Reviewdesign/issuepermitfornewsystem
No update
Paid
585.00
122
1142PleasantHill Road-Ownerwantstosubdivideanotherlotoff
of the farm.
2/17/20-Schedule testing and notifyPADEP.
3/5/20-Probesforprimaryand replacement systemonnewlot
and replacement area for existing lot.
Subdivision
20-0019-0481
3/6/20-Conductpercolation testingforprimaryand replacement
system on new lot.
3/31/20-Completesoilreports,sendtoconsultant
6/2/20 -Rec incomplete planningmodule.Send letterto
consultant.
$1,608.00
Paid
114
1070 Maidencreek Road -The property didn't pass the real estate
inspection.Replacement septic system testing is necessary.
Z215216
20-0019-0482
3/17/20-Conduct soil probes.Dig/presoak perc holes.
3/18/20-Performpercolationtest.
No update
692.00
Paid
48TroxelRd-Septicsystemissharedwithneighborat56Troxel
Road.The systemismalfunctioning so replacement will be
necessaryforbothproperties.Eachhomewillapplyforapermit
fortheirown system instead of sharingone.
4/1/20-Probes
4/3/20-Observe perctest
Z2010423
20-0019-0483
4/9/20-Soil report
4/14/20-Processapplication
4/24/20-Reviewdesign/issue permit
5/12/20-Scarification inspectionPASSED
5/14/20TankinstallationinspectinPASSED
5/15/20-PressuretestPASSED
700+240m
5/18/20-FinalgradinginspectionPASSED
$940
Paid
56TroxelRd-Replacementsystem
4/1/20-Probes
4/7/20-Observeperc test
4/9/20-Soil report
ZZ136352
20-0019-0484
4/24/20-Reviewdesign/issuepermit
5/12/20ScarificationInspection
5/15/20PressureTestInspection
5/18/20 Final Grading Inspection
700+240=
$940
Paid
872ParkRd-Replacementsystem
5/13/20-Processapplication
Z210426
20-0019-0485
5/14/20-Observeprobes
5/15/20-Performpercolationtest
5/18/20 Soil reportand send to deigner
570.00
Paid
50873
185OrchardRoad-Replacementsystem
5/20/20Probestesting
20-0019-0456
Z207852
5/21/20PercTest
5/21/20soil&percreportwriteup
5/25/20 scanned soil&perc reportandemail to designer
$700.00
Paid
1264
MiscAdmin
Discuss Jojaz subdivision with Philip Ashear. Some soil test
20-0019-0300
General Work
sites are shown on the plan but SEO requires DEP planning
approval before the lots can be created.
Cc:T.Unger2copies
SEO Desk
projects/maidencreek/20-0019-0300/seoactivity

Archived from the Maidencreek Township website. Reproduced unaltered; not an official records repository.