Board of Supervisors
Agenda — December 10, 2020
- Date
- December 10, 2020
- Type
- Agenda
- Year
- 2020
- File
- PDF · 6.6 MB
Document text
Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 2,409 words
MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS NOVEMBER12,2020 ENGINEER'SAGENDA SubdivisionReviewStatusChecklist Next Supervisors Meeting December 10, 2020 JoJaz expires 11/30/20; TE granted to 2/28/2021 Kopfer expires 12/1/2020; TE granted to 3/1/2021 Rednerexpires12/1/2020 Subdivision /Zoning / LDP JoJazSubdivisionPrel./FinalseeSDEreviewItr.Dated8/4/20. Redner's Quickshop&CarWashPrel.Plan see SDEItr.Dated 10/7/20; PC recommended conditional plan approval. David Kopfer Sketch Plan for Record see SDE Itr.Dated 6/3/20; zoningvariance application submitted. Gun Range regulations draft reviewed w/P.C.on 1/8/20revisions/additions being made. Burning Ordinance regulation draft reviewed by P.C. on 9/2/2020 additional revisions/additions being made. 115 Grove Rd.Subd.-reapproval of prior plan action. Projects StreetProjects2020 ExcelsiorDrive&JuneAve.BOSawarded: Contract"A"to Recon Construction in the amount of $206,038.00; work completed 8/20/20. Application for Payment No.1 (Final) in the amount of $199,976.78; Change Order No. 1 credit (decrease) in the amount of $6061.22 Contract“"B"to New Enterprise Stone & Lime Co. in the amount of $135,317.50; work completed. Application for Payment No.1 (Final) in theamount of $128,818.02; Change Order No. 1 credit (decrease) in the amount of $6499.48. LutzPropertyE.WesnerRd.stormwaterissue Reviewed WalnutManor&GoldenManorSubdivisionPlans (Plans start in 1987).There is no storm water easement on plans.No notesfor storm water system maintenance on plans. Inspected site w/Keith S. Page 1 of 2 I:\Projects\Maidencreek Townshipl20-0019-0100\Engineer's Agendal11.12.20.docx Establishedthat headwall is at 20'6"from centerline &Twp.r/w is 26'6". Proposed Twp. Scope of Work provided to Twp. PenroseAveSinkhole Repaircompleted. Storm Damage Met w/property owner@ 305Faith Dr.and answered questions 241 W.Walnut Tree Dr.-inspected and walked site during two (2) rain events; will present diagrams and sketches @ Bos Meeting. Reviewed Twp.Wide storm water systems; there are over1167inlet structures; would like to discussw/Bos options; would recommend to Bos to form a storm water action committee (one BoS, Manager, Road Foremen, One PC Member and Twp. Engineer) Surveyed and layout storm water pipe along Guldin Rd. Subdivision Improvement LOC/Escrow Release None Sewage Enforcement Officer Activity Report See Attached Page 2 of 2 I:\Projects\MaidencreekTownship/20-0019-0100\Engineer'sAgendal11.12.20.docx Most Recent Letter Date 11/10/2020 10/7/2020 5/1/2020 Review 6/3/2020 PC recommended acceptance of PC recommended acceptance of PC recommended conditional Approval conditioned on SDE Comments TE; BOS Action TE; BOS Action plan approval reviewletter Approved BY BOS 05/14/20 MAIDENCREEKTOWNSHIP,BERKSCOUNTY than one extension) (may reflect more Ext. granted until Ext. granted until Extension 11/30/2020 2/28/2021 12/01/20 12/1/2020 3/1/2021 SUBDIVISION STATUS 11/12/2020 Period Ends 07/16/20 09/01/20 09/01/20 90-Day 09/01/20 Review Review Period 04/17/20 06/03/20 06/03/20 Begins 06/03/20 90-Day Plan Stage Prelm/Final Prelm/Final Prelm Plan Sketch Plan for Record Plan Plan Redner's Quickshop and Car Wash APPROVED/PENDINGPLANS: David Kopfer Subdivision CURRENT PLANS: SchickDental Office Jojaz Subdivision Project Name No. : 9O-DAY REVIEW PERIODEXTENSION OF TIME I, THE UNDERSIGNED, being the developer of the subdivision known as do hereby agree to extend the 90-day review period from the SKETCH/PRELIMINARY/FINALPLANuntil Signature 2020 Date MAIDENCREEKTWP.PLANNINGCOMMISSION P.O.BOX319,BLANDON,PA19510 November5,2020 Maidencreek Township Board of Supervisors POBox319 Blandon,PA19510 All, At their November 4, 2020 meeting, the Maidencreek Township Planning Commission recommended by formal motion that the Board of Supervisors accept the extension of time until February 28, 2021 for the review period for the Jojaz Subdivision Plan. If you have any questions, please call me at (610) 926-4920. Sincerely, Kotl Katelyn Gruber Planning Commission Recording Secretary Maidencreek Township cC: NickStoltzfus,Desco Jeremiah Hoagland, Crossroads Group :9O-DAYREVIEWPERIODEXTENSIONOFTIME I, THE UNDERSIGNED, being the developer of the subdivision known as KopfrenSopiusioR do hereby agree to extend the 90-day review period from the Me 202/ SKETCHPRELIMINARY/FINALPLANUnti Signature Date MAIDENCREEKTWP.PLANNINGCOMMISSION P.O.BOX319,BLANDON,PA19510 November5,2020 Maidencreek Township Board of Supervisors PO Box 319 Blandon,PA19510 All, At their November 4, 2020 meeting, the Maidencreek Township Planning Commission recommended by formal motion that the Board of Supervisors accept the extension of time until March 1, 2021 for the review period for the David and Carol Kopfer Subdivision Plan. If you have any questions, please call me at (610) 926-4920. Sincerely, Katelyn Gruber Planning Commission Recording Secretary Maidencreek Township CC: Daniel Laudenslayer David Kopfer SYSTEMSDESIGN Pass: + SDE FCINUERIN? sdei.net October 7, 2020 DianeHollenbach,TownshipManager Maidencreek Township 1 Quarry Road Blandon,PA19510 Re: Redner'sQuickshopandCarWash PreliminaryPlanReview#4 Ms. Hollenbach: Systems Design Engineering, Inc. is in receipt of a Preliminary Plan entitled “Redner's Quickshop and Car Wash." The site has three (3) access points; two on Allentown Pike (US Route 0222) and another on Lake Shore Drive (PA Route 0073). The proposal would result in gas pumps, a convenience store, and car wash. The Plan was prepared by Bogia Engineering, Inc. The submission consisted of response letters to SDE's August letter, a Stormwater Management report (including supplemental computations) and the following: Cover Sheet Sheet 1of 11 Dated5/20/2020, Rev 9/23/2020 ExistingConditionsPlan Sheet 2 of 11 Dated 5/20/2020, Rev 9/23/2020 Grading and Utility Plan Sheet 3 of 11 Dated5/20/2020,Rev9/23/2020 Details Plan Sheet 4 of 11 Dated 5/20/2020, Rev 9/23/2020 Details Sheet 5 of 11 Dated5/20/2020,Rev9/23/2020 Landscaping Plan Sheet 6 of 11 Dated5/20/2020, Rev9/23/2020 Lighting Plan Sheet 7 of 11 Dated5/20/2020,Rev9/23/2020 E&SPlan Sheet 8of 11 Dated5/20/2020,Rev9/23/2020 E&SPlan Details Sheet9of 11 Dated 5/20/2020, Rev 9/23/2020 Drainage Area Sheet 10 of 11 Dated5/20/2020,Rev9/23/2020 Truck Turn Sheet 11 of 11 Dated5/20/2020,Rev9/23/2020 BACKGROUND: The purpose of the plan is to establish a gas station, car wash and convenience store on parcels zoned C-1 Local Commercial. The subject site consists of three (3) neighboring parcels that total 1.75 acres in size. The site is to be served with public water and sewer. The site previously I:(Projects/MaidencreekTownship PC/20-0024-0717Redner's Quickshop and CarWash/Redner's Prel Plan Rev #4.docx 1032James Drive, Leesport, PA 19533P: 610.916.8500.F: 610.916.8501 Schuylkill Haven,PAP:570.385.5549 Boyertown,PA.P:610.369.1319 MaidencreekTownship Planning Commission October7.2020 Re: Redner'sQuickshopandCarwash Page 2 of 6 PreliminaryPlanReview#4 existing building, while gas pumps wouid be moved to the southwest side of the site and a car wash would be constructed. The existing driveway onto Rt. 222 will be removed and a new driveway constructed to the south. The applicant has also sought and received zoning relief from the Maidencreek Township Zoning Hearing Board. REVIEW: This letter presents comments on the third review of the submitted Preliminary Plan. ZONING: The subject site is located in the C-1 Local Commercial Zoning District. 1. The first review did not interpret the proposed car wash as an accessory use. The car Wash is interpreted as a use permitted by Special Exception. Addressed. A special exception was approved by the Zoning Hearing Board on 8/4/2020. 2. Per $220-62,Sign Regulations A previous sign at the corner of Allentown Pike and Lake Shore Drive was removed. However, new sign details are not provided. The Applicant should put sign details on the plan and demonstrate compliancewithSection$220-62. 1. Addressed. The applicant stated that sign regulations would be in compliance. Details for traffic signage was provided. Details for business signage is not provided. a. The applicant stated via Note 15 that all signage would comply with the appropriate Township Ordinance and further stated that a signage packet would be submitted outside the land deveiopment submission. A separate zoning permit will be required. MaidencreekTownshipPlanning Commission October7,2020 Re: Redner's Quickshop and Carwash Page 3 of 6 PreliminaryPlanReview#4 3. Special Exceptions Section $220-65 states special exception requirements for car washes: o Car washes are permitted only in an enclosed building that must be at least 10o feet from residential districts and right-of-way intersections. Additionally, sufficient space must be provided for at least ten (1o) stacked vehicle spaces. Addressed. A special exception to allow the car wash use was approved on 8/4/2020. A variance was granted on 8/4/2020 to allow six (6) stacking spaces, rather than ten (10). LIGHTING STANDARDS: 1. Per 5186-47, Design and Performance Criteria Per subsection B(3), automatic switching devices such as timers and/or motion detectors should extinguish "offending sources" of light. All night safety lighting is permitted but may not exceed 25% of normal levels permitted by this section. o A note should be added to the plan addressing the above comment. The note should state the way in which the requirements of this section will be met. 2. The dashed label for the "East Parking" is inaccurate. Color for the area shown on the plan and in the table should match. SALDO: 1.Per§190-15,PreliminaryPlan Requirements Per Subsection C, the plan shall be sealed by the professional responsible for the plan. Partially Addressed. The applicant stated that the plans will be sealed by a Professional Engineer at the time of Final plan approval. 2.Per $190-34 Sidewalks MaidencreekTownshipPlanningCommission October7,2020 Re: Redner's Quickshop and Carwash Page4of6 PreliminaryPlan Review#4 Sidewalks may be required for commercial developments by the Board of Supervisors. o Addressed. Note 16 states that the lot owner will be responsible for sidewalk construction if deemed necessary by the Township Supervisors. 3. Per $190-44, Landscaping The selected species -- Prunus serrulate (Kwanzan Cherry) and Juniperus Chinesis (Seagreen Juniper) - are not included on the Townships recommended list. o SDE's landscape architect stated that the chosen species are acceptable. However, the location of existing vegetation should also be provided prior to Final Plan approval. 1. Addressed. Existing vegetation was added to the plan. STORMWATER MANAGEMENT: 1. Per 182-11, Erosion and Sediment Control -~The Erosion & Sediment Control Plan should be submitted to the Berks County Conservation District for review and approval. A copy of the approvail letter should be submitted to the Township prior to Final Plan approval. 2. Per s182-24.F-The proposed storm sewer connections to the proposed inlet located in the SR 0222 right-of-way, as well as the driveway modifications, will require a PennDOT Highway Occupancy Permit. A copy of the approved HOP(s) should be submitted to the Township prior to Final Plan approval. 3. Per §182-30, Performance Guarantee -A financial guarantee should be provided for the proposed stormwater management controls prior to Final Plan approval. 4. Per $182-32 and $182-34, Operations and Maintenance Agreement for Privately Owned Stormwater Controls and BMPs --The Stormwater Management Controls and Best Management Practices Operations and Maintenance Agreement in Appendix A of the Stormwater Management Ordinance should be submitted for review and approval by the Township prior to Final Plan approval. 5. The Detention Basin Cross-Section detail should be revised to show only one anti-seep collar and the distance from the outiet structure to the collar should be revised. SDE MaidencreekTownshipPlanningCommission October 7, 2020 Re: Redner's Quickshopand Carwash Page5of6 PreliminaryPlanReview#4 MISCELLANEOUS: 1. MTA approval is required. The plans should be submitted to the Maidencreek Township Authority and an approved review letter should be provided to the Township upon receipt. Partially addressed. The plan was submitted to MTA. Receipt of approval by the MTA should be submitted to the Township office and to SDE. 2. An approved PennDOT Highway Occupancy Permit should be provided for access points alongAllentown Pike. Outstanding. An approved Hop has not been provided. The applicant stated that it will be provided once received. 3. Curb Radii The applicant should explain ar amend the 2-foot curb exit radius at the northeasternaccesspointto UsRoute0222. The 2-foot curb radii have been amended to 5feet. These will need to be reviewed and approved by PennDOT as part of the HOP approval. 1. Partially addressed.The applicant stated that an approved HOp will be provided once received. MaidencreekTownshipPlanningCommission October7,2020 Re: Redner'sQuickshopandCarwash Page 6 of 6 PreliminaryPlanReview#4 Sincerely, SYSTEMSDESIGNENGINEERING,INC. PhilipJ.Ashear Township Planning Cansultant Cc: MaidencreekTownshipPlanningCommissioners DianeHollenbach/TownshipManager Nicole Plank, Esq. Bogia Engineering, Inc. SD PHONE: 610-926-4920 FAX: 610-926-6314 MAIDENCREEK TOWNSHIP BOARDOF SUPERVISORS www.maidencreek.net August 8, 2019 Maidencreek Township Board of Supervisors POBox319 Blandon, PA 19510 At their May 9, 2019 meeting, the Maidencreek Township Board of Supervisors granted conditional final plan approval to the Grove Road Subdivision Plan conditioned upon satisfaction of the April 29, 2019 Systems Design Engineering, Inc. review letter, which is incorporated by reference, and execution of an improvements agreements with financial security. The motion was reaffirmed August 8, 2019. If you have any questions, please call me at (610) 926-4920. Sincerely, Diane Hollenbach Manager MaidencreekTownship cC; Berks Surveying and Engineering Inc. SYSTEMSDESIGN "A Passion forEngineering Excellence" SDE ENGINEERING,INC sdei.net November12,2020 BoardofSupervisors MaidencreekTownship 1 Quarry Road Blandon,PA19510 Re: 2020 Paving Project ContractB-NewEnterpriseStone&LimeCo.,Inc. Payment Application No.1"Final" DearBoardMembers: We have reviewed Payment Application No.1"Final" submitted by New Enterprise Stone & Lime Co., Inc. for the 2020 Paving Project-Contract B. Based on our review, the work performed to date is satisfactory,and werecommend payment to New Enterprise Stone & Lime Co.,Inc.for an amount of $128,818.02. Enclosed is a copy of Payment Application No.1“Final". The Original Contract Price (Contract B)as awarded is $135,317.50. The actual cost of Contract B work is $128,818.02 whichis$6,499.48undertheContractamount. We have also enclosed a copy of Change Order #1 (Compensating Change Order) and closeout documentation. Once we receive approval from Penn Dot Municipal Services, Contract B of theproject will be considered complete. The One-Year Guarantee Period will begin with the approval of the Final payment; therefore, the One-Year Period will run from November 13, 2020 to November 13, 2021. Should you have any questions, please do not hesitate to contact us. If you have anyquestions, please do not hesitateto contact us. Sincerely, Systems Design Engineering, Inc. Michael W."Chip"Pohronezny Construction Manager Enclosures I:/Projects)Maidencreek Township/20-0019-0115 2020 Paving Project)Payment ApplicationsIContract B - New EnterpriselPay Appl. No. 1 Letter Contract B.docx 1032 James Drive, Leesport, PA 19533.P: 610.916.8500.F: 610.916.8501 SchuylkillHaven,PA·P:570.385.5549 Boyertown, PA.P: 610.369.1319 Change Order No. 1 DateofIssuance:September28,2020 Effective Date: September 28, 2020 Project: 2020 Paving Project Owner:MaidencreekTownship Owner's Contract No.: Contract: Contract B Date of Contract: August 6, 2020 (NTP) Contractor: New Enterprise Stone & Lime Co., Inc. Engineer's Project No.: 20-0019-0115 The Contract Documents are modified as follows upon execution of this Change Order: Description: (1) Final Contract Price Adjustment to reflect actual quantities of materials installed for this project. (-$6,499.48). The Total Decrease of the Contract Price for this Change Order is $6,499.48. There is no Change in the Contract Time. Attachments (list documents supporting change): New Enterprise Stone & Lime Co., Inc. Payment Application No. 1-Final. CHANGE IN CONTRACTPRICE: CHANGEIN CONTRACT TIMES: Original Contract Price: Original Contract Times: Working days Calendar days Substantial completion (days or date): 135,317.50 Ready for final payment (days or date): [Increase] [Decrease] from previously [Increase] [Deerease] from previously approved Change Orders approved Change Orders No. to No. No. to No. Substantial completion (days): Ready for final payment (days): Contract Price priortothis Change Order: Contract Times prior to this Change Order: -Substantial completion (days or-date): 135,317.50 -- Ready for final payment (days or date): [Inerease] [Decrease] of this Change Order: [Increase] [Decrease] of this Change Order: -Substantial completion (days or date): 6.499.48 Ready for final payment (days or date): Contract Price incorporating this Change Order: Contract Times with-all approved Change Orders: Substantial completion (days or date): 128,818.02 - Ready for final payment (days or date): RECOMMENDED: ACCEPTED: ACCEPTED: By: By: By: Engineer (Authorized Signature) Owner (Authorized Signature) Contractor (Authorized Signature) Date: Date: Date: EJCDCC-941ChangeOrder Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute. Page1of1