Board of Supervisors
Engineer June Agenda — August 13, 2020
- Date
- August 13, 2020
- Type
- Agenda
- Year
- 2020
- File
- PDF · 10.6 MB
Document text
Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 3,976 words
MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS JULY9,2020 ENGINEER'SAGENDA SubdivisionReviewStatusChecklist Next Supervisors Meeting August 13, 2020 Subdivision/Zoning/LDP JoJaz Subdivision Prel./Final see SDE review Itr.Dated 7/1/20. Redner's Quickshop &Car WashPrel.Plansee SDE Itr.Dated 6/3/20. David Kopfer Sketch Plan for Record see SDE Itr.Dated 6/3/20. Gun Range regulations draft reviewed w/P.C. on 1/8/20 revisions/additions being made. Burning Ordinance regulation draft reviewed by P.C. on 7/1/2020 additional revisions/additions being made. Zimmerman storm water rain gardens inspected, Notice of Violation Itr. sent. Projects Street Projects 2020 Excelsior Drive & June Ave.BOS awarded: Contract"A"to Recon Construction in the amountof $206,038.00. Contract "B" to New Enterprise Stone & Lime Co. in the amount of $135,317.50 Storm waterremediation reviewed with Twp.; Road crewtoperform. Contracts signed and Notice to Proceed sent to contractors. Lutz Property E. Wesner Rd. storm water issue Reviewed Walnut Manor & Golden Manor Subdivision Plans (Plans start in1987).Thereisno storm water easementon plans.No notes for storm water system maintenance on plans. Subdivision ImprovementLOC/EscrowRelease See Attached SewageEnforcementOfficerActivityReport See Attached Page 1 of 1 I:(Projects\MaidencreekTownshipl20-0019-0100\Engineer'sAgendal07.09.20.docx Most Recent Letter Date 5/1/2020 7/1/2020 6/3/2020 Review 6/3/2020 Approval conditioned on SDE Comments No action taken by PC, No action taken by PC, No action taken by PC, resubmission needed resubmission needed resubmission needed review letter Approved BY BOS 05/14/20 MAIDENCREEK TOWNSHIP,BERKS COUNTY (may reflect more than one extension) Extension SUBDIVISION STATUS I:ProjectsIMaidencreek Township PCISubdivision StatuslSubdivision Status Checklists17.9.2020 -Copy 7/9/2020 Period Ends 07/16/20 09/01/20 09/01/20 90-Day Review 09/01/20 Review Period 04/17/20 06/03/20 06/03/20 Begins 90-Day 06/03/20 Plan Stage Prelm/Final Prelm Plan Prelm/Final Sketch Plan for Record Plan Plan PENDING PLANS: Redner's Quickshop and CarWash David Kopfer Subdivision CURRENT PLANS: Schick Dental Office Jojaz Subdivision Project Name APPROVED/ No. SYSTEMSDESIGN "A Passion for Engineering Excellence" SDE ENGINEERING, INC sdei.net July 1, 2020 DianeHollenbach,TownshipManager Maidencreek Township 1 Quarry Road Blandon,PA19510 Re: JoJazSubdivision Preliminary/Final Plan-Review#2 Ms.Hollenbach: Systems Design Engineering, Inc. is in receipt of a Preliminary/Final Plan entitled "JoJaz Subdivision." The site has two (2)access points to Maiden Creek Road and the subdivision would result in four (4) new individual lots. The southern access point is to be a local single access street and the northern access is via a proposed easement. The Plan was prepared by The Crossroads Group, LLC. The submission consisted of the following: Cover Sheet Undated Sheet 1 of 8 Subdivision Plan Dated5/6/2020,rev6/24/2020 Existing Features Plan Sheet 2 of 8 Dated5/6/2020,rev6/24/2020 Sheet 3 of 8 Demolition Plan Dated 5/6/2020, rev 6/24/2020 Sheet 4 of 8 RoadPlan&Profile Dated5/6/2020,rev6/24/2020 Sheet 5 of 8 E&SControlPlan Dated 5/6/2020, rev 6/24/2020 Sheet 6 of 8 Construction Details Dated 5/6/2020, rev 6/24/2020 Pre-Dev Drainage Plan Sheet7of8 Dated 5/6/2020, rev 6/24/2020 Sheet 8 of 8 Post-Dev Drainage Plan Dated5/6/2020,rev6/24/2020 BACKGROUND: The purpose of the plan is to subdivide an existing tract that is zoned Industrial. The tract is currently 24.57 acres in size. Four (4) new lots would be created, two (2) existing parcels adjacent to the proposed lots would remain unchanged and would have various easements in common. Lots are to be served by private individual wells and individual on-site sewage disposal. I:\Projects\MaidencreekTownshipPCl20-0024-0715JojazSubdivision\Prelim-FinalPlan/Prelim-FinalPlanReview#2.docx 1032 James Drive, Leesport, PA 19533.P: 610.916.8500.F: 610.916.8501 Schuylkill Haven, PAP: 570.385.5549 Boyertown, PA.P: 610.369.1319 MaidencreekTownshipPlanningCommission July 1, 2020 Re: JoJazSubdivision Page 2 of 12 Preliminary/FinalPlanReview#2 REVIEW: This letter presents comments on the second review of the submitted Preliminary/Final Plan. ZONING: The property is located in the I - Industrial Zoning District. The uses of the proposed parcels are not determined at this time. Each lot will require a Land Development Plan in order to develop a particularuse. Comments onotherissuesare presented below. 1.Per$220-48,PermittedUses The Applicant should list the intended and existing uses on the proposed parcels. o Addressed. Note 1 states that future uses will be commercial/industrial but exact uses are not known at this time. 2.Per $220-49,Area and Bulk Regulations The proposed lots to becreated appearto be compliant with area and bulk requirements. The subdivision plan does not show any new development on the proposed lots. Four (4)existing buildings would be removed. Any future development would need to comply with the requirements in Section Per$220-49aspart of a landdevelopment plan submission. o Acknowledged. No immediate action needed. 3.Per 220-79,Environmental lmpactAssessment Any subdivision or land development plan requires the submission of an Environmental Impact Assessment (ElA).An overall ElA should be submitted or ElA's will be required at the time of land development on each subdivided lot. oAddressed.The Applicant stated that ElA'swill be submitted for each individual lot at the time of land development. SALDO: SDE MaidencreekTownshipPlanningCommission July 1, 2020 Re: JoJazSubdivision Page 3 of 12 Preliminary/Final Plan Review #2 1.Per$190-15,PreliminaryPlanRequirements Per Subsection N(4), all lots should be numbered. oThe"residue lot" should be given a number even if it is to be non-buildable. Addressed. Non-building lot is labelled "Lot 4." The applicant should coordinate with DEP regarding a "planning Waiver" to be exempt from soil percolation testing. The applicant should coordinate with the Sewage Enforcement Officer. Per Subsection N(5), A statement of the intended use of all non-residential lots should be provided. o Addressed. Note 1 states that future uses will be commercial/industrial but exact uses are not known at this time. 2. Per §190-16, Information to Accompany a Preliminary Plan Per Subsection G(5), a deed must be prepared and submitted to the Township prior to recording. The deed shall include descriptions of the proposed right-of- wayand all easements. Partially addressed. The Applicant stated that deeds will be prepared for each lot closertofinal approval. 3.Per$190-17,FinalPlanRequirements The plans should be sealed by a Professional Engineer prior to Final Plan approval. Partially addressed.The Applicant stated that the plans will be sealed closerto final approval. Per Subsection A(12), clear sight triangles. o It appears that clear sight requirements are met. However, clear sight triangles should be added to the plan and clearly marked to satisfy this Final Plan requirement. The Applicant should also see Sight Distance requirements in Section $190-32.H. Addressed. Clear sight triangles were added to the plan. MaidencreekTownshipPlanningCommission July 1, 2020 Re: JoJazSubdivision Page 4 of 12 Preliminary/FinalPlan Review#2 4.Per$190-31,lmprovementSpecifications Per Subsection A, the applicant shall submit a Subdivision Improvements Agreement to the satisfaction of the PlanningCommission and Board of 5.Per $190-32,Streets Per Subsection A(5), Private street are prohibited unless they meet the Township's design standards. The proposed street meets the Township's width and cartway standards; however, the cartway width may need to be increased per the comment below. Addressed. Proposed cartway width has been widened to a minimumof30'toamaximumof36". Per Subsection B(3), the Township may require greater cartway and right-of-way widths if deemed necessary. The Township should determine the need for additional cartway due to truck turning radii. It appears trucks would need to use the edge of the cartway. Addressed.Proposed cartwaywidthhasbeenwidened. Per Subsection F(1), vertical curves along local access roads shall have a sight distance of at least 200 feet. The proposed road should be amended to achieve a sight distance of at least 200 feet. Addressed.A minimum 200'sight distance is provided. Per Subsection G(6), curb radii at intersections involving local access road shall be at least twenty (20) feet. Radius labels should be added to the plan and should demonstrate a minimum compliance with the 20-foot requirement. SDE MaidencreekTownshipPlanning Commission July 1, 2020 Re: JoJazSubdivision Page5of 12 Preliminary/Final Plan Review#2 Addressed. Radii added to the plan. Per Subsection I(2), in no case shall a public single-access street be the sole means of vehicular access to a non-residential use. O A waiver is being requested to this section. Per Subsection L(3), curbs and sidewalks shall be provided in accordance with Section §186. OA waiveris being requestedto this section. Per Subsection L(5), Streetlights may be required by the Board of Supervisors. If required, the streetlight plan shall be included with any Preliminary Plan or Final Plan submittal and shall be approved by mutual agreement between the Township, developer, and any appropriate public utility; a utility easement would also be required for maintenance. o The applicant requests that the necessity of street lights be determined at the time of land development on the subdivided lots. A note should beadded to theplan stating when/if streetlighting will be provided and included in the shared Maintenance Agreement. 6.Per$190-39,Soil PercolationTestRequirements Soil percolation tests are required for all subdivisions where on-site sewage is provided. The Applicant should coordinate percolation test requirements with the Sewage Enforcement Officer, especially as it relates to any requirements on the proposed non-building lot. A waiver is being requested to this section. We do not believe the Planning Commission has the authority to grant a waiver to this section because it is required by the PA DEP. 7. Boundaries between Proposed Lot 1, Proposed Lot 4 and the proposed right-of-way are unclear. The plan should be updated to clearly show the boundaries of each parcel and/or center line of the proposed right-of-way. Maidencreek Township Planning Commission July1,2020 Re: JoJazSubdivision Page 6 of 12 Preliminary/FinalPlanReview#2 8. Paving details and cross sections should be provided to clarify the shaded areas provided on Sheet 3. STORMWATERMANAGEMENT: 1. Per 182-11, Erosion and Sediment Control -- The Erosion & Sediment Control Plan should be submitted to the Berks County Conservation District for review and approval. A copy of theapproval letterand NPDEs Permit (if required)should be submitted to the Township priorto Final Plan approval. 2.Per s182-13.B,Groundwater Recharge --We have the following comments on the rechargedesigncomputations: A. The CN used in the recharge volume equation should represent the existing pervious area being converted to impervious cover. B. The Impervious Area should be the area of new impervious cover. C. Documentation for the O.65 in/hr infiltration rate should be provided in the report. A minimum safety factor of 2 should be applied to test rates to establish the design rate. Dewatering time computations should be provided for Trench A. D. The infiltration volume calculations for Trench A assume a fixed infiltration rate for a 36-hr period. The Scs hydrograph computations do not support this assumption. Assuming the trench will dewater in the required 96 hours, the storage volume provided behind the 2' "core" berms will provide the required recharge and water quality volume. Dewatering time computations should be provided. 3.Per $182-15, Streambank Erosion Requirements-Computations and rate control measures should be provided to reduce the post-development 2-yr 24-hr ScS storm runoff to the 1-yr pre-development rate. Revisions to the submitted computations are required to show compliance with this section. 4. Per s182-17.D.(1), Design Criteria for Stormwater Management and Conveyance BMPs - Design computations for Swale zo1 should be provided to support the information provided in Worksheet #11. In addition, the source of the Manning's n value of o.030 should be provided. The entire drainage area to Swale zo1 should be shown on the plan. MaidencreekTownshipPlanningCommission July 1, 2020 Re: JoJazSubdivision Page 7 of 12 Preliminary/Final PlanReview#2 Computations for the swale around the northwest portion of the cul-de-sac should be provided. 9. Per s182-21.B, Exemptions - The project meets the requirements for an exemption from the drainage plan requirements. The total new impervious area of 11, 526 SF (allowable area is 15,000SF),isreferencedinNote 10on Sheet 1. 10. Per §182-21.C.(3), Exemptions - The project is located in RAWA's Source Water Protection Area. The Applicant's engineer has indicated they have contacted RAWA to discuss possible issues with the project. Written acknowledgement from RAWA that the proposed Stormwater management BMPs meet their requirements should be submitted to the Township. 11. Per 182-30, Performance Guarantee --A financial guarantee should be provided for the proposed stormwater management controls prior to Final Plan approval. A certified construction cost estimate should be submitted for the proposed stormwater managementBMPs. 12.Per§182-33.B,StormwaterManagementEasements-Portionsof Swale Z01 will be located outside the 53' access easement for the private road. The temporary grading easement in this area should be revised to note that it is also a permanent storm drainage easement. 13. Per §182-32 and 182-34, Operations and Maintenance Agreement for Privately Owned Stormwater Controls and BMPs-Prior to Final Plan approval, the Applicant should execute the maintenance agreement contained in Appendix A. 14. Per $182-35, Recording of Approved Stormwater Control and BMP O&M Plan and Related Agreements -A note should be added to Sheet 1 requiring recording of the BMP O&M Plan within 15 days of plan approval by the Board of Supervisors. MISCELLANEOUS STORMWATER MANAGEMENT PLANAND REPORT COMMENTS: 1. A driveway culvert should be provided under the access to the Township grass clippings drop-off site. 2. The runoff computations include areas of Hydrologic Soil Group D soils; however, the Soil Survey report indicates there are no HSG D soils within the drainage areas being evaluated. SDE MaidencreekTownship Planning Commission July 1, 2020 Re: JoJazSubdivision Page 8 of 12 Preliminary/Final PlanReview#2 3. The plan should show how the Swale zo1flows will be dispersed in a non-erosive manner atthe swaleoutfall to existinggrade. 4.The plans show Swale z01 terminating approximately 250'before Stone Trench A does. The design assumes the roadway runoff will be directed into the stone trench by ponding water behind check dams in the roadside swale. The design should ensure the roadway runoff will be directed into TrenchA. 5. The routing computations assume the only drainage area contributing to Trench A is from the roadway corridor; however, the entire Swale zo1 drainage area will contribute flow to Trench A. The routing computations should be revised to include the actual contributing area to the roadside swale. 6.It is unclear what the 7.75"diameter orifice at invert322.50 represents in the stage/discharge parameters. 7. While not utilized, it is unclear what the 2.5'rectangular weir represents since no flow exits Stone Trench A except through the 10"PvC pipe and exfiltration (possibly minimal flow out of cO A902 if there is a slotted cap). 8. A clay"core" should be provided below the lowest cleanout to prevent piping of the stored wateralongthe 1o"PvCpipe. 9. R-4 riprap is too large to be used for the 12" high check dams since the maximum rock size in this material is 12", 10. The starting STAs for Swale Z01 and Stone Trench A, and the STAs for CO A901 and A902 should be noted. 11. The plans should clarify the future status of the existing guard shack. Presently Trench A conflicts with the guard shack on most of the sheets. 12. In order to clarify the impervious coverage assumptions for future lot development designs, the Existing Impervious Coverage to Remain note should be expanded to reference the Demolition Plan. 13. Many of the Maintenance Notes on Sheet 4 should be revised to specifically address only the grassed swale and stone trench proposed for this project. References to plant replacement, pruning, naturalized swales and rain gardens should be deleted. In addition, the mowing requirements should be revised to reflect the Manning's coefficient used for theSwaleZ01 design SDE MaidencreekTownshipPlanningCommission July 1, 2020 Re: JoJazSubdivision Page9of12 Preliminary/FinalPlanReview#2 CONSTRUCTION DETAILS: 1. The following revisions should be made to the Typical Proposed Interior Road Section: A.The centerline crown should be eliminated. B. Dimension the width of the grass strip along the edge of paving C. Specify the aggregate size and PG type for the Superpave materials. D. A Superpave designation should be noted for the base course. E. The minimum thickness for a 19.Omm Superpave binder course is 2.5" 2. The Stone Trench A detail appears to indicate that the Class 1 geotextile will be exposed on the surface of the trench. The geotextile will degrade over time due to exposure to sunlight, and will most likely be damaged overtime bymowing equipment. BERKS COUNTY PLANNING COMMISSION COMMENTS: 1. The following are stand-out comments from the BCPC letter dated May 19, 2020. There are twelve (12) comments in total, not all are mentioned here. The Applicant should be aware of all BCPC comments; the May 19, 2020 letter states that both JoJaz Properties, LLC and Crossroads, LLC received carboncopyoftheBCPCreviewletter. 2. HighlightedBCPCComments AccessEasement 2shouldbereviewedbytheTownshipSolicitorfor appropriateness and the easement should be recorded with the Final Plan. i.Acknowledged.The applicant stated solicitor comments will be incorporated and recorded with the final plan. Special consideration should be given to Peter's Creek, which is designated as Exceptional Value (EV)waters.It is locatedapproximately6oofeet southofthe subject site on land owned by the City of Reading Water Bureau. MaidencreekTownshipPlanning Commission July 1, 2020 Re: JoJazSubdivision Page10of 12 Preliminary/Final Plan Review #2 i.Acknowledged.The Erosion and Sediment Control narrative should be submitted to the Berks County Conservation District for review and approval. An approval letter from BCCD should be provided upon receipt. The site is within the surface water source area of the Reading Area Water Authority. BCPC recommends that the developer contact the Authority for more information. i.Acknowledged. The applicant stated they are in contact with the Authority. MISCELLANEOUS: 1. Traffic a. Trucks are prohibited on Evansville Road. Trucks will be required to use Maiden Creek Road to Route73and to Pleasant Hill Road. b.The proposed road construction at Maiden Creek Road requires a PennDOT Highway Occupancy Permit. If there is an HOP for the existing driveway, a copy shouldbeprovidedbytheApplicant. In addition,Recording Note8 should be removed or revised. Addressed.HOP has been provided and Note 8 has been revised. c.The previous submission included a full turning radius for vehicles entering and exiting onto Maiden Creek Road. The current submission shows larger vehicles but does not show full turn radii. i.It appears the turn radii may be too small for the larger vehicies. Full turning radii should be provided. Any construction to increase the radii will requirenewPennDOTHOPapproval. 2. On-lot sewage is proposed. a. A public sewer system should be investigated to determine feasibilityto include Molitownareaand MaidenCreek Road users. SDE MaidencreekTownshipPlanningCommission July 1, 2020 Re: JoJazSubdivision Page11of12 Preliminary/FinalPlanReview#2 3.The plan should clarify the limits of the existing pavement to be removed in the area of the proposed cul-de-sac where the existing driveway for Custom Milling & Consulting, inc. will tie into the new road. a.Addressed. Clarification has been added to the Sheet 3. 4. Maidencreek Township currently maintains a Township residential grass clippings drop-off location on thenorthwest corner of the propertyalong Maiden Creek Road. Thefuture status of this facility should be noted. a.Acknowledged.Note added to Sheet 1. 5. The proposed road is to remain private; a Maintenance agreement for the proposed road should be submitted by the Applicant and commented on by Township Solicitor. a.Partially addressed. The applicant stated that a Maintenance Agreement would be submitted closer to final approval. WAIVERREQUESTS: Waivers to three (3)sections are requested via a letter dated June 24, 2020. 1.Waiverto Section S190-32.1.2 regarding a public single access street to be the sole vehicular access to a nonresidential use. 2.Waiver to Section 190-32.L.3 regarding the requirement for curbs and sidewalks. 3. Waiver to Section $190-39 regarding soils percolation tests for all subdivisions and land developments where on-lot sewage disposal is proposed. a. The Planning Commission should determine the feasibility and necessity of the first two (2) above requests and make recommendations accordingly. b. The Planning Commission cannot grant a waiver with regard to soil percolation tests as this is a DEP regulation. SDE MaidencreekTownshipPlanningCommission July 1, 2020 Re: JoJazSubdivision Page 12 of 12 Preliminary/FinalPlanReview#2 If you should have any questions or comments, please do not hesitate to contact our office. Sincerely, SYSTEMSDESIGNENGINEERING,INC. Philip J.Ashear Township Planning Consuitant Cc: MaidencreekTownshipPlanningCommissioners DianeHollenbach/TownshipManager EugeneOrlando,Jr./TownshipSolicitor TheCrossroads Group SDEFile#20-0024-0715 SYSTEMSDESIGN "APassionforEngineering Excellence" SDE ENGINEERING,INC sdei.net July2,2020 CERTIFIED MAIL Return Receipt Requested Scott W.Zimmerman 70192970000191695208 451HochRoad Blandon,PA19510 Re: StormWaterPermit/RainGardenMaintenance NOTICEOFVIOLATION Dear Mr.Zimmerman: Please be advised that in accordance with your storm water permit, you as property owner, are responsible for the perpetual maintenance of the storm water facilities located on your property. Upon inspection of the storm water facilities, by this office, on behalf of Maidencreek Township, it appears that rain gardens one (1) through three (3) are not being maintained and may being altered. Please find attached the Drainage Plan Dwg.D1o1 as prepared by Berks Surveying & Engineering Inc. and approved foryourproperty'sstormwaterpermit. Please contact this office withinten (10)daysofreceipt of thisletter. Regards, Systems Design Engineering,Inc. Thomas S. Unger, P.E. Enclosure Cc: MaidencreekTownship File20-0019-0700 1032James Drive, Leesport,PA19533.P:610.916.8500.F:610.916.8501 /z Schuylkill Haven, PA.P:570.385.5549 Boyertown, PA P: 610.369.1319 Berks Surveying & Engineering, Inc. D101 Certiricatlon Aasn Gursens e83 DRNNAEPLAN _FNGIMEERED_SOIL/ELANIING_RETAIL, 16953716 Project No. ZIMMERMAN HO 11-9-18 OWNERS/DEVELOPERS .ecaticn RADER Scott w. RAIN GARDEN 3 DETAIL 100d ckeye_Pipsline roperty boundary Existing_contour ontof LEGEND UT Line ZIMMERMAN PROPOSED RESIDENCE noda. DRAINAGE PLAN SERIAL$20182472141 RAIN GARDEN 2 DETAIL -1776 GRASS GRAPHIC SCALE RAIN GARDEN 1 DETAIL ASTAD T'I'N PAVEDDRIVEWAYCROSSSECTON STE NO 000 K.T.E. SUMMARY IMIPROVEMENTAGREEMENTSINVOICES APPROVEDFORPAYMENT MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS JULY 9, 2020 DATEOFINVOICE/PAYEE INVOICE NO. AMOUNT 1. GSP Properties, LLC 6/30/20 Maidencreek Twp.-Re: SDE, Inc. $426.26 AMOUNTDUE $426.26 TOTALAMOUNTDUE $426.26 I:/Projects/MaidencreekTownshiplImpr0vementAgreementSummaries/2020107.09.20.doc MAIDENCREEKTOWNSHIP SEOACTIVITYREPORT June, 2020 Fee Paidto Date By SDE# App.# AoplicantActivity Applicant Billed/Paid Chk# 281Blandon Road 7/19/19 -Replacement septic systemapplication.Testing was performedbypreviousSEO.Verifytestsite.Send idemntification formto applicant.Septic systempermit cannotbe issueduntil the 19-0019-0479 Z176966 notarized indemnification is receivedbySEO. 9/4/19-Process application and verification of priortesting for new septicsystem.Reviewdesign/issuepermit No update $724.00 Paid 1002 65 Troxel Rd. Z203635 19-0019-0480 10/7/19-Review design/issue permitfor new system No update $585.00 Paid 122 1142PleasantHill Road-Ownerwantstosubdivideanotherlotoff of the farm. 2/17/20 -Schedule testing and notify PADEP. 3/5/20 -Probes for primary and replacement system on new lot and replacement areaforexistinglot. 3/6/20-Conduct percolation testing forprimaryandreplacement 20-0019-0481 Subdivision system on new lot. 3/31/20-Completesoil reports,sendtoconsultant 6/2/20 -Rec incomplete planning module.Send letterto consultant. 6/9/20-Communications wiPhil AshearandPADEPre:nitrate $1,608.00 Paid easementrequirements. 114 1070MaidencreekRoad-Thepropertydidn't pass the real estate inspection.Replacement septic systemtesting is necessary. 20-0019-0482 Z215216 3/17/20-Conduct soil probes.Dig/presoakpercholes. 3/18/20-Performpercolationtest. No update $692.00 Paid 48TroxelRd-Septicsystemissharedwithneighborat56Troxel Road. The system is malfunctioning so replacement will be necessary for both properties.Each home will applyfor a permit for their own system instead of sharing one. 4/1/20-Probes 4/3/20-Observeperctest 4/9/20-Soil report 20-0019-0483 Z2010423 4/14/20-Processapplication 4/24/20-Reviewdesign/issuepermit 5/12/20-ScarificationinspectionPASSED 5/14/20-Tank installation inspectinPASSED 5/15/20-PressuretestPASSED 5/18/20-Final grading inspectionPASSED 6/2120 -Rec. activated warranty registration for treatment 700+240= $940 system. Paid 56TroxelRd-Replacementsystem 4/1/20-Probes 4/7120 -Observe perc test 4/9/20-Soil report 4/24/20-Reviewdesign/issuepermit 20-0019-0484 ZZ136352 5/12/20ScarificationInspection 5/15/20PressureTestInspection 5/18/20Final GradingInspection 6/2/20 -Rec.activated warrantyregistration for treatment 700+240= $940 system. Paid 872ParkRd-Replacementsystem 5/13/20-Processapplication 5/14/20-Observeprobes Z210426 20-0019-0485 5/15/20-Perform percolation test 5/18/20 Soil report and send to deigner 6/11/20-Reviewdesign.Fees duebeforepermitcanbe $570.00 Paid issued. 50873 185OrchardRoad-Replacementsystem 5/20/20Probes testing 20-0019-0456 Z207852 5/21/20PercTest 5/21/20 soil &perc report write up 5/25/20 scanned soil &perc reportand email to designer $700.00 Paid 1264 Misc Admin 6/1/20 -Discuss Jojaz subdivision with Philip Ashear. Some soil test sites are shown on the plan but SEO requires DEP 20-0019-0300 General Work planning approval before the lots can be created. 6/11/20-Communications wlapplicant re:permitting requirements for a replacement system. Cc:T.Unger 2 copies SEO Desk projects/maidencreek/20-0019-0300/seoactivity MAIDENCREEKTOWNSHIP SEOACTIVITYREPORT June,2020 Fee Paid to Date By SDE# ADD.# Applicant/Activity Billed/Paid Applicant Chk # 281BlandonRoad 7/19/19-Replacementsepticsystemapplication.Testingwas performed byprevious SEO.Verifytestsite.Send idemntification 19-0019-0479 Z176966 formtoapplicant.Septicsystempermitcannotbeissueduntifthe notarized indemnification is received by SEO. 9/4/19 -Process application and verification of prior testing for new septic system.Reviewdesign/issuepermit No update $724.00 Paid 1002 65Troxel Rd. Z203635 19-0019-0480 10/7/19-Review design/issue permit for new system No update $585.00 Paid 122 1142Pleasant Hill Road-Ownerwantstosubdivideanotherlot off of the farm. 2/17/20-Schedule testing and notify PADEP. 3/5/20 -Probes for primary and replacement system on new lot and replacement areaforexisting lot. 3/6/20 -Conduct percolation testingfor primary and replacement 20-0019-0481 Subdivision system on newlot. 3/31/20-Completesoil reports,send toconsultant 6/2/20-Rec incomplete planning module.Send letter to consultant. 6/9/20-Communicationsw/PhilAshearandPADEPre:nitrate $1,608.00 easementreguirements. Paid 114 1070 Maidencreek Road-The property didn't pass the real estate inspection. Replacement septic system testing is necessary. 20-0019-0482 Z215216 3/17/20-Conductsoil probes.Dig/presoakpercholes. 3/18/20 -Perform percolation test. No update $692.00 Paid 48TroxelRd-Septicsystemissharedwithneighborat56Troxel Road.Thesystem ismalfunctioning soreplacementwill be necessaryforbothproperties.Eachhomewill applyforapermit for their own system instead of sharing one. 4/1/20-Probes 4/3/20 -Observe perc test 4/9/20-Soil report 20-0019-0483 Z2010423 4/14/20-Process application 4/24/20-Reviewdesign/issuepermit 5/12/20-Scarification inspectionPASSED 5/14/20-Tank installation inspectinPASSED 5/15/20-PressuretestPASSED 5/18/20-Final grading inspection PASSED 6/2/20 -Rec.activated warranty registration for treatment 700+240= $940 system. Paid 56TroxelRd-Replacementsystem 4/1/20 -Probes 4/7/20 - Observe perc test 4/9/20 -Soil report 4/24/20-Reviewdesign/issuepermit 20-0019-0484 ZZ136352 5/12/20ScarificationInspection 5/15/20PressureTestInspection 5/18/20Final Grading Inspection 612/20 -Rec. activated warranty registration for treatment 700+240= $940 system. Paid 872ParkRd-Replacementsystem 5/13/20-Processapplication 5/14/20-Observeprobes Z210426 20-0019-0485 5/15/20-Performpercolationtest 5/18/20Soil reportandsendtodeigner 6/11/20-Review design.Fees due beforepermit can be $570.00 issued. Paid 50873 185OrchardRoad-Replacementsystem 5/20/20Probestesting 20-0019-0456 Z207852 5/21/20PercTest 5/21/20soil&percreportwriteup 5/25/20 scanned soil &perc report andemail to designer $700.00 Paid 1264 Misc Admin 6/1/20-Discuss Jojaz subdivision withPhilipAshear.Some 20-0019-0300 General Work soiltestsitesareshownontheplanbutSEOrequiresDEp planning approval before the lots can be created. 6/11/20-Communicationswlapplicantre:permitting requirements for a replacement system. Ce:T.Unger 2 copies SEO Desk projects/maidencreek/20-0019-0300/seoactivity