Board of Supervisors
Agenda — January 14, 2021
- Date
- January 14, 2021
- Type
- Agenda
- Year
- 2021
- File
- PDF · 365 KB
Document text
Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 1,913 words
MAIDENCREEKTOWNSHIP BOARDOFSUPERVISORS JANUARY 14, 2021 ENGINEER'S AGENDA Subdivision Review Status Checklist Next Supervisors Meeting February 11, 2021. Subdivision / Zoning / LDP 100 White Star Rd Sketch Plan +24000 SF Building Addition, see SDE Itr. dated 1/6/21. Gun Range regulations draft reviewed w/P.C. on 1/8/20 revisions/additions being made. Burning Ordinance regulation draft reviewed by P.C. on 9/2/2020 additional revisions/additions being made. Projects Street Projects 2021 O Scope of work under review with Twp. Manager and Road Foreman. Storm water basin inspection -- Draft Reports to be finalized. Completed Inspections: Melrose Place Pond 1 & 2 CVS Business Park The Crossing at Maidencreek Shadow Ridge - Phase 2 David Small Tree Tops Hearthstone Assisted Living Storm Damage 241 W. Walnut Tree Dr. - inspected and walked site during two (2) rain events; presented diagrams and sketches @ BOs Meeting 11/12/20. Reviewed Twp. Wide storm water systems; there are over 1167 inlet structures; BOs agreed to form a storm water action committee (one BOS, Manager, Road Foremen, One PC Member and Twp. Engineer) Subdivision Improvement LOC / Escrow Release Schick Dental office Sewage Enforcement Officer Activity Report See Attached Page 1 of 1 I:(Projects\Maidencreek Township/21-0019-0100\Engineer's Agendal01.14.21.docx Most Recent Letter Date 11/10/2020 5/1/2020 10/7/2020 Review 6/3/2020 BOS granted conditional Prel. Approval conditioned on SDE Zoning Variance granted Plan approval 11/12/20 Comments review letter Approved BY BOS 05/14/20 MAIDENCREEK TOWNSHIP, BERKS COUNTY (may reflect more than one extension Extension 11/30/2020 2/28/2021 12/01/20 12/1/2020 3/1/2021 SUBDIVISION STATUS 12/10/2020 Period Ends 07/16/20 09/01/20 09/01/20 90-Day Review 09/01/20 Review Period 04/17/20 06/03/20 06/03/20 90-Day Begins 06/03/20 Plan Stage Prelm/Final Prelm/Final Sketch Plan Prelm Plan for Record Plan Plan APPROVED /PENDING PLANS: Redner's Quickshop and Car Wash David Kopfer Subdivision CURRENT PLANS: Schick Dental Office Jojaz Subdivision Project Name No. SYSTEMSDESIGN SDE ENGINEERING,INC sdernet January 6, 2020 Diane Hollenbach, Township Manager Maidencreek Township 1 Quarry Road Blandon, PA 19510 Re: 100 White Star Road Sketch Plan Review Ms. Hollenbach: Systems Design Engineering, Inc. is in receipt of a Sketch Plan entitled "10o White Star Road." The property is 6.391-acres in size and has frontage on White Star Road and Blandon Avenue in Maidencreek Township. The Plan was prepared by Berks Surveying and Engineering, Inc. The submission consisted of the following: Sketch Plan Sheet 101 Dated 12/22/2020 BACKGROUND: The purpose of the Plan is to expand an existing manufacturing and warehouse building on a ft. would be added. The property is currently served by on-lot sewage and well water. REVIEW: This letter presents comments on the first review of the submitted Plan. ZONING: The property is split-zoned. The west portion of the site, including the accessways, is zoned I - Industrial. The east portion of the site is in the C-R Commercial-Residential Zoning District. The intention is to expand the existing principal structure. Comments on other issues are presented below. I:ProjectsiMaidencreek Township PC/20-0024-0720 - 100 White Star Road ExpansioniSketch Plan Review Letter.docx 1032 James Drive, Leesport, PA 19533.P: 610.916.8500.F:610.916.8501 SchuylkilHaven,PAP:570.385.5549 Boyertown,PA.P:610.369.1319 Maidencreek Township Planning Commission January 6, 2020 Re: 100 White StarRoad Page 2 of 4 Sketch Plan review 1. Per 5220-37, Permitted Uses in the CR District Per subsection A, warehousing is not a permitted use in the CR District. The expansion on to the portion of the parcel zoned CR does not comply with the permitted uses of this district. The applicant may wish to seek relief from the Township Zoning Hearing Board to allow the expansion onto the portion of the property zoned CR. 2. Per $220-38, Area and Bulk Requirements in the CR District The zoning compliance table suggests that the front yard setback would be 21 ft. after the expansion, compared to a requirement of 30 feet. It is unclear how the front yard setback is determined on this plan. The applicant's interpretation of the front yard setback would result in a violation of the 30-foot requirement. The applicant should clarify the interpretation of "front yard" on this site. Additionally, the applicant should explain the interpretation for "side yard" and "rear yard" on this site. 3. Per $220-48, Permitted Uses in the Industrial District Per subsection A, manufacturing and warehousing are permitted uses in the 1 District. 4. Per $220-49, Area and Bulk Requirements in the industrial District The requirements on the portion of the site zoned Industrial appear to be met. As stated above, alternate interpretations for "front yard," "side yard," and "rear yard" may require updates to the zoning compliance tabie. 5. Per $220-64.A, Landscaping All subdivisions and land developments are required to submit a landscape plan to the Township for review and approval as part of the subdivision and land development approval process. o A Landscape plan is required with any subsequent Preliminary Plan or Final Plan submission, the applicant shouid provide and landscaping plan in Maidencreek Township Planning Commission January 6, 2020 Re: 100 White Star Road Page 3 of 4 Sketch Plan review compliance with this Section and Section $190-44 of the Subdivision and Land Development Ordinance. 6. The number of required parking spaces vs. the number of provided parking spaces should be included on the zoning compliance table, rather than included in the notes. LIgHTINg: 1.Per 186-48,Plan Submission A lighting plan is required at the Preliminary Plan stage of land development. The applicant should provide a lighting plan with a future Preliminary Plan or Final Plan submission. SALDQO: 1. Per §190-14, Sketch Plan Sketch Plan requirements are met. STORMWATER MANAGEMENT: 1. Stormwater management is not part of the Sketch Plan review. Appropriate stormwater information, data and calculations should be provided with any subsequent Preliminary/Final Plan. GENERAL: 1. information regarding the capacity of the existing septic should be provided to the this form (attached) with the SEO. Contact: Scot McCaffery, 610-916-8533. The applicant may wish to investigate the feasibility of public sewer in coordination with the Maidencreek Township Authority. SDE Maidencreek Township Planning Commission January 6, 2020 Re: 100White Star Road Page 4 of 4 Sketch Planreview 2. There is an existing access on the east side of the site. The plan labels this an "existing gravel drive to be removed," however; the applicant stated it may remain as an emergency access drive. This should be addressed with any future preliminary/final plan submission. If the gravel drive will remain for the purpose of emergency access, the plan should be reviewed by the Fire Marshal. 3. The applicant may wish to investigate the feasibility of public water as may be required by UcC regulations at the time of building permit application If you should have any questions or comments, please do not hesitate to contact our office. Sincerely, SYSTEMS DESIGN ENGINEERING, INC. Piupd d Philip J. Ashear Township Planning Consultant Cc: Eugene Orlando,Jr./ Township Solicitor Patrick Donovan / Maidencreek Township Authority Bruce Rader, PE, PLS / Applicant's Engineer SDEFile#20-0024-0720 SYSTEMS DESIGN SDE Project Name: Schick Dental Office Municipality: Maidencreek Township Plan Date: 4-24-2020 Date: 4-28-2020 SDEl Project No. : 20-0024-0714 IMPROVEMENTS CONSTRUCTION COST ESTIMATE AND OTHER FEES Description Units Quantity Unit Cost Total A. EROSION & SEDIMENT CONTROL Ea. ROCK CONSTRUCTION ENTRANCE 1. 1,500.00 1,500.00 Ea. 2. CONCRETE WASHOUT 500.00 500.00 18" SILT FENCE L.f. 67 3. 2.25 150.75 18" COMPOST FILTER SOCK L.f. 130 4. 12.00 1,560.00 Ea. 5. INLET PROTECTION 250.00 500.00 EA. PUMPED WATER FILTER BAG 6. 300.00 300.00 EROSION CONTROL BLANKET - ECS-1 S.Y. 1,800 2.00 3,600.00 S.Y. 8. PERMANENTSEEDING & MULCHING 2,852 1.00 2,852.00 ..5. 9. MAINTENANCEAND REMOVAL OF E&S BMPS 500.00 500.00 SUBTOTAL OF ITEM A. 11,462.75 B. STORM DRAINAGE 2'x2' INLET Ea. 1. 900.00 900.00 15" HDPE STORM SEWER L.f. 2. 48 25.00 1,200.00 3. SEEPAGE BED 1 ..y. 45 EXCAVATION 5.00 a. 225.00 C.y. AASHTO NO. 1 STONE b. 31 30.00 930.00 S.Y. 76 FILTER FABRIC 1.75 133.00 Ea. INSPECTION/OVERFLOW PORT 35.00 70.00 L.f. 6"PERFORATEDPVCPIPE 26 10.00 e. 260.00 4. SEEPAGE BED 2 C.y. 16 EXCAVATION 5.00 a. 80.00 C.y. AASHTO NO.1 STONE/DECORATIVE STONE 14 b. 30.00 420.00 S.y. 60 FILTER FABRIC 1.75 C. 105.00 EA. INSPECTION PORT 35.00 d. 35.00 L.f. 204 6"PVCROOFLEADERPIPE 20.00 5. 4,080.00 SUbTOTAL OF ItEm B. 8,438.00 C. DRIVEWAY PAVING WITHIN RIGHT-OF-WAY S.Y. FINE GRADE SUBGRADE 31 1. 1.00 31.00 S.y. 2. 31 6" 2A SUBBASE 6.00 186.00 S.Y. 31 2.5"SUPERPAVE19.0 mmBINDERCOURSE 3. 12.00 372.00 S.y. d. 1.5" SUPERPAVE 9.5 mm WEARING COURSE 31 8.00 248.00 SUBTOTAL OF ITEM C. 837.00 J:/ProjectsIMaidencreek Township PC120-0024-0714 Schick Dental Oficelmpr Cost EstimatelSchick Dental Impr Cons1 Cost Est Page 1 of 2 SYSTEMS DESIGN Project Name: Schick Dental Office Municipality: Maidencreek Township Plan Date: 4-24-2020 Date: 4-28-2020 SDEI Project No. : 20-0024-0714 ITEMS HIGHLIGHTED BELOW HAVE EITHER BEEN ADDED OR REVISED COMPARED TO THE APPLICANT'S ESTIMATE. IMPROVEMENTS CONSTRUCTION COST ESTIMATE AND OTHER FEES Description Units Quantity Unit Cost Total D. SITE LIGHTING 23'POLE MOUNTED LIGHT - SINGLE LUMINAIRE EA. 2,000.00 1. 4,000.00 23'POLEMOUNTED LIGHT-DOUBLE LUMINAIRE EA. 2. 2,500.00 2,500.00 WALL PACK Ea. 3. 800.00 2,400.00 SUBtOtAL Of ItEm D. 8,900.00 E. EA. LANDSCAPING - SHRUBS 65.00 195.00 F. SIGNS Ea. 1. HANDICAP PARKING 250.00 500.00 STOP SIGN EA. 2. 200.00 200.00 SUBTOTAL OF ITEM F. 700.00 SUBTOTAL OF ITEMS A. THROUGH F. 30,532.75 10% CONTINGENCY $ 3,053.28 TOWNSHIP ADMINISTRATION & LEGAL COSTS (3%)S 915.98 CONSTRUCTION OBSERVATION AND ADMINISTRATION (6%) _S 1,831.97 TOTAL ESTIMATED IMPROVEMENTS CONSTRUCTION COST $ 36,333.97 Page 2 of 2 MAIDENCREEKTOWNSHIP SEO ACTIVITY REPORT December, 2020 Fee Paid to Date By SDE # App. # Applicant/Activity Applicant Billed/Paid Chk # 120 Koller Rd 16-0019-0471 Z187417 November, 2020 - Transfer septic permit to new owner. 30.00 Paid 1612 281 Blandon Road 7/19/19 -Replacement septic system application. Testing was performed by previous SEO. Verify test site. Send idemntification 19-0019-0479 form to applicant. Septic system permit cannot be issued until the Z176966 notarized indemnification is received by SEO. 9/4/19 - Process application and verification of prior testing for new septic system. Review design/issue permit No update $724.00 Paid 1002 65 Troxel Rd. 19-0019-0480 Z203635 10/7/19 - Review design/issue permit for new system No update $585.00 Paid 122 Misc Admin 20-0019-0300 General Work 1142 Pleasant Hill Road - Owner wants to subdivide another lot off of the farm. 2/17/20 - Schedule testing and notify PADEP. 3/5/20 - Probes for primary and replacement system on new lot and replacement area for existing lot. 3/6/20 - Conduct percolation testing for primary and replacement system on new lot. 20-0019-0481 3/31/20 -Complete soil reports, send to consultant Subdivision 6/2/20 - Rec incomplete planning module. Send letter to consultant. 6/9/20-Communicationsw/PhilAshearandPADEPre:nitrate easement requirements. 11/9/20 - Discuss septic system options wlconsultant. Spray irrigation may be a possibility. 12/10/20- Observe additional soil probes per planning module requirements. $1,608.00 Paid 114 1070 Maidencreek Road - The property didn't pass the real estate inspection. Replacement septic system testing is necessary. 20-0019-0482 Z215216 3/17/20 - Conduct soil probes. Dig/presoak perc holes. 3/18/20 - Perform percolation test. No update 692.00 Paid 872 Park Rd -Replacement system 5/13/20-Process application 5/14/20-Observeprobes 20-0019-0485 Z210426 5/15/20 - Perform percolation test 5/18/20 Soil report and send to deigner 6/11/20 - Review design. Fees due before permit can be issued. No update $570.00 Paid 50873 Maidencreek Road; Developer wants to create 3 lots and one residual lot (4 total). 9/23 & 9/24/20 - Observe soil probes. 20-0019-0487 JoJaz Subdivsion 9/25/20-Observe percolation testing 9/28 & 9/29/20 - Observe percolation testing. 10/15/20 - Discuss testing results w/Phil Ashear. No update $1,500.00 Paid 1186 20-0019-0488 Applicant wants to convert the home into an office. Perform site 932 Park Rd visit and compose letter to re-use septic system. $180.00 Paid 1019 Cc:T. Unger 2 copies SEO Desk projects/maidencreek/20-0019-0300/se0activity