MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS
NOVEMBER12,2020
ENGINEER'SAGENDA
SubdivisionReviewStatusChecklist
Next Supervisors Meeting December 10, 2020
JoJaz expires 11/30/20; TE granted to 2/28/2021
Kopfer expires 12/1/2020; TE granted to 3/1/2021
Rednerexpires12/1/2020
Subdivision /Zoning / LDP
JoJazSubdivisionPrel./FinalseeSDEreviewItr.Dated8/4/20.
Redner's Quickshop&CarWashPrel.Plan see SDEItr.Dated 10/7/20; PC
recommended conditional plan approval.
David Kopfer Sketch Plan for Record see SDE Itr.Dated 6/3/20; zoningvariance
application submitted.
Gun Range regulations draft reviewed w/P.C.on 1/8/20revisions/additions
being made.
Burning Ordinance regulation draft reviewed by P.C. on 9/2/2020 additional
revisions/additions being made.
115 Grove Rd.Subd.-reapproval of prior plan action.
Projects
StreetProjects2020
ExcelsiorDrive&JuneAve.BOSawarded:
Contract"A"to Recon Construction in the amount of
$206,038.00; work completed 8/20/20.
Application for Payment No.1 (Final) in the amount of
$199,976.78; Change Order No. 1 credit (decrease) in the amount
of $6061.22
Contract“"B"to New Enterprise Stone & Lime Co. in the amount
of $135,317.50; work completed.
Application for Payment No.1 (Final) in theamount of
$128,818.02; Change Order No. 1 credit (decrease) in the
amount of $6499.48.
LutzPropertyE.WesnerRd.stormwaterissue
Reviewed WalnutManor&GoldenManorSubdivisionPlans (Plans start
in 1987).There is no storm water easement on plans.No notesfor
storm water system maintenance on plans.
Inspected site w/Keith S.
Page 1 of 2
I:\Projects\Maidencreek Townshipl20-0019-0100\Engineer's Agendal11.12.20.docx

Establishedthat headwall is at 20'6"from centerline &Twp.r/w is
26'6".
Proposed Twp. Scope of Work provided to Twp.
PenroseAveSinkhole
Repaircompleted.
Storm Damage
Met w/property owner@ 305Faith Dr.and answered questions
241 W.Walnut Tree Dr.-inspected and walked site during two (2) rain
events; will present diagrams and sketches @ Bos Meeting.
Reviewed Twp.Wide storm water systems; there are over1167inlet
structures; would like to discussw/Bos options; would recommend to
Bos to form a storm water action committee (one BoS, Manager, Road
Foremen, One PC Member and Twp. Engineer)
Surveyed and layout storm water pipe along Guldin Rd.
Subdivision Improvement LOC/Escrow Release
None
Sewage Enforcement Officer Activity Report
See Attached
Page 2 of 2
I:\Projects\MaidencreekTownship/20-0019-0100\Engineer'sAgendal11.12.20.docx

Most Recent
Letter Date
11/10/2020
10/7/2020
5/1/2020
Review
6/3/2020
PC recommended acceptance of
PC recommended acceptance of
PC recommended conditional
Approval conditioned on SDE
Comments
TE; BOS Action
TE; BOS Action
plan approval
reviewletter
Approved
BY BOS
05/14/20
MAIDENCREEKTOWNSHIP,BERKSCOUNTY
than one extension)
(may reflect more
Ext. granted until
Ext. granted until
Extension
11/30/2020
2/28/2021
12/01/20
12/1/2020
3/1/2021
SUBDIVISION STATUS
11/12/2020
Period Ends
07/16/20
09/01/20
09/01/20
90-Day
09/01/20
Review
Review Period
04/17/20
06/03/20
06/03/20
Begins
06/03/20
90-Day
Plan Stage
Prelm/Final
Prelm/Final
 Prelm Plan
Sketch Plan
for Record
Plan
Plan
Redner's Quickshop and Car Wash
APPROVED/PENDINGPLANS:
David Kopfer Subdivision
CURRENT PLANS:
SchickDental Office
Jojaz Subdivision
Project Name
No.

: 9O-DAY REVIEW PERIODEXTENSION OF TIME
I, THE UNDERSIGNED, being the developer of the subdivision known as
do hereby agree to extend the 90-day review period from the
SKETCH/PRELIMINARY/FINALPLANuntil
Signature
2020
Date

MAIDENCREEKTWP.PLANNINGCOMMISSION
P.O.BOX319,BLANDON,PA19510
November5,2020
Maidencreek Township Board of Supervisors
POBox319
Blandon,PA19510
All,
At their November 4, 2020 meeting, the Maidencreek Township Planning Commission
recommended by formal motion that the Board of Supervisors accept the extension of time until
February 28, 2021 for the review period for the Jojaz Subdivision Plan.
If you have any questions, please call me at (610) 926-4920.
Sincerely,
Kotl
Katelyn Gruber
Planning Commission Recording Secretary
Maidencreek Township
cC:
NickStoltzfus,Desco
Jeremiah Hoagland, Crossroads Group

:9O-DAYREVIEWPERIODEXTENSIONOFTIME
I, THE UNDERSIGNED, being the developer of the subdivision known as
KopfrenSopiusioR
do hereby agree to extend the 90-day review period from the
Me
202/
SKETCHPRELIMINARY/FINALPLANUnti
Signature
Date

MAIDENCREEKTWP.PLANNINGCOMMISSION
P.O.BOX319,BLANDON,PA19510
November5,2020
Maidencreek Township Board of Supervisors
PO Box 319
Blandon,PA19510
All,
At their November 4, 2020 meeting, the Maidencreek Township Planning Commission
recommended by formal motion that the Board of Supervisors accept the extension of time until
March 1, 2021 for the review period for the David and Carol Kopfer Subdivision Plan.
If you have any questions, please call me at (610) 926-4920.
Sincerely,
Katelyn Gruber
Planning Commission Recording Secretary
Maidencreek Township
CC:
Daniel Laudenslayer
David Kopfer

SYSTEMSDESIGN
Pass: +
SDE
FCINUERIN?
sdei.net
October 7, 2020
DianeHollenbach,TownshipManager
Maidencreek Township
1 Quarry Road
Blandon,PA19510
Re:
Redner'sQuickshopandCarWash
PreliminaryPlanReview#4
Ms. Hollenbach:
Systems Design Engineering, Inc. is in receipt of a Preliminary Plan entitled “Redner's Quickshop
and Car Wash." The site has three (3) access points; two on Allentown Pike (US Route 0222) and
another on Lake Shore Drive (PA Route 0073). The proposal would result in gas pumps, a
convenience store, and car wash. The Plan was prepared by Bogia Engineering, Inc. The
submission consisted of response letters to SDE's August letter, a Stormwater Management
report (including supplemental computations) and the following:
Cover Sheet
Sheet 1of 11
Dated5/20/2020, Rev 9/23/2020
ExistingConditionsPlan
Sheet 2 of 11
Dated 5/20/2020, Rev 9/23/2020
Grading and Utility Plan
Sheet 3 of 11
Dated5/20/2020,Rev9/23/2020
Details Plan
Sheet 4 of 11
Dated 5/20/2020, Rev 9/23/2020
Details
Sheet 5 of 11
Dated5/20/2020,Rev9/23/2020
Landscaping Plan
Sheet 6 of 11
Dated5/20/2020, Rev9/23/2020
Lighting Plan
Sheet 7 of 11
Dated5/20/2020,Rev9/23/2020
E&SPlan
Sheet 8of 11
Dated5/20/2020,Rev9/23/2020
E&SPlan Details
Sheet9of 11
Dated 5/20/2020, Rev 9/23/2020
Drainage Area
Sheet 10 of 11
Dated5/20/2020,Rev9/23/2020
Truck Turn
Sheet 11 of 11
Dated5/20/2020,Rev9/23/2020
BACKGROUND:
The purpose of the plan is to establish a gas station, car wash and convenience store on parcels
zoned C-1 Local Commercial. The subject site consists of three (3) neighboring parcels that total
1.75 acres in size. The site is to be served with public water and sewer. The site previously
I:(Projects/MaidencreekTownship PC/20-0024-0717Redner's Quickshop and CarWash/Redner's Prel Plan Rev #4.docx
1032James Drive, Leesport, PA 19533P: 610.916.8500.F: 610.916.8501
Schuylkill Haven,PAP:570.385.5549
Boyertown,PA.P:610.369.1319

MaidencreekTownship Planning Commission
October7.2020
Re:
Redner'sQuickshopandCarwash
Page 2 of 6
PreliminaryPlanReview#4
existing building, while gas pumps wouid be moved to the southwest side of the site and a car
wash would be constructed. The existing driveway onto Rt. 222 will be removed and a new
driveway constructed to the south.
The applicant has also sought and received zoning relief from the Maidencreek Township Zoning
Hearing Board.
REVIEW:
This letter presents comments on the third review of the submitted Preliminary Plan.
ZONING:
The subject site is located in the C-1 Local Commercial Zoning District.
1. The first review did not interpret the proposed car wash as an accessory use. The car
Wash is interpreted as a use permitted by Special Exception.
Addressed. A special exception was approved by the Zoning Hearing Board on
8/4/2020.
2. Per $220-62,Sign Regulations
A previous sign at the corner of Allentown Pike and Lake Shore Drive was
removed. However, new sign details are not provided.
The Applicant should put sign details on the plan and demonstrate
compliancewithSection$220-62.
1. Addressed. The applicant stated that sign regulations would be in
compliance. Details for traffic signage was provided. Details for
business signage is not provided.
a. The applicant stated via Note 15 that all signage would
comply with the appropriate Township Ordinance and
further stated that a signage packet would be submitted
outside the land deveiopment submission. A separate
zoning permit will be required.

MaidencreekTownshipPlanning Commission
October7,2020
Re:
Redner's Quickshop and Carwash
Page 3 of 6
PreliminaryPlanReview#4
3. Special Exceptions
Section $220-65 states special exception requirements for car washes:
o Car washes are permitted only in an enclosed building that must be at least
10o feet from residential districts and right-of-way intersections.
Additionally, sufficient space must be provided for at least ten (1o) stacked
vehicle spaces.
Addressed. A special exception to allow the car wash use was
approved on 8/4/2020. A variance was granted on 8/4/2020 to
allow six (6) stacking spaces, rather than ten (10).
LIGHTING STANDARDS:
1. Per 5186-47, Design and Performance Criteria
Per subsection B(3), automatic switching devices such as timers and/or motion
detectors should extinguish "offending sources" of light. All night safety lighting is
permitted but may not exceed 25% of normal levels permitted by this section.
o A note should be added to the plan addressing the above comment. The
note should state the way in which the requirements of this section will be
met.
2. The dashed label for the "East Parking" is inaccurate. Color for the area shown on the
plan and in the table should match.
SALDO:
1.Per§190-15,PreliminaryPlan Requirements
Per Subsection C, the plan shall be sealed by the professional responsible for the
plan.
Partially Addressed. The applicant stated that the plans will be sealed by a
Professional Engineer at the time of Final plan approval.
2.Per $190-34 Sidewalks

MaidencreekTownshipPlanningCommission
October7,2020
Re:
Redner's Quickshop and Carwash
Page4of6
PreliminaryPlan Review#4
Sidewalks may be required for commercial developments by the Board of
Supervisors.
o Addressed. Note 16 states that the lot owner will be responsible for
sidewalk construction if deemed necessary by the Township Supervisors.
3. Per $190-44, Landscaping
The selected species -- Prunus serrulate (Kwanzan Cherry) and Juniperus Chinesis
(Seagreen Juniper) - are not included on the Townships recommended list.
o SDE's landscape architect stated that the chosen species are acceptable.
However, the location of existing vegetation should also be provided prior
to Final Plan approval.
1. Addressed. Existing vegetation was added to the plan.
STORMWATER MANAGEMENT:
1. Per 182-11, Erosion and Sediment Control -~The Erosion & Sediment Control Plan should
be submitted to the Berks County Conservation District for review and approval. A copy
of the approvail letter should be submitted to the Township prior to Final Plan approval.
2. Per s182-24.F-The proposed storm sewer connections to the proposed inlet located in
the SR 0222 right-of-way, as well as the driveway modifications, will require a PennDOT
Highway Occupancy Permit. A copy of the approved HOP(s) should be submitted to the
Township prior to Final Plan approval.
3. Per §182-30, Performance Guarantee -A financial guarantee should be provided for the
proposed stormwater management controls prior to Final Plan approval.
4. Per $182-32 and $182-34, Operations and Maintenance Agreement for Privately Owned
Stormwater Controls and BMPs --The Stormwater Management Controls and Best
Management Practices Operations and Maintenance Agreement in Appendix A of the
Stormwater Management Ordinance should be submitted for review and approval by the
Township prior to Final Plan approval.
5. The Detention Basin Cross-Section detail should be revised to show only one anti-seep
collar and the distance from the outiet structure to the collar should be revised.
SDE

MaidencreekTownshipPlanningCommission
October 7, 2020
Re:
Redner's Quickshopand Carwash
Page5of6
PreliminaryPlanReview#4
MISCELLANEOUS:
1. MTA approval is required. The plans should be submitted to the Maidencreek Township
Authority and an approved review letter should be provided to the Township upon
receipt.
Partially addressed. The plan was submitted to MTA. Receipt of approval by the
MTA should be submitted to the Township office and to SDE.
2. An approved PennDOT Highway Occupancy Permit should be provided for access points
alongAllentown Pike.
Outstanding. An approved Hop has not been provided. The applicant stated that
it will be provided once received.
3. Curb Radii
The applicant should explain ar amend the 2-foot curb exit radius at the
northeasternaccesspointto UsRoute0222.
The 2-foot curb radii have been amended to 5feet. These will need to be
reviewed and approved by PennDOT as part of the HOP approval.
1. Partially addressed.The applicant stated that an approved HOp
will be provided once received.

MaidencreekTownshipPlanningCommission
October7,2020
Re:
Redner'sQuickshopandCarwash
Page 6 of 6
PreliminaryPlanReview#4
Sincerely,
SYSTEMSDESIGNENGINEERING,INC.
PhilipJ.Ashear
Township Planning Cansultant
Cc:
MaidencreekTownshipPlanningCommissioners
DianeHollenbach/TownshipManager
Nicole Plank, Esq.
Bogia Engineering, Inc.
SD

PHONE: 610-926-4920
FAX: 610-926-6314
MAIDENCREEK TOWNSHIP
BOARDOF SUPERVISORS
www.maidencreek.net
August 8, 2019
Maidencreek Township Board of Supervisors
POBox319
Blandon, PA 19510
At their May 9, 2019 meeting, the Maidencreek Township Board of Supervisors granted
conditional final plan approval to the Grove Road Subdivision Plan conditioned upon satisfaction
of the April 29, 2019 Systems Design Engineering, Inc. review letter, which is incorporated by
reference, and execution of an improvements agreements with financial security.
The motion was reaffirmed August 8, 2019. If you have any questions, please call me at
(610) 926-4920.
Sincerely,
Diane Hollenbach
Manager
MaidencreekTownship
cC;
Berks Surveying and Engineering Inc.

SYSTEMSDESIGN
"A Passion forEngineering Excellence"
SDE
ENGINEERING,INC
sdei.net
November12,2020
BoardofSupervisors
MaidencreekTownship
1 Quarry Road
Blandon,PA19510
Re:
2020 Paving Project
ContractB-NewEnterpriseStone&LimeCo.,Inc.
Payment Application No.1"Final"
DearBoardMembers:
We have reviewed Payment Application No.1"Final" submitted by New Enterprise Stone &
Lime Co., Inc. for the 2020 Paving Project-Contract B. Based on our review, the work
performed to date is satisfactory,and werecommend payment to New Enterprise Stone &
Lime Co.,Inc.for an amount of $128,818.02.
Enclosed is a copy of Payment Application No.1“Final". The Original Contract Price
(Contract B)as awarded is $135,317.50. The actual cost of Contract B work is $128,818.02
whichis$6,499.48undertheContractamount.
We have also enclosed a copy of Change Order #1 (Compensating Change Order) and
closeout documentation. Once we receive approval from Penn Dot Municipal Services,
Contract B of theproject will be considered complete.
The One-Year Guarantee Period will begin with the approval of the Final payment; therefore, the
One-Year Period will run from November 13, 2020 to November 13, 2021. Should you have any
questions, please do not hesitate to contact us.
If you have anyquestions, please do not hesitateto contact us.
Sincerely,
Systems Design Engineering, Inc.
Michael W."Chip"Pohronezny
Construction Manager
Enclosures
I:/Projects)Maidencreek Township/20-0019-0115 2020 Paving Project)Payment ApplicationsIContract B - New EnterpriselPay Appl. No.
1 Letter Contract B.docx
1032 James Drive, Leesport, PA 19533.P: 610.916.8500.F: 610.916.8501
SchuylkillHaven,PA·P:570.385.5549
Boyertown, PA.P: 610.369.1319

Change Order No. 1
DateofIssuance:September28,2020
Effective Date: September 28, 2020
Project: 2020 Paving Project
Owner:MaidencreekTownship
Owner's Contract No.:
Contract: Contract B
Date of Contract: August 6, 2020 (NTP)
Contractor: New Enterprise Stone & Lime Co., Inc.
Engineer's Project No.: 20-0019-0115
The Contract Documents are modified as follows upon execution of this Change Order:
Description: (1) Final Contract Price Adjustment to reflect actual quantities of materials installed for this project.
(-$6,499.48). The Total Decrease of the Contract Price for this Change Order is $6,499.48. There is no Change in
the Contract Time.
Attachments (list documents supporting change): New Enterprise Stone & Lime Co., Inc. Payment Application
No. 1-Final.
CHANGE IN CONTRACTPRICE:
CHANGEIN CONTRACT TIMES:
Original Contract Price:
Original Contract Times:
 Working days  Calendar days
Substantial completion (days or date):
135,317.50
Ready for final payment (days or date):
[Increase] [Decrease] from previously
[Increase] [Deerease] from previously approved Change Orders
approved Change Orders No.  to No.
No.
 to No. 
Substantial completion (days):
Ready for final payment (days):
Contract Price priortothis Change Order:
Contract Times prior to this Change Order:
-Substantial completion (days or-date):
135,317.50
-- Ready for final payment (days or date):
[Inerease] [Decrease] of this Change Order:
[Increase] [Decrease] of this Change Order:
-Substantial completion (days or date):
6.499.48
Ready for final payment (days or date):
Contract Price incorporating this Change
Order:
Contract Times with-all approved Change Orders:
Substantial completion (days or date):
128,818.02
- Ready for final payment (days or date):
RECOMMENDED:
ACCEPTED:
ACCEPTED:
By:
By:
By:
Engineer (Authorized Signature)
Owner (Authorized Signature)
Contractor (Authorized Signature)
Date:
Date:
Date:
EJCDCC-941ChangeOrder
Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute.
Page1of1