MAIDENCREEKTOWNSHIP BOARDOFSUPERVISORS
JANUARY 14, 2021
ENGINEER'S AGENDA
Subdivision Review Status Checklist
Next Supervisors Meeting February 11, 2021.
Subdivision / Zoning / LDP
100 White Star Rd Sketch Plan +24000 SF Building Addition, see SDE Itr. dated
1/6/21.
Gun Range regulations draft reviewed w/P.C. on 1/8/20 revisions/additions
being made.
Burning Ordinance regulation draft reviewed by P.C. on 9/2/2020 additional
revisions/additions being made.
Projects
Street Projects 2021
O Scope of work under review with Twp. Manager and Road Foreman.
Storm water basin inspection -- Draft Reports to be finalized.
Completed Inspections:
Melrose Place Pond 1 & 2
CVS
Business Park
The Crossing at Maidencreek
Shadow Ridge - Phase 2
David Small
Tree Tops
Hearthstone Assisted Living
 Storm Damage
241 W. Walnut Tree Dr. - inspected and walked site during two (2) rain
events; presented diagrams and sketches @ BOs Meeting 11/12/20.
Reviewed Twp. Wide storm water systems; there are over 1167 inlet
structures; BOs agreed to form a storm water action committee (one
BOS, Manager, Road Foremen, One PC Member and Twp. Engineer)
Subdivision Improvement LOC / Escrow Release
Schick Dental office
Sewage Enforcement Officer Activity Report
 See Attached
Page 1 of 1
I:(Projects\Maidencreek Township/21-0019-0100\Engineer's Agendal01.14.21.docx

Most Recent
Letter Date
11/10/2020
5/1/2020
10/7/2020
Review
6/3/2020
BOS granted conditional Prel.
Approval conditioned on SDE
Zoning Variance granted
Plan approval 11/12/20
Comments
review letter
Approved
BY BOS
05/14/20
MAIDENCREEK TOWNSHIP, BERKS COUNTY
(may reflect more
than one extension
Extension
11/30/2020
2/28/2021
12/01/20
12/1/2020
3/1/2021
SUBDIVISION STATUS
12/10/2020
Period Ends
07/16/20
09/01/20
09/01/20
90-Day
Review
09/01/20
Review Period
04/17/20
06/03/20
06/03/20
90-Day
Begins
06/03/20
Plan Stage
Prelm/Final
Prelm/Final
Sketch Plan
Prelm Plan
for Record
Plan
Plan
APPROVED /PENDING PLANS:
Redner's Quickshop and Car Wash
David Kopfer Subdivision
CURRENT PLANS:
Schick Dental Office
Jojaz Subdivision
Project Name
No.

SYSTEMSDESIGN
SDE
ENGINEERING,INC
sdernet
January 6, 2020
Diane Hollenbach, Township Manager
Maidencreek Township
1 Quarry Road
Blandon, PA 19510
Re:
100 White Star Road
Sketch Plan Review
Ms. Hollenbach:
Systems Design Engineering, Inc. is in receipt of a Sketch Plan entitled "10o White Star Road."
The property is 6.391-acres in size and has frontage on White Star Road and Blandon Avenue in
Maidencreek Township. The Plan was prepared by Berks Surveying and Engineering, Inc. The
submission consisted of the following:
Sketch Plan
Sheet 101
Dated 12/22/2020
BACKGROUND:
The purpose of the Plan is to expand an existing manufacturing and warehouse building on a
ft. would be added. The property is currently served by on-lot sewage and well water.
REVIEW:
This letter presents comments on the first review of the submitted Plan.
ZONING:
The property is split-zoned. The west portion of the site, including the accessways, is zoned I -
Industrial. The east portion of the site is in the C-R Commercial-Residential Zoning District. The
intention is to expand the existing principal structure.
Comments on other issues are presented below.
I:ProjectsiMaidencreek Township PC/20-0024-0720 - 100 White Star Road ExpansioniSketch Plan Review Letter.docx
1032 James Drive, Leesport, PA 19533.P: 610.916.8500.F:610.916.8501
SchuylkilHaven,PAP:570.385.5549
Boyertown,PA.P:610.369.1319

Maidencreek Township Planning Commission
January 6, 2020
Re:
100 White StarRoad
Page 2 of 4
Sketch Plan review
1. Per 5220-37, Permitted Uses in the CR District
Per subsection A, warehousing is not a permitted use in the CR District. The
expansion on to the portion of the parcel zoned CR does not comply with the
permitted uses of this district.
 The applicant may wish to seek relief from the Township Zoning Hearing Board to
allow the expansion onto the portion of the property zoned CR.
2. Per $220-38, Area and Bulk Requirements in the CR District
 The zoning compliance table suggests that the front yard setback would be 21 ft.
after the expansion, compared to a requirement of 30 feet. It is unclear how the
front yard setback is determined on this plan.
 The applicant's interpretation of the front yard setback would result in a violation
of the 30-foot requirement.
The applicant should clarify the interpretation of "front yard" on this site.
Additionally, the applicant should explain the interpretation for "side yard" and
"rear yard" on this site.
3. Per $220-48, Permitted Uses in the Industrial District
Per subsection A, manufacturing and warehousing are permitted uses in the 1
District.
4. Per $220-49, Area and Bulk Requirements in the industrial District
The requirements on the portion of the site zoned Industrial appear to be met. As
stated above, alternate interpretations for "front yard," "side yard," and "rear
yard" may require updates to the zoning compliance tabie.
5. Per $220-64.A, Landscaping
All subdivisions and land developments are required to submit a landscape plan to
the Township for review and approval as part of the subdivision and land
development approval process.
o A Landscape plan is required with any subsequent Preliminary Plan or Final
Plan submission, the applicant shouid provide and landscaping plan in

Maidencreek Township Planning Commission
January 6, 2020
Re:
100 White Star Road
Page 3 of 4
Sketch Plan review
compliance with this Section and Section $190-44 of the Subdivision and
Land Development Ordinance.
6. The number of required parking spaces vs. the number of provided parking spaces should
be included on the zoning compliance table, rather than included in the notes.
LIgHTINg:
1.Per 186-48,Plan Submission
A lighting plan is required at the Preliminary Plan stage of land development. The
applicant should provide a lighting plan with a future Preliminary Plan or Final Plan
submission.
SALDQO:
1. Per §190-14, Sketch Plan
Sketch Plan requirements are met.
STORMWATER MANAGEMENT:
1. Stormwater management is not part of the Sketch Plan review. Appropriate stormwater
information, data and calculations should be provided with any subsequent
Preliminary/Final Plan.
GENERAL:
1. information regarding the capacity of the existing septic should be provided to the
this form (attached) with the SEO. Contact: Scot McCaffery, 610-916-8533. The applicant
may wish to investigate the feasibility of public sewer in coordination with the
Maidencreek Township Authority.
SDE

Maidencreek Township Planning Commission
January 6, 2020
Re:
100White Star Road
Page 4 of 4
Sketch Planreview
2. There is an existing access on the east side of the site. The plan labels this an "existing
gravel drive to be removed," however; the applicant stated it may remain as an
emergency access drive. This should be addressed with any future preliminary/final plan
submission. If the gravel drive will remain for the purpose of emergency access, the plan
should be reviewed by the Fire Marshal.
3. The applicant may wish to investigate the feasibility of public water as may be required by
UcC regulations at the time of building permit application
If you should have any questions or comments, please do not hesitate to contact our office.
Sincerely,
SYSTEMS DESIGN ENGINEERING, INC.
Piupd d
Philip J. Ashear
Township Planning Consultant
Cc:
Eugene Orlando,Jr./ Township Solicitor
Patrick Donovan / Maidencreek Township Authority
Bruce Rader, PE, PLS / Applicant's Engineer
SDEFile#20-0024-0720

SYSTEMS DESIGN
SDE
Project Name: Schick Dental Office
Municipality: Maidencreek Township
Plan Date: 4-24-2020
Date: 4-28-2020
SDEl Project No. : 20-0024-0714
IMPROVEMENTS CONSTRUCTION COST ESTIMATE AND OTHER FEES
Description
Units
Quantity
Unit Cost
Total
A.
EROSION & SEDIMENT CONTROL
Ea.
ROCK CONSTRUCTION ENTRANCE
1.
1,500.00
1,500.00
Ea.
2.
CONCRETE WASHOUT
500.00
500.00
18" SILT FENCE
L.f.
67
3.
2.25
150.75
18" COMPOST FILTER SOCK
L.f.
130
4.
12.00
1,560.00
Ea.
5.
INLET PROTECTION
250.00
500.00
EA.
PUMPED WATER FILTER BAG
6.
300.00
300.00
EROSION CONTROL BLANKET - ECS-1
S.Y.
1,800
2.00
3,600.00
S.Y.
8.
PERMANENTSEEDING & MULCHING
2,852
1.00
2,852.00
..5.
9.
MAINTENANCEAND REMOVAL OF E&S BMPS
500.00
500.00
SUBTOTAL OF ITEM A.
11,462.75
B.
STORM DRAINAGE
2'x2' INLET
Ea.
1.
900.00
900.00
15" HDPE STORM SEWER
L.f.
2.
48
25.00
1,200.00
3.
SEEPAGE BED 1
..y.
45
EXCAVATION
5.00
a.
225.00
C.y.
AASHTO NO. 1 STONE
b.
31
30.00
930.00
S.Y.
76
FILTER FABRIC
1.75
133.00
Ea.
INSPECTION/OVERFLOW PORT
35.00
70.00
L.f.
6"PERFORATEDPVCPIPE
26
10.00
e.
260.00
4.
SEEPAGE BED 2
C.y.
16
EXCAVATION
5.00
a.
80.00
C.y.
AASHTO NO.1 STONE/DECORATIVE STONE
14
b.
30.00
420.00
S.y.
60
FILTER FABRIC
1.75
C.
105.00
EA.
INSPECTION PORT
35.00
d.
35.00
L.f.
204
6"PVCROOFLEADERPIPE
20.00
5.
4,080.00
SUbTOTAL OF ItEm B.
8,438.00
C.
DRIVEWAY PAVING WITHIN RIGHT-OF-WAY
S.Y.
FINE GRADE SUBGRADE
31
1.
1.00
31.00
S.y.
2.
31
6" 2A SUBBASE
6.00
186.00
S.Y.
31
2.5"SUPERPAVE19.0 mmBINDERCOURSE
3.
12.00
372.00
S.y.
d. 1.5" SUPERPAVE 9.5 mm WEARING COURSE
31
8.00
248.00
SUBTOTAL OF ITEM C.
837.00
J:/ProjectsIMaidencreek Township PC120-0024-0714 Schick Dental Oficelmpr Cost EstimatelSchick Dental Impr Cons1 Cost Est
Page 1 of 2

SYSTEMS DESIGN
Project Name: Schick Dental Office
Municipality: Maidencreek Township
Plan Date: 4-24-2020
Date: 4-28-2020
SDEI Project No. : 20-0024-0714
ITEMS HIGHLIGHTED BELOW HAVE EITHER BEEN ADDED OR REVISED COMPARED TO THE APPLICANT'S ESTIMATE.
IMPROVEMENTS CONSTRUCTION COST ESTIMATE AND OTHER FEES
Description
Units
Quantity
Unit Cost
Total
D.
SITE LIGHTING
23'POLE MOUNTED LIGHT - SINGLE LUMINAIRE
EA.
2,000.00
1.
4,000.00
23'POLEMOUNTED LIGHT-DOUBLE LUMINAIRE
EA.
2.
2,500.00
2,500.00
WALL PACK
Ea.
3.
800.00
2,400.00
SUBtOtAL Of ItEm D.
8,900.00
E.
EA.
LANDSCAPING - SHRUBS
65.00
195.00
F.
SIGNS
Ea.
1.
HANDICAP PARKING
250.00
500.00
STOP SIGN
EA.
2.
200.00
200.00
SUBTOTAL OF ITEM F.
700.00
SUBTOTAL OF ITEMS A. THROUGH F.
30,532.75
10% CONTINGENCY $
3,053.28
TOWNSHIP ADMINISTRATION & LEGAL COSTS (3%)S
915.98
CONSTRUCTION OBSERVATION AND ADMINISTRATION (6%) _S
1,831.97
TOTAL ESTIMATED IMPROVEMENTS CONSTRUCTION COST $
36,333.97
Page 2 of 2

MAIDENCREEKTOWNSHIP
SEO ACTIVITY REPORT
December, 2020
Fee Paid to
Date By
SDE #
App. #
Applicant/Activity
Applicant
Billed/Paid
Chk #
120 Koller Rd
16-0019-0471
Z187417
November, 2020 - Transfer septic permit to new owner.
30.00
Paid
1612
281 Blandon Road
7/19/19 -Replacement septic system application. Testing was
performed by previous SEO. Verify test site. Send idemntification
19-0019-0479
form to applicant. Septic system permit cannot be issued until the
Z176966
notarized indemnification is received by SEO.
9/4/19 - Process application and verification of prior testing for new
septic system. Review design/issue permit
No update
$724.00
Paid
1002
65 Troxel Rd.
19-0019-0480
Z203635
10/7/19 - Review design/issue permit for new system
No update
$585.00
Paid
122
Misc Admin
20-0019-0300
General Work
1142 Pleasant Hill Road - Owner wants to subdivide another lot off
of the farm.
2/17/20 - Schedule testing and notify PADEP.
3/5/20 - Probes for primary and replacement system on new lot
and replacement area for existing lot.
3/6/20 - Conduct percolation testing for primary and replacement
system on new lot.
20-0019-0481
3/31/20 -Complete soil reports, send to consultant
Subdivision
6/2/20 - Rec incomplete planning module. Send letter to
consultant.
6/9/20-Communicationsw/PhilAshearandPADEPre:nitrate
easement requirements.
11/9/20 - Discuss septic system options wlconsultant. Spray
irrigation may be a possibility.
12/10/20- Observe additional soil probes per planning module
requirements.
$1,608.00
Paid
114
1070 Maidencreek Road - The property didn't pass the real estate
inspection. Replacement septic system testing is necessary.
20-0019-0482
Z215216
3/17/20 - Conduct soil probes. Dig/presoak perc holes.
3/18/20 - Perform percolation test.
No update
692.00
Paid
872 Park Rd -Replacement system
5/13/20-Process application
5/14/20-Observeprobes
20-0019-0485
Z210426
5/15/20 - Perform percolation test
5/18/20 Soil report and send to deigner
6/11/20 - Review design. Fees due before permit can be issued.
No update
$570.00
Paid
50873
Maidencreek Road; Developer wants to create 3 lots and one
residual lot (4 total).
9/23 & 9/24/20 - Observe soil probes.
20-0019-0487
JoJaz Subdivsion
9/25/20-Observe percolation testing
9/28 & 9/29/20 - Observe percolation testing.
10/15/20 - Discuss testing results w/Phil Ashear.
No update
$1,500.00
Paid
1186
20-0019-0488
Applicant wants to convert the home into an office. Perform site
932 Park Rd
visit and compose letter to re-use septic system.
$180.00
Paid
1019
Cc:T. Unger 2 copies
SEO Desk
projects/maidencreek/20-0019-0300/se0activity

Archived from the Maidencreek Township website. Reproduced unaltered; not an official records repository.