MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS
JULY9,2020
ENGINEER'SAGENDA
SubdivisionReviewStatusChecklist
Next Supervisors Meeting August 13, 2020
Subdivision/Zoning/LDP
JoJaz Subdivision Prel./Final see SDE review Itr.Dated 7/1/20.
Redner's Quickshop &Car WashPrel.Plansee SDE Itr.Dated 6/3/20.
David Kopfer Sketch Plan for Record see SDE Itr.Dated 6/3/20.
Gun Range regulations draft reviewed w/P.C. on 1/8/20 revisions/additions
being made.
Burning Ordinance regulation draft reviewed by P.C. on 7/1/2020 additional
revisions/additions being made.
Zimmerman storm water rain gardens inspected, Notice of Violation Itr. sent.
Projects
Street Projects 2020
Excelsior Drive & June Ave.BOS awarded:
Contract"A"to Recon Construction in the amountof
$206,038.00.
Contract "B" to New Enterprise Stone & Lime Co. in the amount of
$135,317.50
Storm waterremediation reviewed with Twp.; Road crewtoperform.
Contracts signed and Notice to Proceed sent to contractors.
Lutz Property E. Wesner Rd. storm water issue
Reviewed Walnut Manor & Golden Manor Subdivision Plans (Plans start
in1987).Thereisno storm water easementon plans.No notes for
storm water system maintenance on plans.
Subdivision ImprovementLOC/EscrowRelease
 See Attached
SewageEnforcementOfficerActivityReport
See Attached
Page 1 of 1
I:(Projects\MaidencreekTownshipl20-0019-0100\Engineer'sAgendal07.09.20.docx

Most Recent
Letter Date
5/1/2020
7/1/2020
6/3/2020
Review
6/3/2020
Approval conditioned on SDE
Comments
No action taken by PC,
No action taken by PC,
No action taken by PC,
resubmission needed
resubmission needed
resubmission needed
review letter
Approved
BY BOS
05/14/20
MAIDENCREEK TOWNSHIP,BERKS COUNTY
(may reflect more
than one extension)
Extension
SUBDIVISION STATUS
I:ProjectsIMaidencreek Township PCISubdivision StatuslSubdivision Status Checklists17.9.2020 -Copy
7/9/2020
Period Ends
07/16/20
09/01/20
09/01/20
90-Day
Review
09/01/20
Review Period
04/17/20
06/03/20
06/03/20
Begins
90-Day
06/03/20
Plan Stage
Prelm/Final
Prelm Plan
Prelm/Final
Sketch Plan
for Record
Plan
Plan
PENDING PLANS:
Redner's Quickshop and CarWash
David Kopfer Subdivision
CURRENT PLANS:
Schick Dental Office
Jojaz Subdivision
Project Name
APPROVED/
No.

SYSTEMSDESIGN
"A Passion for Engineering Excellence"
SDE
ENGINEERING, INC
sdei.net
July 1, 2020
DianeHollenbach,TownshipManager
Maidencreek Township
1 Quarry Road
Blandon,PA19510
Re:
JoJazSubdivision
Preliminary/Final Plan-Review#2
Ms.Hollenbach:
Systems Design Engineering, Inc. is in receipt of a Preliminary/Final Plan entitled "JoJaz
Subdivision." The site has two (2)access points to Maiden Creek Road and the subdivision would
result in four (4) new individual lots. The southern access point is to be a local single access
street and the northern access is via a proposed easement. The Plan was prepared by The
Crossroads Group, LLC. The submission consisted of the following:
Cover Sheet
Undated
Sheet 1 of 8
Subdivision Plan
Dated5/6/2020,rev6/24/2020
Existing Features Plan
Sheet 2 of 8
Dated5/6/2020,rev6/24/2020
Sheet 3 of 8
Demolition Plan
Dated 5/6/2020, rev 6/24/2020
Sheet 4 of 8
RoadPlan&Profile
Dated5/6/2020,rev6/24/2020
Sheet 5 of 8
E&SControlPlan
Dated 5/6/2020, rev 6/24/2020
Sheet 6 of 8
Construction Details
Dated 5/6/2020, rev 6/24/2020
Pre-Dev Drainage Plan
Sheet7of8
Dated 5/6/2020, rev 6/24/2020
Sheet 8 of 8
Post-Dev Drainage Plan
Dated5/6/2020,rev6/24/2020
BACKGROUND:
The purpose of the plan is to subdivide an existing tract that is zoned Industrial. The tract is
currently 24.57 acres in size. Four (4) new lots would be created, two (2) existing parcels
adjacent to the proposed lots would remain unchanged and would have various easements in
common. Lots are to be served by private individual wells and individual on-site sewage disposal.
I:\Projects\MaidencreekTownshipPCl20-0024-0715JojazSubdivision\Prelim-FinalPlan/Prelim-FinalPlanReview#2.docx
1032 James Drive, Leesport, PA 19533.P: 610.916.8500.F: 610.916.8501
Schuylkill Haven, PAP: 570.385.5549
Boyertown, PA.P: 610.369.1319

MaidencreekTownshipPlanningCommission
July 1, 2020
Re:
JoJazSubdivision
Page 2 of 12
Preliminary/FinalPlanReview#2
REVIEW:
This letter presents comments on the second review of the submitted Preliminary/Final Plan.
ZONING:
The property is located in the I - Industrial Zoning District. The uses of the proposed parcels are
not determined at this time. Each lot will require a Land Development Plan in order to develop a
particularuse.
Comments onotherissuesare presented below.
1.Per$220-48,PermittedUses
The Applicant should list the intended and existing uses on the proposed parcels.
o Addressed. Note 1 states that future uses will be commercial/industrial
but exact uses are not known at this time.
2.Per $220-49,Area and Bulk Regulations
The proposed lots to becreated appearto be compliant with area and bulk
requirements. The subdivision plan does not show any new development on the
proposed lots. Four (4)existing buildings would be removed.
Any future development would need to comply with the requirements in Section
Per$220-49aspart of a landdevelopment plan submission.
o Acknowledged. No immediate action needed.
3.Per 220-79,Environmental lmpactAssessment
Any subdivision or land development plan requires the submission of an
Environmental Impact Assessment (ElA).An overall ElA should be submitted or
ElA's will be required at the time of land development on each subdivided lot.
oAddressed.The Applicant stated that ElA'swill be submitted for each
individual lot at the time of land development.
SALDO:
SDE

MaidencreekTownshipPlanningCommission
July 1, 2020
Re:
JoJazSubdivision
Page 3 of 12
Preliminary/Final Plan Review #2
1.Per$190-15,PreliminaryPlanRequirements
Per Subsection N(4), all lots should be numbered.
oThe"residue lot" should be given a number even if it is to be non-buildable.
Addressed. Non-building lot is labelled "Lot 4."
The applicant should coordinate with DEP regarding a "planning
Waiver" to be exempt from soil percolation testing. The applicant
should coordinate with the Sewage Enforcement Officer.
Per Subsection N(5), A statement of the intended use of all non-residential lots
should be provided.
o Addressed. Note 1 states that future uses will be commercial/industrial
but exact uses are not known at this time.
2. Per §190-16, Information to Accompany a Preliminary Plan
Per Subsection G(5), a deed must be prepared and submitted to the Township
prior to recording. The deed shall include descriptions of the proposed right-of-
wayand all easements.
Partially addressed. The Applicant stated that deeds will be prepared for
each lot closertofinal approval.
3.Per$190-17,FinalPlanRequirements
The plans should be sealed by a Professional Engineer prior to Final Plan approval.
Partially addressed.The Applicant stated that the plans will be sealed
closerto final approval.
Per Subsection A(12), clear sight triangles.
o It appears that clear sight requirements are met. However, clear sight
triangles should be added to the plan and clearly marked to satisfy this
Final Plan requirement.
The Applicant should also see Sight Distance requirements in
Section $190-32.H.
Addressed. Clear sight triangles were added to the plan.

MaidencreekTownshipPlanningCommission
July 1, 2020
Re:
JoJazSubdivision
Page 4 of 12
Preliminary/FinalPlan Review#2
4.Per$190-31,lmprovementSpecifications
Per Subsection A, the applicant shall submit a Subdivision Improvements
Agreement to the satisfaction of the PlanningCommission and Board of
5.Per $190-32,Streets
Per Subsection A(5), Private street are prohibited unless they meet the Township's
design standards.
The proposed street meets the Township's width and cartway standards;
however, the cartway width may need to be increased per the comment
below.
Addressed. Proposed cartway width has been widened to a
minimumof30'toamaximumof36".
Per Subsection B(3), the Township may require greater cartway and right-of-way
widths if deemed necessary.
The Township should determine the need for additional cartway due to
truck turning radii. It appears trucks would need to use the edge of the
cartway.
Addressed.Proposed cartwaywidthhasbeenwidened.
Per Subsection F(1), vertical curves along local access roads shall have a sight
distance of at least 200 feet.
The proposed road should be amended to achieve a sight distance of at
least 200 feet.
Addressed.A minimum 200'sight distance is provided.
Per Subsection G(6), curb radii at intersections involving local access road shall be
at least twenty (20) feet.
Radius labels should be added to the plan and should demonstrate a
minimum compliance with the 20-foot requirement.
SDE

MaidencreekTownshipPlanning Commission
July 1, 2020
Re:
JoJazSubdivision
Page5of 12
Preliminary/Final Plan Review#2
Addressed. Radii added to the plan.
Per Subsection I(2), in no case shall a public single-access street be the sole means
of vehicular access to a non-residential use.
O A waiver is being requested to this section.
Per Subsection L(3), curbs and sidewalks shall be provided in accordance with
Section §186.
OA waiveris being requestedto this section.
Per Subsection L(5), Streetlights may be required by the Board of Supervisors. If
required, the streetlight plan shall be included with any Preliminary Plan or Final
Plan submittal and shall be approved by mutual agreement between the
Township, developer, and any appropriate public utility; a utility easement would
also be required for maintenance.
o The applicant requests that the necessity of street lights be determined at
the time of land development on the subdivided lots.
A note should beadded to theplan stating when/if streetlighting will be
provided and included in the shared Maintenance Agreement.
6.Per$190-39,Soil PercolationTestRequirements
Soil percolation tests are required for all subdivisions where on-site sewage is
provided.
The Applicant should coordinate percolation test requirements with the
Sewage Enforcement Officer, especially as it relates to any requirements on
the proposed non-building lot.
A waiver is being requested to this section.
We do not believe the Planning Commission has the authority to
grant a waiver to this section because it is required by the PA DEP.
7. Boundaries between Proposed Lot 1, Proposed Lot 4 and the proposed right-of-way are
unclear. The plan should be updated to clearly show the boundaries of each parcel
and/or center line of the proposed right-of-way.

Maidencreek Township Planning Commission
July1,2020
Re:
JoJazSubdivision
Page 6 of 12
Preliminary/FinalPlanReview#2
8. Paving details and cross sections should be provided to clarify the shaded areas provided
on Sheet 3.
STORMWATERMANAGEMENT:
1. Per 182-11, Erosion and Sediment Control -- The Erosion & Sediment Control Plan should
be submitted to the Berks County Conservation District for review and approval. A copy
of theapproval letterand NPDEs Permit (if required)should be submitted to the
Township priorto Final Plan approval.
2.Per s182-13.B,Groundwater Recharge --We have the following comments on the
rechargedesigncomputations:
A. The CN used in the recharge volume equation should represent the existing
pervious area being converted to impervious cover.
B. The Impervious Area should be the area of new impervious cover.
C. Documentation for the O.65 in/hr infiltration rate should be provided in the report.
A minimum safety factor of 2 should be applied to test rates to establish the design
rate. Dewatering time computations should be provided for Trench A.
D. The infiltration volume calculations for Trench A assume a fixed infiltration rate for
a 36-hr period. The Scs hydrograph computations do not support this assumption.
Assuming the trench will dewater in the required 96 hours, the storage volume
provided behind the 2' "core" berms will provide the required recharge and water
quality volume. Dewatering time computations should be provided.
3.Per $182-15, Streambank Erosion Requirements-Computations and rate control
measures should be provided to reduce the post-development 2-yr 24-hr ScS storm
runoff to the 1-yr pre-development rate. Revisions to the submitted computations are
required to show compliance with this section.
4. Per s182-17.D.(1), Design Criteria for Stormwater Management and Conveyance BMPs -
Design computations for Swale zo1 should be provided to support the information
provided in Worksheet #11. In addition, the source of the Manning's n value of o.030
should be provided.
The entire drainage area to Swale zo1 should be shown on the plan.

MaidencreekTownshipPlanningCommission
July 1, 2020
Re:
JoJazSubdivision
Page 7 of 12
Preliminary/Final PlanReview#2
Computations for the swale around the northwest portion of the cul-de-sac should be
provided.
9. Per s182-21.B, Exemptions - The project meets the requirements for an exemption from
the drainage plan requirements. The total new impervious area of 11, 526 SF (allowable
area is 15,000SF),isreferencedinNote 10on Sheet 1.
10. Per §182-21.C.(3), Exemptions - The project is located in RAWA's Source Water Protection
Area. The Applicant's engineer has indicated they have contacted RAWA to discuss
possible issues with the project. Written acknowledgement from RAWA that the
proposed Stormwater management BMPs meet their requirements should be submitted
to the Township.
11. Per 182-30, Performance Guarantee --A financial guarantee should be provided for the
proposed stormwater management controls prior to Final Plan approval. A certified
construction cost estimate should be submitted for the proposed stormwater
managementBMPs.
12.Per§182-33.B,StormwaterManagementEasements-Portionsof Swale Z01 will be
located outside the 53' access easement for the private road. The temporary grading
easement in this area should be revised to note that it is also a permanent storm drainage
easement.
13. Per §182-32 and 182-34, Operations and Maintenance Agreement for Privately Owned
Stormwater Controls and BMPs-Prior to Final Plan approval, the Applicant should
execute the maintenance agreement contained in Appendix A.
14. Per $182-35, Recording of Approved Stormwater Control and BMP O&M Plan and Related
Agreements -A note should be added to Sheet 1 requiring recording of the BMP O&M
Plan within 15 days of plan approval by the Board of Supervisors.
MISCELLANEOUS STORMWATER MANAGEMENT PLANAND REPORT COMMENTS:
1. A driveway culvert should be provided under the access to the Township grass clippings
drop-off site.
2. The runoff computations include areas of Hydrologic Soil Group D soils; however, the Soil
Survey report indicates there are no HSG D soils within the drainage areas being
evaluated.
SDE

MaidencreekTownship Planning Commission
July 1, 2020
Re:
JoJazSubdivision
Page 8 of 12
Preliminary/Final PlanReview#2
3. The plan should show how the Swale zo1flows will be dispersed in a non-erosive manner
atthe swaleoutfall to existinggrade.
4.The plans show Swale z01 terminating approximately 250'before Stone Trench A does.
The design assumes the roadway runoff will be directed into the stone trench by ponding
water behind check dams in the roadside swale. The design should ensure the roadway
runoff will be directed into TrenchA.
5. The routing computations assume the only drainage area contributing to Trench A is from
the roadway corridor; however, the entire Swale zo1 drainage area will contribute flow to
Trench A. The routing computations should be revised to include the actual contributing
area to the roadside swale.
6.It is unclear what the 7.75"diameter orifice at invert322.50 represents in the
stage/discharge parameters.
7. While not utilized, it is unclear what the 2.5'rectangular weir represents since no flow
exits Stone Trench A except through the 10"PvC pipe and exfiltration (possibly minimal
flow out of cO A902 if there is a slotted cap).
8. A clay"core" should be provided below the lowest cleanout to prevent piping of the
stored wateralongthe 1o"PvCpipe.
9. R-4 riprap is too large to be used for the 12" high check dams since the maximum rock size
in this material is 12",
10. The starting STAs for Swale Z01 and Stone Trench A, and the STAs for CO A901 and A902
should be noted.
11. The plans should clarify the future status of the existing guard shack. Presently Trench A
conflicts with the guard shack on most of the sheets.
12. In order to clarify the impervious coverage assumptions for future lot development
designs, the Existing Impervious Coverage to Remain note should be expanded to
reference the Demolition Plan.
13. Many of the Maintenance Notes on Sheet 4 should be revised to specifically address only
the grassed swale and stone trench proposed for this project. References to plant
replacement, pruning, naturalized swales and rain gardens should be deleted. In addition,
the mowing requirements should be revised to reflect the Manning's coefficient used for
theSwaleZ01 design
SDE

MaidencreekTownshipPlanningCommission
July 1, 2020
Re:
JoJazSubdivision
Page9of12
Preliminary/FinalPlanReview#2
CONSTRUCTION DETAILS:
1. The following revisions should be made to the Typical Proposed Interior Road Section:
A.The centerline crown should be eliminated.
B. Dimension the width of the grass strip along the edge of paving
C. Specify the aggregate size and PG type for the Superpave materials.
D. A Superpave designation should be noted for the base course.
E. The minimum thickness for a 19.Omm Superpave binder course is 2.5"
2. The Stone Trench A detail appears to indicate that the Class 1 geotextile will be exposed
on the surface of the trench. The geotextile will degrade over time due to exposure to
sunlight, and will most likely be damaged overtime bymowing equipment.
BERKS COUNTY PLANNING COMMISSION COMMENTS:
1. The following are stand-out comments from the BCPC letter dated May 19, 2020. There
are twelve (12) comments in total, not all are mentioned here. The Applicant should be
aware of all BCPC comments; the May 19, 2020 letter states that both JoJaz Properties,
LLC and Crossroads, LLC received carboncopyoftheBCPCreviewletter.
2. HighlightedBCPCComments
AccessEasement 2shouldbereviewedbytheTownshipSolicitorfor
appropriateness and the easement should be recorded with the Final Plan.
i.Acknowledged.The applicant stated solicitor comments will be
incorporated and recorded with the final plan.
Special consideration should be given to Peter's Creek, which is designated as
Exceptional Value (EV)waters.It is locatedapproximately6oofeet southofthe
subject site on land owned by the City of Reading Water Bureau.

MaidencreekTownshipPlanning Commission
July 1, 2020
Re:
JoJazSubdivision
Page10of 12
Preliminary/Final Plan Review #2
i.Acknowledged.The Erosion and Sediment Control narrative should be
submitted to the Berks County Conservation District for review and
approval. An approval letter from BCCD should be provided upon receipt.
The site is within the surface water source area of the Reading Area Water
Authority. BCPC recommends that the developer contact the Authority for more
information.
i.Acknowledged. The applicant stated they are in contact with the
Authority.
MISCELLANEOUS:
1. Traffic
a. Trucks are prohibited on Evansville Road. Trucks will be required to use Maiden
Creek Road to Route73and to Pleasant Hill Road.
b.The proposed road construction at Maiden Creek Road requires a PennDOT
Highway Occupancy Permit. If there is an HOP for the existing driveway, a copy
shouldbeprovidedbytheApplicant.
In addition,Recording Note8 should be removed or revised.
Addressed.HOP has been provided and Note 8 has been revised.
c.The previous submission included a full turning radius for vehicles entering and
exiting onto Maiden Creek Road. The current submission shows larger vehicles but
does not show full turn radii.
i.It appears the turn radii may be too small for the larger vehicies. Full
turning radii should be provided. Any construction to increase the radii will
requirenewPennDOTHOPapproval.
2. On-lot sewage is proposed.
a. A public sewer system should be investigated to determine feasibilityto include
Molitownareaand MaidenCreek Road users.
SDE

MaidencreekTownshipPlanningCommission
July 1, 2020
Re:
JoJazSubdivision
Page11of12
Preliminary/FinalPlanReview#2
3.The plan should clarify the limits of the existing pavement to be removed in the area of
the proposed cul-de-sac where the existing driveway for Custom Milling & Consulting, inc.
will tie into the new road.
a.Addressed. Clarification has been added to the Sheet 3.
4. Maidencreek Township currently maintains a Township residential grass clippings drop-off
location on thenorthwest corner of the propertyalong Maiden Creek Road. Thefuture
status of this facility should be noted.
a.Acknowledged.Note added to Sheet 1.
5. The proposed road is to remain private; a Maintenance agreement for the proposed road
should be submitted by the Applicant and commented on by Township Solicitor.
a.Partially addressed. The applicant stated that a Maintenance Agreement would
be submitted closer to final approval.
WAIVERREQUESTS:
Waivers to three (3)sections are requested via a letter dated June 24, 2020.
1.Waiverto Section S190-32.1.2 regarding a public single access street to be the sole
vehicular access to a nonresidential use.
2.Waiver to Section 190-32.L.3 regarding the requirement for curbs and sidewalks.
3. Waiver to Section $190-39 regarding soils percolation tests for all subdivisions and land
developments where on-lot sewage disposal is proposed.
a. The Planning Commission should determine the feasibility and necessity of the
first two (2) above requests and make recommendations accordingly.
b. The Planning Commission cannot grant a waiver with regard to soil percolation
tests as this is a DEP regulation.
SDE

MaidencreekTownshipPlanningCommission
July 1, 2020
Re:
JoJazSubdivision
Page 12 of 12
Preliminary/FinalPlanReview#2
If you should have any questions or comments, please do not hesitate to contact our office.
Sincerely,
SYSTEMSDESIGNENGINEERING,INC.
Philip J.Ashear
Township Planning Consuitant
Cc:
MaidencreekTownshipPlanningCommissioners
DianeHollenbach/TownshipManager
EugeneOrlando,Jr./TownshipSolicitor
TheCrossroads Group
SDEFile#20-0024-0715

SYSTEMSDESIGN
"APassionforEngineering Excellence"
SDE
ENGINEERING,INC
sdei.net
July2,2020
CERTIFIED MAIL
Return Receipt Requested
Scott W.Zimmerman
70192970000191695208
451HochRoad
Blandon,PA19510
Re:
StormWaterPermit/RainGardenMaintenance
NOTICEOFVIOLATION
Dear Mr.Zimmerman:
Please be advised that in accordance with your storm water permit, you as property owner, are
responsible for the perpetual maintenance of the storm water facilities located on your property.
Upon inspection of the storm water facilities, by this office, on behalf of Maidencreek Township, it appears
that rain gardens one (1) through three (3) are not being maintained and may being altered. Please find
attached the Drainage Plan Dwg.D1o1 as prepared by Berks Surveying & Engineering Inc. and approved
foryourproperty'sstormwaterpermit.
Please contact this office withinten (10)daysofreceipt of thisletter.
Regards,
Systems Design Engineering,Inc.
Thomas S. Unger, P.E.
Enclosure
Cc:
MaidencreekTownship
File20-0019-0700
1032James Drive, Leesport,PA19533.P:610.916.8500.F:610.916.8501
/z
Schuylkill Haven, PA.P:570.385.5549
Boyertown, PA P: 610.369.1319

Berks Surveying & Engineering, Inc.
D101
Certiricatlon
Aasn Gursens e83
DRNNAEPLAN
_FNGIMEERED_SOIL/ELANIING_RETAIL,
16953716
Project No.
ZIMMERMAN
HO
11-9-18
OWNERS/DEVELOPERS
.ecaticn
RADER
Scott w.
RAIN GARDEN 3 DETAIL
100d
ckeye_Pipsline
roperty boundary
Existing_contour
ontof
LEGEND
UT
Line
ZIMMERMAN PROPOSED RESIDENCE
noda.
DRAINAGE PLAN
SERIAL$20182472141
RAIN GARDEN 2 DETAIL
-1776
GRASS
GRAPHIC SCALE
RAIN GARDEN 1 DETAIL
ASTAD
T'I'N
PAVEDDRIVEWAYCROSSSECTON
STE
NO
000
K.T.E.

SUMMARY
IMIPROVEMENTAGREEMENTSINVOICES
APPROVEDFORPAYMENT
MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS
JULY 9, 2020
DATEOFINVOICE/PAYEE
INVOICE NO.
AMOUNT
1. GSP Properties, LLC
6/30/20 Maidencreek Twp.-Re: SDE, Inc.
$426.26
AMOUNTDUE
$426.26
TOTALAMOUNTDUE
$426.26
I:/Projects/MaidencreekTownshiplImpr0vementAgreementSummaries/2020107.09.20.doc

MAIDENCREEKTOWNSHIP
SEOACTIVITYREPORT
June, 2020
Fee Paidto
Date By
SDE#
App.#
AoplicantActivity
Applicant
Billed/Paid
Chk#
281Blandon Road
7/19/19 -Replacement septic systemapplication.Testing was
performedbypreviousSEO.Verifytestsite.Send idemntification
formto applicant.Septic systempermit cannotbe issueduntil the
19-0019-0479
Z176966
notarized indemnification is receivedbySEO.
9/4/19-Process application and verification of priortesting for new
septicsystem.Reviewdesign/issuepermit
No update
$724.00
Paid
1002
65 Troxel Rd.
Z203635
19-0019-0480
10/7/19-Review design/issue permitfor new system
No update
$585.00
Paid
122
1142PleasantHill Road-Ownerwantstosubdivideanotherlotoff
of the farm.
2/17/20 -Schedule testing and notify PADEP.
3/5/20 -Probes for primary and replacement system on new lot
and replacement areaforexistinglot.
3/6/20-Conduct percolation testing forprimaryandreplacement
20-0019-0481
Subdivision
system on new lot.
3/31/20-Completesoil reports,sendtoconsultant
6/2/20 -Rec incomplete planning module.Send letterto
consultant.
6/9/20-Communications wiPhil AshearandPADEPre:nitrate
$1,608.00
Paid
easementrequirements.
114
1070MaidencreekRoad-Thepropertydidn't pass the real estate
inspection.Replacement septic systemtesting is necessary.
20-0019-0482
Z215216
3/17/20-Conduct soil probes.Dig/presoakpercholes.
3/18/20-Performpercolationtest.
No update
$692.00
Paid
48TroxelRd-Septicsystemissharedwithneighborat56Troxel
Road. The system is malfunctioning so replacement will be
necessary for both properties.Each home will applyfor a permit
for their own system instead of sharing one.
4/1/20-Probes
4/3/20-Observeperctest
4/9/20-Soil report
20-0019-0483
Z2010423
4/14/20-Processapplication
4/24/20-Reviewdesign/issuepermit
5/12/20-ScarificationinspectionPASSED
5/14/20-Tank installation inspectinPASSED
5/15/20-PressuretestPASSED
5/18/20-Final grading inspectionPASSED
6/2120 -Rec. activated warranty registration for treatment
700+240=
$940
system.
Paid
56TroxelRd-Replacementsystem
4/1/20-Probes
4/7120 -Observe perc test
4/9/20-Soil report
4/24/20-Reviewdesign/issuepermit
20-0019-0484
ZZ136352
5/12/20ScarificationInspection
5/15/20PressureTestInspection
5/18/20Final GradingInspection
6/2/20 -Rec.activated warrantyregistration for treatment
700+240=
$940
system.
Paid
872ParkRd-Replacementsystem
5/13/20-Processapplication
5/14/20-Observeprobes
Z210426
20-0019-0485
5/15/20-Perform percolation test
5/18/20 Soil report and send to deigner
6/11/20-Reviewdesign.Fees duebeforepermitcanbe
$570.00
Paid
issued.
50873
185OrchardRoad-Replacementsystem
5/20/20Probes testing
20-0019-0456
Z207852
5/21/20PercTest
5/21/20 soil &perc report write up
5/25/20 scanned soil &perc reportand email to designer
$700.00
Paid
1264
Misc Admin
6/1/20 -Discuss Jojaz subdivision with Philip Ashear. Some
soil test sites are shown on the plan but SEO requires DEP
20-0019-0300
General Work
planning approval before the lots can be created.
6/11/20-Communications wlapplicant re:permitting
requirements for a replacement system.
Cc:T.Unger 2 copies
SEO Desk
projects/maidencreek/20-0019-0300/seoactivity

MAIDENCREEKTOWNSHIP
SEOACTIVITYREPORT
June,2020
Fee Paid to
Date By
SDE#
ADD.#
Applicant/Activity
Billed/Paid
Applicant
Chk #
281BlandonRoad
7/19/19-Replacementsepticsystemapplication.Testingwas
performed byprevious SEO.Verifytestsite.Send idemntification
19-0019-0479
Z176966
formtoapplicant.Septicsystempermitcannotbeissueduntifthe
notarized indemnification is received by SEO.
9/4/19 -Process application and verification of prior testing for new
septic system.Reviewdesign/issuepermit
No update
$724.00
Paid
1002
65Troxel Rd.
Z203635
19-0019-0480
10/7/19-Review design/issue permit for new system
No update
$585.00
Paid
122
1142Pleasant Hill Road-Ownerwantstosubdivideanotherlot off
of the farm.
2/17/20-Schedule testing and notify PADEP.
3/5/20 -Probes for primary and replacement system on new lot
and replacement areaforexisting lot.
3/6/20 -Conduct percolation testingfor primary and replacement
20-0019-0481
Subdivision
system on newlot.
3/31/20-Completesoil reports,send toconsultant
6/2/20-Rec incomplete planning module.Send letter to
consultant.
6/9/20-Communicationsw/PhilAshearandPADEPre:nitrate
$1,608.00
easementreguirements.
Paid
114
1070 Maidencreek Road-The property didn't pass the real estate
inspection. Replacement septic system testing is necessary.
20-0019-0482
Z215216
3/17/20-Conductsoil probes.Dig/presoakpercholes.
3/18/20 -Perform percolation test.
No update
$692.00
Paid
48TroxelRd-Septicsystemissharedwithneighborat56Troxel
Road.Thesystem ismalfunctioning soreplacementwill be
necessaryforbothproperties.Eachhomewill applyforapermit
for their own system instead of sharing one.
4/1/20-Probes
4/3/20 -Observe perc test
4/9/20-Soil report
20-0019-0483
Z2010423
4/14/20-Process application
4/24/20-Reviewdesign/issuepermit
5/12/20-Scarification inspectionPASSED
5/14/20-Tank installation inspectinPASSED
5/15/20-PressuretestPASSED
5/18/20-Final grading inspection PASSED
6/2/20 -Rec.activated warranty registration for treatment
700+240=
$940
system.
Paid
56TroxelRd-Replacementsystem
4/1/20 -Probes
4/7/20 - Observe perc test
4/9/20 -Soil report
4/24/20-Reviewdesign/issuepermit
20-0019-0484
ZZ136352
5/12/20ScarificationInspection
5/15/20PressureTestInspection
5/18/20Final Grading Inspection
612/20 -Rec. activated warranty registration for treatment
700+240=
$940
system.
Paid
872ParkRd-Replacementsystem
5/13/20-Processapplication
5/14/20-Observeprobes
Z210426
20-0019-0485
5/15/20-Performpercolationtest
5/18/20Soil reportandsendtodeigner
6/11/20-Review design.Fees due beforepermit can be
$570.00
issued.
Paid
50873
185OrchardRoad-Replacementsystem
5/20/20Probestesting
20-0019-0456
Z207852
5/21/20PercTest
5/21/20soil&percreportwriteup
5/25/20 scanned soil &perc report andemail to designer
$700.00
Paid
1264
Misc Admin
6/1/20-Discuss Jojaz subdivision withPhilipAshear.Some
20-0019-0300
General Work
soiltestsitesareshownontheplanbutSEOrequiresDEp
planning approval before the lots can be created.
6/11/20-Communicationswlapplicantre:permitting
requirements for a replacement system.
Ce:T.Unger 2 copies
SEO Desk
projects/maidencreek/20-0019-0300/seoactivity